Hend Ali Omar

Prof. Dr. Hend Ali Omar

Department of Civil Engineerng, Faculty of Engineering
orcid

Research Focus & Metrics

Academic Career Length

6Years (2021-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
22 November 2021 in IEEE Access
Verified
Journal Article
Open access
AMAbdalrhman Milad
Abdalrhman Milad
IAIBRAHIM A. ADWAN
IBRAHIM A. ADWAN
SMSayf A. Majeed
Sayf A. Majeed
ZMZubair Ahmed Memon
Zubair Ahmed Memon
Munder BilemaMunder Bilema
Munder Bilema
Nur Izzi Md YusoffNur Izzi Md Yusoff
Nur Izzi Md Yusoff
Machine learning (ML) models are excellent alternative solutions to model complex engineering issues with high reliability and accuracy. This paper presents two extensively explored ensemble models for predicting asphalt pavement temperature, the Markov chain Monte Carlo (MCMC) and random forest (RF). The RF and multiple MCMC (RF-MCMC) were used to hybridise the proposed algorithms for the optimal prediction of asphalt pavement temperature. This study used thermal instruments to measure the asphalt pavement temperature in Gaza Strip, Palestine. The temperature measurements were made at a two-hour interval from March 2012 to February 2013. The temperature data was used to model the pavement temperature. More than 7200 measured pavement temperatures were used to train and validate the proposed models. The validation showed that the ML models are satisfactory. The modelling results ensured the value of the proposed hybridisation models in predicting the asphalt pavement temperature levels. The developed hybrid algorithms regression model achieved acceptable and better prediction results with a coefficient of determination (R2) of 0.96. Generally, the results confirmed the significance of the proposed hybrid model as a reliable alternative computer-aided model for predicting asphalt pavement temperature.

2 March 2022 in Sustainability
Verified
Journal Article
Open access
PDF file
PBPeyman Babashamsi
Peyman Babashamsi
Shabir Hussain KhahroShabir Hussain Khahro
Shabir Hussain Khahro
HOHend Ali Omar
Hend Ali Omar
AAAbdulnaser Al-Sabaeei
Abdulnaser Al-Sabaeei
AMAbdul Muhaimin Memon
Abdul Muhaimin Memon
Nur Izzi Md YusoffNur Izzi Md Yusoff
Nur Izzi Md Yusoff
Airport pavements deteriorate with age due to the impacts of environmental factors and air traffic. There is a dearth of studies on the scheduling of airport pavement maintenance and the importance of assessing the different scheduling strategies using Life-Cycle Cost Analysis (LCCA). An analysis of the cost–benefit study of a delay in maintenance alternatives should be done to determine whether a one-year delay is beneficial. This study concerns airport pavement management systems and the significance of a delay in several maintenance and preservation strategies depending on the analysis of inputs and outputs based on data from the Rocky Mountain Metropolitan airport in Jefferson County, United States. Herein, four preventive maintenance strategies were reviewed: three of the strategies involve crack treatment, namely crack sealing, patching, and a slurry seal, while the review of surface treatment only looks at the overlay method, which is done based on two Pavement Condition Indices (PCI 90 and PCI 80), and the resulting improvement in service life. The novel integrated LCCA + LCA program, namely PAVECO, is introduced in this research to compare alternatives from perspectives that are not purely economic, by considering direct costs, indirect costs, and salvage values. Results show that a one-year delay in preventive maintenance increases the deterministic life cycle cost by 16%. Based on the sensitivity analysis of the discount rate, the total cost shows more than a 10% decrease as the discount rate increased by 1%. Additionally, the uncertainty in PCI 80 is higher than that in PCI 90. The probabilistic model provides stakeholders with the opportunity to consider the alternative which is most suited to the allocated budget. It can be concluded that, based on the simulation of the effects of maintenance activities during the pavement life-cycle, preventive maintenance should start when the roads are in good condition to prompt managers and stakeholders to analyze the costs during the life-cycle. Postponing the preventive maintenance of airport pavement could raise the cost by 50%. The maintenance of airport pavements in developing countries is still one of the main challenges of pavement management due to the maintenance only being done when it is necessary.

