The paper aims at demonstrating that the consideration of constant start-up costs and ramps of the thermal generating units for assessing the contribution of pumped-hydro energy storage to reduce the scheduling costs of hydrothermal power systems with high wind penetration, may yield unrealistic results. For this purpose, an isolated power system is used as a case study. The contribution of a pumped-storage hydropower plant to reduce the system scheduling costs is assessed in the paper by using a hydrothermal weekly unit commitment model. The model considers different start-up costs and ramps of the thermal generating units as a function of the start-up type. The effects of including pumped hydro energy storage in the system on the integration of wind energy, and on the start-ups and capacity factors of the thermal generating units are also evaluated. The results of the paper demonstrate that the consideration of constant start-up costs and ramps of the thermal generating units yields unrealistic results, and that the pumped-storage hydropower plant may help reduce the system scheduling costs by 2.5–11% and integrate wind power and may allow dispensing with some inflexible thermal generating units
28 April 2017 in IEEE Transactions on Power Systems
This paper presents a mixed integer linear programming model for the hourly energy and secondary regulation reserve scheduling of a price-taker and closed-loop variable speed pumped-storage hydropower plant, considering the energy losses due to the use of electronic frequency converters. The plant participates in the day-ahead energy market and in the secondary regulation service of the Iberian electric power system. The model is utilised to compare the income of the plant with and without considering the variable speed technology, with synchronous or asynchronous machines, with and without bypassing the frequency converter in generating mode, and with and without perfect information of the electric power system data. Numerical testing results demonstrate that the operation with the variable speed technology could help notably to enlarge the income of the power plant and that the secondary regulation reserve market might be the main source of revenue for the power plant.
1 December 2015 in Energy Conversion and Management