Nurulafiqah Nadzirah Mansor

Dr. Nurulafiqah Nadzirah Mansor

orcid

Research Focus & Metrics

Academic Career Length

12Years (2015-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
24 February 2021 in IEEE Access
Verified
Journal Article
Open access
MUMuhammad Usama
Muhammad Usama
Hazlie MokhlisHazlie Mokhlis
Hazlie Mokhlis
Mahmoud MoghavvemiMahmoud Moghavvemi
Mahmoud Moghavvemi
NMNurulafiqah Nadzirah Mansor
Nurulafiqah Nadzirah Mansor
MAMajed Alotaibi
Majed Alotaibi
ABAbdullah Akram Bajwa
Abdullah Akram Bajwa
Technology advancement in the last few decades allows large penetration of renewable energy resources in the distribution network (DN). The integration of such resources has shown a substantial impact on DN through power loss reduction and improved network reliability. Besides this, the existing protection system has encountered coordination challenges due to the bidirectional power flow, different types and capacity of generation sources, and changes in fault levels due to network operating modes (grid-connected or islanded). Such conditions may cause the relays to malfunction and imperil the effectiveness of the existing protection scheme. Therefore, an efficient and robust protection coordination scheme is imperative to avoid network reliability and stability issues to the grid. This review paper presents a comparative analysis of various protection techniques implemented to alleviate the impact of integrated resources into DN. Moreover, a comparison of classical and modified protection approaches in terms of advantages, shortcomings, and implementation costs is presented. The prime objective of this study is to highlight the prominence of utilizing user-defined programmable relays for modern DNs. Moreover, recommendations are presented by considering the application of user-defined relay characteristics that can be proved as a robust protection scheme to cope with the protection challenges in existing and future power systems developments.

28 May 2020 in IEEE Access
Verified
Journal Article
Open access
ADAMIL DARAZ
AMIL DARAZ
SMSuheel Abdullah Malik
Suheel Abdullah Malik
Hazlie MokhlisHazlie Mokhlis
Hazlie Mokhlis
IHIhsan Haq
Ihsan Haq
GLGhulam Fareed Laghari
Ghulam Fareed Laghari
NMNurulafiqah Nadzirah Mansor
Nurulafiqah Nadzirah Mansor
This paper proposed an improved structure of Proportional Integral Derivative (PID) controller called as Integral Proportional Derivative (I-PD), applied for Automatic Generation Control (AGC) of Multi-Source Interconnected Power System (IPS). The parameters of the proposed controller are optimized with a newly developed, powerful, nature-inspired meta-heuristic technique known as Fitness Dependent Optimizer (FDO). To show the efficacy of the proposed controller and the technique used, they have been tested on three different system models. Initially, a two-equal area of diverse source generation including reheat-thermal, gas, and hydro power system is considered. In the second scenario, the same power system model is used with addition of two non-linearities; Generation Rate Constraint (GRC) and Governor Dead Band (GDB). Lastly, multiple non-linearities including Governor Dead Band (GDB), Time Delay (TD), Generation Rate Constraint (GRC), and Boiler Dynamics (BD) have been considered to make the initial system more realistic and practical. The outcome from the proposed techniques is also compared with some recently meta-heuristic algorithms such as Teaching Learning Based Optimization (TLBO), Particle Swarm Optimization (PSO) and Firefly Algorithm (FA). From the results, it has been perceived that the proposed technique shows superior performance in respect of Overshoot (Osh), Undershoot (Ush) and Settling Time (Ts) of the system frequency.

27 October 2020 in IEEE Access
Verified
Journal Article
Open access
ADAMIL DARAZ
AMIL DARAZ
SMSuheel Abdullah Malik
Suheel Abdullah Malik
Hazlie MokhlisHazlie Mokhlis
Hazlie Mokhlis
IHIhsan Haq
Ihsan Haq
FZFarhan Zafar
Farhan Zafar
NMNurulafiqah Nadzirah Mansor
Nurulafiqah Nadzirah Mansor
This paper presents a Fractional Order Integral-Proportional Derivative (FOI-PD) controller for Automatic Generation Control (AGC) of two-area Interconnected Power System (IPS) with six multiple generations units in a restructured environment. Further, the two-area IPS is composed of multiple non-linearities with Time Delay (TD), Boiler Dynamic (BD), Governor Dead Zone/Band (GDZ/GDB) and Generation Rate Constraint (GRC). The gains of the proposed controller are optimized by a most recent powerful meta-heuristic algorithm known as Improved-Fitness Dependent Optimizer (I-FDO). The efficiency of the proposed approach is compared with other techniques such as Firefly Algorithm (FA), Fitness Dependent Optimizer (FDO) and Teaching Learning Based Optimization (TLBO) algorithms. Further, to enhance the performance of the system, Redox Flow Batteries (RFB) is incorporated in each area and Thyristor Controlled Series Compensator (TCSC) in the tie-line of the power system. Results reveal that our proposed approach performs superior in terms of less Overshoot (Os), Settling time (Ts) and Undershoot (Us). Robustness of the proposed controller is verified by changing system parameters within a range of ± (25) %.

