Megaprojects are often associated with poor delivery performance and poor benefits realization. This article provides a method of identifying, in a quantitative and rigorous manner, the characteristics related to project management success in megaprojects. It provides an investigation of how stakeholders can use this knowledge to ensure more effective design and delivery for megaprojects. The research is grounded in 44 mega-projects and a systematic, empirically based methodology that employs the Fisher's exact test and machine learning techniques to identify the correlation between megaprojects’ characteristics and performance, paving the way to an understanding of their causation.
Population growth, consumerism and linear (take-make-dispose) economy models have been piling up waste for decades. The construction industry is also based primarily on linear economy models, but the good news is that most of the waste can be re-used or recycled. So far, numerous models for managing construction and demolition waste in a sustainable way have been developed, but only a few models have included circular economy approaches. The main objective of this study is to propose an integrated framework for the sustainability assessment of CDW management. Apart from the economic, environmental and social aspects of sustainability, this model also includes circular economy principles. The proposed framework is based on the integration of existing methods: bottom-up materials stock approximation; cost–benefit analysis for criteria calculation; and scenario and multi-criteria decision-making analysis for sustainability. It is suggested that the European average recovery rates should be used for future scenario development. With higher re-use and recycling rates, the potential for the circularity of the recovered waste grows. In an effort to increase circularity in the region, particular attention was devoted to customize the framework and examine its potential for use in the Western Balkan countries. The framework may also be useful in countries with immature construction and demolition waste management.
10 February 2021 in Journal of the Croatian Association of Civil Engineers
Cost estimates in the early stages of project development are essential for making the right decisions, but they are a huge challenge and risk for owners and potential contractors due to limited information about the characteristics of a future highway project. Whereas previous studies were mainly focused on achieving the highest possible estimation accuracy, this paper aims to propose cost-estimation models that can provide satisfactory accuracy with the least possible effort and to compare the perspectives of owners and contractors as the key stakeholders on projects. To determine cost drivers (CDs) that have a high influence on highway-construction costs and require low effort for their establishment, a questionnaire survey was conducted. Based on the key stakeholders’ perceptions and collected data set, cost-estimation models were developed using multiple-regression analysis, artificial neural networks, and XGBoost. The results show that reasonable cost-estimation accuracy can be achieved with relatively low effort for three CDs for the owners’ perspective and five CDs for the contractors’ perspective. Additional inclusion of input CDs in models does not necessarily imply an increase in accuracy. Also, the questionnaire results show that owners are more concerned about environmental issues, whereas contractors are more concerned about the possible changes in resource prices (especially after recent high increases caused by COVID-19 and the Russia–Ukraine war). These findings can help owners and potential contractors in intelligent decision-making in the early stages of future highway-construction projects.
Due to numerous reasons, construction projects often fail to achieve the planned duration. Detecting causes of delays (CoD) is the first step in eliminating or mitigating potential delays in future projects. The goal of research is unbiased CoD detection at a single project level, with the ultimate goal to discover the root causes of delay. The existing approach is based on expert knowledge which is used to create CoD lists for projects in general or groups of similar projects. When applied to a single project, it is burdened with bias, as shown on a case project returning low Spearman Rank correlation values. This research introduces a Delay Root causes Extraction and Analysis Model—DREAM. The proposed model combines expert knowledge, machine learning techniques, and Minutes of Meetings (MoM) as an unutilized extensive source of information. In the first phase, DREAM outputs a CoD list based on occurring frequency in MoM with satisfactory recall values, significantly reducing expert-induced subjectivism. In the second phase, enabled by MoM dates, DREAM adds another dimension to delay analysis—temporal CoD distribution. By analyzing corresponding informative charts, experts can understand the nature of delays and discover the root CoD, allowing intelligent decision making on future projects.