Aleksandar Senić

Dr. Aleksandar Senić

University of Belgrade-Faculty of Civil Engineering, Belgrade, Beograd, Serbia
orcid

Research Focus & Metrics

Academic Career Length

13Years (2014-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
22 March 2023 in Sustainability
Verified
Journal Article
Open access
PDF file
NSNevena Simić
Nevena Simić
NINenad Ivanišević
Nenad Ivanišević
ĐNĐorđe Nedeljković
Đorđe Nedeljković
Aleksandar SenićAleksandar Senić
Aleksandar Senić
ZSZoran Stojadinovic
Zoran Stojadinovic
MIMarija Zoran Ivanovic
Marija Zoran Ivanovic
Cost estimates in the early stages of project development are essential for making the right decisions, but they are a huge challenge and risk for owners and potential contractors due to limited information about the characteristics of a future highway project. Whereas previous studies were mainly focused on achieving the highest possible estimation accuracy, this paper aims to propose cost-estimation models that can provide satisfactory accuracy with the least possible effort and to compare the perspectives of owners and contractors as the key stakeholders on projects. To determine cost drivers (CDs) that have a high influence on highway-construction costs and require low effort for their establishment, a questionnaire survey was conducted. Based on the key stakeholders’ perceptions and collected data set, cost-estimation models were developed using multiple-regression analysis, artificial neural networks, and XGBoost. The results show that reasonable cost-estimation accuracy can be achieved with relatively low effort for three CDs for the owners’ perspective and five CDs for the contractors’ perspective. Additional inclusion of input CDs in models does not necessarily imply an increase in accuracy. Also, the questionnaire results show that owners are more concerned about environmental issues, whereas contractors are more concerned about the possible changes in resource prices (especially after recent high increases caused by COVID-19 and the Russia–Ukraine war). These findings can help owners and potential contractors in intelligent decision-making in the early stages of future highway-construction projects.

16 January 2025 in Mathematics
Verified
Journal Article
Open access
PDF file
Aleksandar SenićAleksandar Senić
Aleksandar Senić
MIMarija Zoran Ivanovic
Marija Zoran Ivanovic
Momčilo DobrodolacMomčilo Dobrodolac
Momčilo Dobrodolac
ZSZoran Stojadinovic
Zoran Stojadinovic
Risk management in construction projects is a critical process aimed at identifying, evaluating, and mitigating potential risks that could impact project performance. Preventive measures play a central role in this process, serving as proactive strategies to minimize the likelihood and impact of risks on project outcomes. This study involved 37 experts from multidisciplinary fields related to road infrastructure, ensuring a diverse and comprehensive perspective on risk evaluation and prevention. The DELPHI method was employed to systematically define key risks and their corresponding preventive measures, providing a structured foundation for further analysis. The experts evaluated 302 preventive measures across 56 risks using 4 predefined criteria: implementation costs, time required for implementation, implementation complexity, and probability of success. A multi-criteria decision making (MCDM) approach was then applied to analyze these evaluations, enabling the prioritization of preventive measures and the allocation of resources toward the most effective strategies. Additionally, fuzzy logic was employed to analyze and validate the results, providing a complementary approach to the MCDM methodology. The results of this research provide a robust framework for risk management, offering practical guidance for decision makers in the construction industry. By integrating expert judgment, systematic evaluation, and advanced analytical methods, this study delivers actionable insights and establishes a reliable methodology for enhancing the effectiveness of risk mitigation in road infrastructure projects.

4 March 2025 in Applied Sciences
Verified
Journal Article
Open access
PDF file
Aleksandar SenićAleksandar Senić
Aleksandar Senić
NSNevena Simić
Nevena Simić
Momčilo DobrodolacMomčilo Dobrodolac
Momčilo Dobrodolac
ZSZoran Stojadinovic
Zoran Stojadinovic
During the execution of road infrastructure projects, project managers face significant challenges, including financial, technical, regulatory, and operational risks. More than 90% of infrastructure projects have incurred costs exceeding initial estimates, impacting both completion timelines and the operational efficiency of road infrastructure. Effectively assessing and managing these risks is crucial for improving project outcomes and ensuring the sustainability of infrastructure investments. To address these challenges, this study developed a hybrid model for risk assessment and management in road infrastructure projects. The model quantifies risks across seven key categories: Design, External, Resource, Employer, Contractor, Engineer, and Project, based on three primary input factors: Environment coefficient, Contractual coefficient, and Design coefficient. Initially, various machine learning models, including linear regression, Random Forest, Gradient Boosting, Stacking Models, and neural networks, were applied to assess risk predictions. However, due to the specific nature of the dataset, these models did not achieve satisfactory predictive accuracy. As a result, fuzzy logic systems (Mamdani and Sugeno) were employed, demonstrating superior performance in modeling risk occurrence probabilities. Comparative analysis between these two fuzzy logic approaches revealed that the Sugeno model provided the most accurate predictions. The findings highlight the benefits of applying fuzzy logic for risk assessment in complex infrastructure projects, providing a structured framework for enhancing decision-making processes. This study provides a structured methodology for accurately predicting risks and enhancing project safety, efficiency, and long-term sustainability.