8 January 2020 in IEEE Access
Verified
Journal Article
Open access
MSMohammad Al Samman
Mohammad Al Samman
Hazlie MokhlisHazlie Mokhlis
Hazlie Mokhlis
NMNurulafiqah Nadzirah Mansor
Nurulafiqah Nadzirah Mansor
HMHasmaini Mohamad
Hasmaini Mohamad
HSHadi Suyono
Hadi Suyono
NSNorazliani Md. Sapari
Norazliani Md. Sapari
Optimal Network Reconfiguration (NR) is a well-accepted approach to minimize power loss and enhance voltage profile in the Electrical Distribution Networks (EDN). Since the NR problem contains huge combinational search space, most researchers consider the meta-heuristic techniques to attain NR solution. However, these meta-heuristic techniques do not guarantee to obtain the optimal solution besides they require large processing time to converge. This is mainly due to (1) random initialization and updating of population and (2) the continuous verification of population during the search process. With the aim of reducing the computational time and improving the consistency in obtaining the optimal solution as well as minimizing power loss and enhancing the voltage profile of the EDN, this work proposes a new method based on two-stage optimizations. The proposed method introduces an approach to simplify the network into simplified network graph. Then, this approach is utilized for guided initializations and generations of the population and for the proper population’s codification. The proposed method is implemented using the firefly algorithm and verified on 33-bus and 118-bus test systems. The results show the ability of the proposed method to obtain the optimal solution within fast computational time and with superior consistency compared to the conventional methods.

3 May 2023 in IEEE Access
Verified
Journal Article
Open access
IKirfan khan
irfan khan
Hazlie MokhlisHazlie Mokhlis
Hazlie Mokhlis
NMNurulafiqah Nadzirah Mansor
Nurulafiqah Nadzirah Mansor
HIHazlee Azil Illias
Hazlee Azil Illias
MUMuhammad Usama
Muhammad Usama
LALilik Jamilatul Awalin
Lilik Jamilatul Awalin
The reliability of a power system depends on its ability to handle fluctuations and varying load demands, as uncontrolled frequency deviations can lead to load-shedding and blackouts. Optimally tuned controllers are essential for Load Frequency Control (LFC) applications to efficiently stabilize the power system by minimizing frequency undershoots, overshoots, and settling time. This paper proposed the application of novel Golden Eagle Optimization (GEO) algorithm for the optimal tuning of the LFC controller, which has not been previously employed in any LFC applications. Moreover, this paper presents the first-ever implementation of a hybrid energy storage system consisting of Vanadium Redox Flow Battery (VRFB) and Super Magnetic Energy Storage System (SMES) coupled with AC/HVDC transmission lines in a multi-area power system. A GEO optimized Proportional-Integrative-Derivative (GEO-PID) robust controller is designed with the Integral Time Absolute Error (ITAE) objective function to enhance the power system’s stability. The proposed controller is tested on two and four areas power systems considering the sensitivity and nonlinearity of the power systems. A robustness test is also performed to verify the stability of the system under randomly chosen loading conditions. In comparison with particle swarm optimization, dragonfly algorithm, sine cosine algorithm, ant lion optimization, and whale optimization algorithm, the GEO-PID controller significantly reduced the settling time up to 80% for different area’s frequencies. Simulation results indicate that the proposed controller outperforms other recent optimization algorithms by effectively dampening the frequency and tie-line deviations with less settling times, as well as reduced frequency undershoots and overshoots.

11 November 2019 in IEEE Access
Verified
Journal Article
Open access
MNMohamad Norshahrani
Mohamad Norshahrani
Hazlie MokhlisHazlie Mokhlis
Hazlie Mokhlis
ABAb Halim Abu Bakar
Ab Halim Abu Bakar
MRMir Toufikur Rahman
Mir Toufikur Rahman
OBOla Badran
Ola Badran
NMNurulafiqah Nadzirah Mansor
Nurulafiqah Nadzirah Mansor
Research on network reconfiguration (NR) considering distributed generations (DG) is typically concerns on the issues of power loss, voltage deviation, DG sizing as well as its placement, which are important and required in the planning stage. On the other hand, another important aspect which often neglected in this stage is coordination of protection devices which is essential to prevent the network from damages following system breakdown. Without sufficient attention given to the protection coordination during NR, there is a possibility for the protective devices to miscoordinate and consequently lead to system blackout, due to changes in current flow and fault level. Therefore, this paper proposed an NR method for distribution networks with DG, incorporating protection devices. The proposed method aims to find the optimal configuration and DG size with minimum power loss, and at the same time ensuring protective devices operate correctly during normal and fault condition. Constraints on protection coordination and DG size are explicitly formulated in the proposed method. The validity of the proposed method is analyzed on three commonly used IEEE 33-bus, 69-bus and 118-bus distribution systems, employing the firefly algorithm (FA) and evolutionary programming (EP) algorithm. Comparative studies are done to prove the validity and robustness of the proposed method.