Recently, wind energy conversion systems (WECSs) have attracted attention due to their effective application in renewable energy sources. It is a complex system with multi-variables, strong coupling, non-linearity, and variable parameters; however, traditional control systems are inadequate in answering the demands of complex systems. In order to solve the complexity and improve the transient stability during grid faults and power fluctuations, this paper proposes a fuzzy logic system with the linear extended state observer (FLS-LESO) applied to WECSs based on a permanent magnet synchronous generator (PMSG). The FLS-LESO consists of a fuzzy logic controller, a conventional PD controller, and the linear extended state observer (LESO). This paper analyzes the mathematical model of a wind power system and combines it with LESO to improve the estimation accuracy of the observer and further improve the control performance. In the simulation study, the control performance of the FLS-LESO was also tested under various operating conditions using the MATLAB/Simulink simulation platform to verify the correctness and effectiveness of the control system.
The coordination between a hybrid energy storage system (HESS) and photovoltaic (PV) power station can significantly reduce grid-connected PV power fluctuations. This study proposes a HESS capacity optimal allocation method considering the grid-connected PV requirements. Firstly, based on the power fluctuation requirements in the PV power station grid-connected regulations, the maximum power point tracking working point switching control is performed for the PV power station, from which the grid-connected PV power and HESS power are obtained. Then, a capacity optimal allocation method and frequency division energy management strategy (EMS) for HESS is proposed to find the energy response and power response of each energy storage source. Furthermore, a multi-objective optimization function with HESS cutoff frequency as the independent variable is constructed, and the input cost of HESS and the life loss of the lithium battery are optimized. Finally, the overall strategy is compared and analyzed under the scenarios of three typical PV power fluctuations. Simulation results show that the control strategy has a good smoothing effect on PV power fluctuations. From the perspective of the annual comprehensive input cost, HESS realizes the optimal capacity allocation when the cutoff frequency is 0.0066 Hz.
In this paper, a dual-layer grid comprehensive resource optimizing allocation model is proposed, which considers power quality controlling and load optimization scheduling under large-scale application of distributed electric heating. The upper-layer planning aims to minimize the active power loss of the distribution network, the minimum voltage deviation, and the minimum investment cost of the power quality control device. The capacity configuration of the management device and the number and location of the commutation switch configuration were determined. The lower layer is load optimization scheduling, with the minimum number of action switches and the minimum three-phase imbalance as the planning goals, and the decision variable is the state of the commutation switch. By co-simulation through Matlab and OpenDSS, the improved particle swarm algorithm and genetic algorithm are used for multi-objective optimization and the solution. In this way, the capacity configuration of reactive power compensation and active filter, as well as the installation position and switch state of the commutation switch are optimized and managed. Finally, taking the rural low-voltage distribution network in the Tongzhou District as an example, simulations considering the variation in the distributed electric heating penetration rate in the range of 20–80% are carried out. The calculation example results show that the proposed algorithm is effective, can effectively improve the power factor, reduces the harmonic content of the distribution network and the three-phase unbalance, and significantly improves the distribution network voltage.
With the significant progress of the “coal to electricity” project, the electric kiln equipment began to be connected to the distribution network on a large scale, which caused power quality problems such as low voltage, high harmonic distortion rate, and high reactive power loss. This paper proposes a two-stage power grid comprehensive resource optimization configuration model. A multi-objective optimization solution based on the joint simulation platform of Matlab and OpenDSS is developed. The solution aims to control harmonics and optimize reactive power. In the first stage, a multi-objective optimization model is established to minimize the active network loss, voltage deviation, and equipment cost under the constraint conditions of voltage margin, power factor, and reactive power compensation capacity. Furthermore, the first stage uses a particle swarm optimization (PSO) algorithm to optimize the location and capacity of both series and parallel compensation devices in the distribution network. In the second stage, the optimal configuration model of the active power filter assumes the cost of the APF as the objective function and takes the harmonic voltage content rate, the total voltage distortion rate, and the allowable harmonic current as the constraint conditions. The proposed solution eliminates the harmonics by uniformly configuring active filters in the distribution network and centrally control harmonics at the system level. Finally, taking the IEEE33 distribution network as the object and considering the change of electric furnace permeability in the range of 20%–50%, the simulation results show that the proposed algorithm effectively reduces the distribution network’s loss, its harmonic content and significantly improve its voltage.