4 March 2024 in Mechatronics and Intelligent Transportation Systems
Verified
Journal Article
Open access
PDF file
Aleksandar TrifunovićAleksandar Trifunović
Aleksandar Trifunović
Aleksandar SenićAleksandar Senić
Aleksandar Senić
SCSvetlana Cicevic
Svetlana Cicevic
TITijana Ivanisevic
Tijana Ivanisevic
VVVedran Vukšić
Vedran Vukšić
SSSreten Simović
Sreten Simović
In the context of traffic safety, the interplay between the road environment and the human factor emerges as a critical determinant of the severity of road crash consequences. This study was designed to explore the perceptions of professional drivers regarding the road environment, with a particular focus on the elements that either contribute to or mitigate safety risks. A comprehensive survey was conducted, wherein 118 professional drivers from the Republic of Serbia were asked to rate photographs depicting various road environments in terms of safety. The investigation aimed to elucidate the extent to which these drivers recognize and assess road hazards, as well as to examine potential variations in their evaluations based on demographic characteristics. The findings underscore the significant impact of the road environment on traffic safety, particularly highlighting the role of solid obstacles such as trees, pillars, and masonry objects. When vehicles veer off the road, collisions with these obstacles frequently result in exacerbated outcomes of road crashes. The methodology employed in this research involved a quantitative analysis of the survey responses, ensuring a systematic evaluation of the drivers' perceptions. The study contributes to the existing body of knowledge by offering insights into the evaluative processes of professional drivers concerning the road environment, thereby informing strategies aimed at enhancing driver safety.

4 September 2024 in Sustainability
Verified
Journal Article
Open access
PDF file
Aleksandar SenićAleksandar Senić
Aleksandar Senić
Momčilo DobrodolacMomčilo Dobrodolac
Momčilo Dobrodolac
ZSZoran Stojadinovic
Zoran Stojadinovic
Road infrastructure is a significant factor in the development of any country, affecting economic growth, social development, and environmental sustainability. Large infrastructure projects often face significant risks and uncertainties, which can lead to delays, budget over-runs, and an insufficient quality of the completed work. These issues undermine the economic viability of projects and affect the overall efficiency of infrastructure development. For these reasons, based on a literature review and completed project analysis, the risks that lead to an increasing Contract Price (ICP) and an Extension of Time (EoT) for the construction of the project are identified. Based on the results of the completed project analysis, the values of the ICP and EoT were quantified. Also, the probability of the occurrence of each risk in new projects was calculated. Based on the obtained results, a model was defined that groups risks into clusters. Risks in the first cluster should have priority for funding, and preventive measures are defined for them. The model obtained in this way can greatly enhance project management in real-world conditions and can lead to a significant reduction in project time and budget over-runs.

13 September 2024 in Mathematics
Verified
Journal Article
Open access
PDF file
Aleksandar SenićAleksandar Senić
Aleksandar Senić
Momčilo DobrodolacMomčilo Dobrodolac
Momčilo Dobrodolac
ZSZoran Stojadinovic
Zoran Stojadinovic
Road infrastructure plays a crucial role in the development of countries, significantly influencing economic growth, social progress, and environmental sustainability. Major infrastructure projects are frequently challenged by substantial risks and uncertainties, leading to delays, budget overruns, and compromised quality. These issues can undermine the economic viability and efficiency of projects, making effective risk management essential for minimizing negative impacts and ensuring project success. For these reasons, a study was conducted using a Sugeno fuzzy logic system applied to completed projects. The resulting model is based on 10 project characteristics and provides highly accurate predictions for Extension of Time (EoT) and Increasing Contract Price (ICP). By utilizing this model, project management can be significantly improved through more accurate forecasting of potential delays and cost overruns. The high precision of the Sugeno fuzzy logic system enables better risk assessment and proactive decision-making, allowing project managers to implement targeted strategies to mitigate risks and optimize project outcomes.