Álvaro Santiago

Mr. Álvaro Santiago

Ministry of Science and Technology
orcid

Research Focus & Metrics

Academic Career Length

7Years (2020-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
9 July 2020 in Smart Cities
Verified
Journal Article
Open access
PDF file
MLMarcos Lafoz
Marcos Lafoz
Gustavo NavarroGustavo Navarro
Gustavo Navarro
JMJorge Jesus Torres Miranda
Jorge Jesus Torres Miranda
ÁSÁlvaro Santiago
Álvaro Santiago
Jorge NájeraJorge Nájera
Jorge Nájera
Marcos BlancoMarcos Blanco
Marcos Blanco
The paper analyses the alternatives for the power supply of a Hyperloop type railway transport. The particular case of the technology of the Spanish company ZELEROS was studied. Based on previous technical specifications related to both the first prototype and a commercial system, different options were analyzed. We selected the use of a linear motor driven by a single power electronic converter, a distribution scheme comprising different sections along the acceleration area of the track, and an energy storage system based on supercapacitors for the energy supply. The power/energy ratio and the cycle capability are the reasons to become a feasible and competitive solution. A preliminary design methodology for the energy storage requirements is presented in the paper. Once the type of linear motor was selected, the power supply scheme was presented, based on a motor-side power electronic converter and a DC/DC converter which connects to the energy storage devices. An additional low power grid-tie converter for the recharge of the energy storage system was also used. Different track sections were defined, connected to the power electronic converter through corresponding switches, being supplied sequentially when the capsule presence is detected along the track. The particular characteristics of this application, with relatively short traction track area, as well as the high energy recuperation ratio due to the low losses, make more suitable the use of energy storage systems as the source of power supply than the direct connection to the grid.

13 February 2021 in Energies
Verified
Journal Article
Open access
PDF file
Gustavo NavarroGustavo Navarro
Gustavo Navarro
Marcos BlancoMarcos Blanco
Marcos Blanco
JMJorge Jesus Torres Miranda
Jorge Jesus Torres Miranda
Jorge NájeraJorge Nájera
Jorge Nájera
ÁSÁlvaro Santiago
Álvaro Santiago
MLMarcos Lafoz
Marcos Lafoz
The aim of this paper is to present a methodology for dimensioning an energy storage system (ESS) to the generation data measured in an operating wave energy generation plant connected to the electric grid in the north of Spain. The selection criterion for the ESS is the compliance of the power injected into the grid with a specific active-power ramp-rate limit. Due to its electrical characteristics, supercapacitor (SC) technology is especially suitable for this application. The ESS dimensioning methodology is based on a mathematical model, which takes into account the power generation system, the chosen ramp-rate limit, the ESS efficiency maps and electrical characteristics. It allows one to evaluate the number of storage cabinets required to satisfy the needs described, considering a compromise between the number of units, which means cost, and the reliability of the storage system to ensure the grid codes compliance. Power and energy parameters for the ESS are obtained from the calculations and some tips regarding the most efficient operation of the SC cabinets, based on a stepped switching strategy, are also given. Finally, some conclusions about the technology selection will be updated after the detailed analysis accomplished.

22 August 2021
Verified
Book Chapter
Closed access
PDF file
Marcos BlancoMarcos Blanco
Marcos Blanco
JTJorge Torres
Jorge Torres
MSMiguel Santos-Herran
Miguel Santos-Herran
ÁSÁlvaro Santiago
Álvaro Santiago
GNGustavo Navarro
Gustavo Navarro
MLMarcos Lafoz
Marcos Lafoz