Nevena Simić

Ms. Nevena Simić

orcid

Research Focus & Metrics

Academic Career Length

6Years (2021-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
22 March 2023 in Sustainability
Verified
Journal Article
Open access
PDF file
NSNevena Simić
Nevena Simić
NINenad Ivanišević
Nenad Ivanišević
ĐNĐorđe Nedeljković
Đorđe Nedeljković
Aleksandar SenićAleksandar Senić
Aleksandar Senić
ZSZoran Stojadinovic
Zoran Stojadinovic
MIMarija Zoran Ivanovic
Marija Zoran Ivanovic
Cost estimates in the early stages of project development are essential for making the right decisions, but they are a huge challenge and risk for owners and potential contractors due to limited information about the characteristics of a future highway project. Whereas previous studies were mainly focused on achieving the highest possible estimation accuracy, this paper aims to propose cost-estimation models that can provide satisfactory accuracy with the least possible effort and to compare the perspectives of owners and contractors as the key stakeholders on projects. To determine cost drivers (CDs) that have a high influence on highway-construction costs and require low effort for their establishment, a questionnaire survey was conducted. Based on the key stakeholders’ perceptions and collected data set, cost-estimation models were developed using multiple-regression analysis, artificial neural networks, and XGBoost. The results show that reasonable cost-estimation accuracy can be achieved with relatively low effort for three CDs for the owners’ perspective and five CDs for the contractors’ perspective. Additional inclusion of input CDs in models does not necessarily imply an increase in accuracy. Also, the questionnaire results show that owners are more concerned about environmental issues, whereas contractors are more concerned about the possible changes in resource prices (especially after recent high increases caused by COVID-19 and the Russia–Ukraine war). These findings can help owners and potential contractors in intelligent decision-making in the early stages of future highway-construction projects.

4 March 2025 in Applied Sciences
Verified
Journal Article
Open access
PDF file
Aleksandar SenićAleksandar Senić
Aleksandar Senić
NSNevena Simić
Nevena Simić
Momčilo DobrodolacMomčilo Dobrodolac
Momčilo Dobrodolac
ZSZoran Stojadinovic
Zoran Stojadinovic
During the execution of road infrastructure projects, project managers face significant challenges, including financial, technical, regulatory, and operational risks. More than 90% of infrastructure projects have incurred costs exceeding initial estimates, impacting both completion timelines and the operational efficiency of road infrastructure. Effectively assessing and managing these risks is crucial for improving project outcomes and ensuring the sustainability of infrastructure investments. To address these challenges, this study developed a hybrid model for risk assessment and management in road infrastructure projects. The model quantifies risks across seven key categories: Design, External, Resource, Employer, Contractor, Engineer, and Project, based on three primary input factors: Environment coefficient, Contractual coefficient, and Design coefficient. Initially, various machine learning models, including linear regression, Random Forest, Gradient Boosting, Stacking Models, and neural networks, were applied to assess risk predictions. However, due to the specific nature of the dataset, these models did not achieve satisfactory predictive accuracy. As a result, fuzzy logic systems (Mamdani and Sugeno) were employed, demonstrating superior performance in modeling risk occurrence probabilities. Comparative analysis between these two fuzzy logic approaches revealed that the Sugeno model provided the most accurate predictions. The findings highlight the benefits of applying fuzzy logic for risk assessment in complex infrastructure projects, providing a structured framework for enhancing decision-making processes. This study provides a structured methodology for accurately predicting risks and enhancing project safety, efficiency, and long-term sustainability.

11 November 2022 in Sustainability
Verified
Journal Article
Open access
PDF file
MIMarija Zoran Ivanovic
Marija Zoran Ivanovic
ĐNĐorđe Nedeljković
Đorđe Nedeljković
ZSZoran Stojadinovic
Zoran Stojadinovic
DMDejan Marinković
Dejan Marinković
NINenad Ivanišević
Nenad Ivanišević
NSNevena Simić
Nevena Simić
Due to numerous reasons, construction projects often fail to achieve the planned duration. Detecting causes of delays (CoD) is the first step in eliminating or mitigating potential delays in future projects. The goal of research is unbiased CoD detection at a single project level, with the ultimate goal to discover the root causes of delay. The existing approach is based on expert knowledge which is used to create CoD lists for projects in general or groups of similar projects. When applied to a single project, it is burdened with bias, as shown on a case project returning low Spearman Rank correlation values. This research introduces a Delay Root causes Extraction and Analysis Model—DREAM. The proposed model combines expert knowledge, machine learning techniques, and Minutes of Meetings (MoM) as an unutilized extensive source of information. In the first phase, DREAM outputs a CoD list based on occurring frequency in MoM with satisfactory recall values, significantly reducing expert-induced subjectivism. In the second phase, enabled by MoM dates, DREAM adds another dimension to delay analysis—temporal CoD distribution. By analyzing corresponding informative charts, experts can understand the nature of delays and discover the root CoD, allowing intelligent decision making on future projects.

