Jorge ROVIRA

Mr. Jorge ROVIRA

FFII
orcid

Research Focus & Metrics

Academic Career Length

7Years (2020-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
14 July 2023 in Applied Sciences
Verified
Journal Article
Open access
PDF file
Carlos Vera RomeroCarlos Vera Romero
Carlos Vera Romero
FGFernando Garnacho
Fernando Garnacho
JKJoni Kluss
Joni Kluss
CMChristian Mier
Christian Mier
FÁFernando Álvarez
Fernando Álvarez
ASAntonio Squicciarini
Antonio Squicciarini
The insulation condition of HVDC grids consisting of cable systems, GIS, and converters should be monitored by partial discharge (PD) analysers using artificial intelligence (AI) tools for efficient insulation diagnosis. Although there are many experiences of PD monitoring solutions developed for the supervision of the insulation condition of HVAC grids using PD analysers, there are no standardised requirements for their qualification available yet. The international technical specification TS IEC 62478 provides general rules for PD measurements using electromagnetic methods but does not define performance requirements for qualification tests. HVDC and HVAC PD analysers must be tested by unambiguous test procedures. This paper compiles experiences of using PD analysers with HFCT sensors in HVAC grids (cable systems, GIS, and AIS) to define a qualification procedure for HVAC systems. This procedure is applicable to HVDC grids (cable systems, GIS, AIS, and converters) because the particularities related to the insulation behaviour under HVDC voltage are also considered. Representative PD sources are discussed in HVAC and HVDC positive and negative polarity. The PD pulse trend of representative insulation defects in HVDC cable systems is quite different from that of HVAC grids. Special attention should be paid to the acquisition of PD signals in HVDC grids since few pulses appear in solid insulations, mainly during voltage changes (polarity reversals or surges), but rarely in continuous operation with constant direct voltage. A synthetic PD simulator has been developed to reproduce trains of PD pulses or noise signals, similar to those that can appear in the power network. A set of three functionality tests has been developed for qualification of the diagnostic capabilities of PD analysers working up to 30 MHz addressed to HVDC or HVAC grids: (1) PD recognition test, (2) PD clustering test, and (3) PD location test. This qualification procedure has been validated by means of a round-robin test performed by five research institutes (RISE, FFII, TUDelft, TAU, and UPM) using commercial and in-development AI PD recognition and clustering tools to demonstrate its robustness and applicability. Applying this qualification procedure, two PD methods for electrical detection and prevention of insulation defects have been approved, one for HVAC and the other for HVDC grids.

5 November 2020 in Sensors
Verified
Journal Article
Open access
PDF file
Daniela IstrateDaniela Istrate
Daniela Istrate
AKAbderrahim Khamlichi
Abderrahim Khamlichi
SSSoureche Soccalingame
Soureche Soccalingame
JRJorge ROVIRA
Jorge ROVIRA
DFDOMINIQUE FORTUNE
DOMINIQUE FORTUNE
FGFernando Garnacho
Fernando Garnacho
Current standard EN 50463-2 indicates the tests and the requirements to be satisfied for an energy measurement system of a traction unit for railway applications. Some of these tests are to be done with several harmonics superposed on the rated voltage, respectively current. However, no calibration systems satisfying the standard requirements were available few years ago. The work performed in the EURAMET project “MyRailS” leads to the development of fictive power sources and reference measurement systems described in this paper. Therefore, it is possible to generate distorted 25 kV-50 Hz voltages with harmonics up to 5 kHz and 90° phase-fired currents up to 500 A with harmonics up to 5 kHz. The generated power is measured by developed traceable reference systems with accuracy better than 0.5%.

11 July 2023 in Sensors
Verified
Journal Article
Open access
PDF file
FGFernando Garnacho
Fernando Garnacho
FÁFernando Álvarez
Fernando Álvarez
AEAlf-Peter Elg
Alf-Peter Elg
CMChristian Mier
Christian Mier
KLKari Lahti
Kari Lahti
MHMiran Haider
Miran Haider
On-site partial discharge (PD) measurements have turned out to be a very efficient technique for determining the insulation condition in high-voltage electrical grids (AIS, cable systems, GIS, HVDC converters, etc.); however, there is not any standardised procedure for determining the performances of PD measuring systems. In on-line and on-site PD measurements, high-frequency current transformers (HFCTs) are commonly used as sensors as they allow for monitoring over long distances in high-voltage installations. To ensure the required performances, a metrological qualification of the PD analysers by applying an evaluation procedure is necessary. A novel evaluation procedure was established to specify the quantities to be measured (electrical charge and PD repetition rate) and to describe the evaluation tests considering the measured influence parameters: noise, charge amplitude, pulse width and time interval between consecutive pulses. This procedure was applied to different types of PD analysers used for off-line measurements, sporadic on-line measurements and continuous PD monitoring. The procedure was validated in a round-robin test involving two metrological institutes (RISE from Sweden and FFII from Spain) and three universities (TUDelft from the Netherlands, TAU from Finland and UPM from Spain). With this round-robin test, the effectiveness of the proposed qualification procedure for discriminating between efficient and inappropriate PD analysers was demonstrated. Furthermore, it was shown that the PD charge quantity can be properly determined for on-line measurements and continuous monitoring by integrating the pulse signals acquired with HFCT sensors. In this case, these sensors must have a flat frequency spectrum in the range between several tens of kHz and at least two tens of MHz, where the frequency pulse content is more significant. The proposed qualification procedure can be useful for improving the future versions of the technical specification TS IEC 62478 and the standard IEC 60270.

29 November 2021 in Sensors
Verified
Journal Article
Open access
PDF file
AKAbderrahim Khamlichi
Abderrahim Khamlichi
FGFernando Garnacho
Fernando Garnacho
PSPascual Simon
Pascual Simon
JRJorge ROVIRA
Jorge ROVIRA
ARAngel Ramirez
Angel Ramirez
Periodic calibrations of Energy Measurement Systems (EMS) installed in locomotives must be carried out to demonstrate the required accuracy established in the EN 50463-2 standard according to European Parliament and Council Directive 2008/57/EC on the interoperability of rail systems within the Community. As a result of the work performed in the “MyRailS” EURAMET project an AC calibration facility was developed consisting of a fictive power source was developed. This fictive power source can generate distorted sinusoidal voltages up to 25 kV-50 Hz and 15 kV-16.7 Hz as well as distorted sinusoidal currents up to 500 A with harmonic content up to 5 kHz or phase-fired current waveform stated in EN50463-2 standard. These waveforms are representative of those that appear during periods of acceleration and breaking of the train. Reference measuring systems have been designed and built consisting of high voltage and high current transducers adapted to multimeters, which function as digital recorders to acquire synchronized voltage and current signals. An approved procedure has been developed and an in-depth uncertainty analysis has been performed to achieve a set of uncertainty formulas considering the influence parameters. Different influence parameters have been analyzed to evaluate uncertainty contributions for each quantity to be measured: rms voltage, rms current, active power, apparent power and non-active power of distorted voltage and current waveforms. The resulting calculated global expanded uncertainty for the developed Energy Measuring Function calibration set up has been better than 0.5% for distorted waveforms. This paper is focused on presenting the complete set of expressions and formulas developed for the different influence parameters, necessary for uncertainty budget calculation of an Energy Measuring Function calibration.