27 October 2025 in Promet - Traffic&Transportation
Verified
Journal Article
Open access
PDF file
Aleksandar SenićAleksandar Senić
Aleksandar Senić
NSNevena Simić
Nevena Simić
Momčilo DobrodolacMomčilo Dobrodolac
Momčilo Dobrodolac
ZSZoran Stojadinovic
Zoran Stojadinovic
Risks causing delays in the construction of roads and highways frequently lead to substantial economic and social consequences, with project timelines extending up to three times beyond their initial schedules. These risks not only extend the project timeline but also escalate the overall project execution cost. Despite extensive research on construction-related risks globally, a notable gap remains in studies specifically addressing the risk factors that cause delays in road projects. Analysing completed projects is crucial to derive practical and applicable results, as they offer essential insights into the real-world challenges and risks that may cause timeline extensions and budget escalations. Such an approach ensures that the findings are grounded in actual project outcomes, thereby enhancing their relevance and effectiveness in improving future project planning and risk management. For these reasons, this study aims to analyse 25 project characteristics across 28 completed projects, from which three project complexity coefficients are derived. Additionally, a list of risks is defined based on expert evaluations, and the dominant risks are identified. For each of these dominant risks, a prediction model is constructed using Sugeno fuzzy logic, enabling more accurate and sustainable risk management and mitigation in future projects.

1 December 2021
Verified
Conference Paper
Open access
PDF file
NSNevena Simić
Nevena Simić
PPPredrag S. Petronijević
Predrag S. Petronijević
ADAleksandar Devedžić
Aleksandar Devedžić
MIMarija Zoran Ivanovic
Marija Zoran Ivanovic
This paper analyses the problem of estimating the required quantities of major work items in the construction of residential and residential-commercial buildings using machine learning algorithms. The goal is to form a model that will provide a fast and sufficiently accurate estimate of the quantities of major work items, based on a small amount of known information on the technical characteristics and the environment of future residential and residential-commercial buildings. The case study included 71 projects of residential and residential-commercial buildings construction realised on the territory of the Republic of Serbia. Several models have been developed, and the paper presents those models that had the best performances. The models developed in this way can significantly contribute to resource planning and the accuracy of cost estimates in the early project phases.

12 August 2026 in Earthquake Spectra
Verified
Journal Article
Open access
ZSZoran Stojadinovic
Zoran Stojadinovic
ĐNĐorđe Nedeljković
Đorđe Nedeljković
MIMarija Ivanović
Marija Ivanović
DMDejan Marinković
Dejan Marinković
NSNevena Simić
Nevena Simić
BSBozidar Stojadinovic
Bozidar Stojadinovic
Postearthquake workflows currently support three distinct classes of decisions: safety clearance through rapid tagging, portfolio‐level economic damage estimation through probabilistic loss models, and field inspections based on locally defined survey forms, which may subsequently trigger project‐specific strengthening through retrofit design. However, commitment to executable repair work at the building level, what to repair, where, and in what quantities, remains largely ad hoc, despite being required early in recovery for the majority of lightly to moderately damaged buildings. This paper introduces the RELA Repair Module (RELA‐RM), a rapid, observation‐driven framework that translates visually observed damage into executable repair quantities through predefined decision logic and standardized repair norms. Damage is recorded at the level of individual building elements and transformed into a building‐level Repair Bill of Quantities (RBoQ) expressed in person‐hours and material quantities. Repair cost and duration are subsequently derived through externally supplied pricing and workforce assumptions, while optional qualitative escalation indications flag cases that may require detailed engineering assessment. Spatial localization of repair actions is retained throughout the workflow to preserve building‐level organization of repair scope. Uncertainty is treated as bounded variability arising from three identifiable sources within the workflow: photographic measurement effects, human annotation variability, and dispersion in standardized productivity norms. These contributions are propagated to produce an approximate combined dispersion of ≈26%, interpreted as an engineering bound on expected variability in executable repair quantities. The framework is implemented and demonstrated for masonry walls, while the underlying decision principle is intended to be extensible to other building elements and typologies.