24 May 2021 in Materials
Verified
Journal Article
Open access
PDF file
Munder BilemaMunder Bilema
Munder Bilema
MAMohamad Yusri Aman
Mohamad Yusri Aman
Norhidayah Abdul HassanNorhidayah Abdul Hassan
Norhidayah Abdul Hassan
ZMZubair Ahmed Memon
Zubair Ahmed Memon
HOHend Ali Omar
Hend Ali Omar
AMAbdalrhman Milad
Abdalrhman Milad
Researchers are exploring the utilisation of reclaimed asphalt pavement (RAP) as a recycled material to determine the performance of non-renewable natural aggregates and other road products such as asphalt binder, in the construction and rehabilitation stage of asphalt pavements. The addition of RAP in asphalt mixtures is a complex process and there is a need to understand the design of the asphalt mixture. Some of the problems associated with adding RAP to asphalt mixtures are moisture damage and cracking damage caused by poor adhesion between the aggregates and asphalt binder. There is a need to add rejuvenators to the recycled mixture containing RAP to enhance its performance, excepting the rutting resistance. This study sought to improve asphalt mixture performance and mechanism by adding waste frying oil (WFO) and crumb rubber (CR) to 25 and 40% of the RAP content. Moreover, the utilisation of CR and WFO improved pavement sustainability and rutting performance. In addition, this study prepared five asphalt mixture samples and compared their stiffness, moisture damage and rutting resistance with the virgin asphalt. The results showed enhanced stiffness and rutting resistance of the RAP but lower moisture resistance. The addition of WFO and CR restored the RAP properties and produced rutting resistance, moisture damage and stiffness, which were comparable to the virgin asphalt mixture. All waste and virgin materials produce homogeneous asphalt mixtures, which influence the asphalt mixture performance. The addition of a high amount of WFO and a small amount of CR enhanced pavement sustainability and rutting performance.

22 July 2021 in Applied Sciences
Verified
Journal Article
Open access
PDF file
HOHend Ali Omar
Hend Ali Omar
HKHerda Yati Binti Katman
Herda Yati Binti Katman
Munder BilemaMunder Bilema
Munder Bilema
MAMohamed Khalifa Ali Ahmed
Mohamed Khalifa Ali Ahmed
AMAbdalrhman Milad
Abdalrhman Milad
Nur Izzi Md YusoffNur Izzi Md Yusoff
Nur Izzi Md Yusoff
This study was conducted to investigate the effect of ageing on bitumen, before and after modification. Nano-clay modified bitumen (NCMB) was produced by adding nano-clay (NC) to 60/70 penetration grade bitumen; then, the binder was tested using conventional tests for properties such as penetration, softening point and viscosity. These tests were carried out on the modified binder before and after ageing. A rolling thin film oven (RTFO) was used to simulate short-term ageing (STA), and a pressure ageing vessel (PAV) was used to simulate long-term ageing (LTA) for the modified binder. After initial results showed an improvement for the modified bitumen regarding the effect of ageing, the investigation continued using Fourier transform infrared spectroscopy (FTIR), where the microstructure distribution of the modified binder before and after ageing was observed. Finally, there was no doubt that the effect of ageing on mixtures should be investigated. For this step, the indirect tensile strength (ITS) test, which highlights the strength changes that occur for the mixtures after ageing, was selected. The results indicated that the tensile strength of mixtures made with modified bitumen showed better resistance against ageing when NC was added, which is in good agreement with the results of previous binder tests. The results of this study show that the modification of bitumen using nano-clay as an additive improves the ageing resistance of the binder, which is consequently reflected in the strength of the asphalt mixture.

24 March 2022 in Sustainability
Verified
Journal Article
Open access
PDF file
PBPeyman Babashamsi
Peyman Babashamsi
Shabir Hussain KhahroShabir Hussain Khahro
Shabir Hussain Khahro
HOHend Ali Omar
Hend Ali Omar
Sri Atmaja P. RosyidiSri Atmaja P. Rosyidi
Sri Atmaja P. Rosyidi
AAAbdulnaser Al-Sabaeei
Abdulnaser Al-Sabaeei
Nur Izzi Md YusoffNur Izzi Md Yusoff
Nur Izzi Md Yusoff
Airports play a critical role in transporting goods and passengers and supporting the growth of the world economy. Airports spend huge sums annually to maintain and improve pavement functions by expanding the runways, taxiways, and aprons, and perform routine maintenance and rehabilitation of the existing pavements. Besides the traditional direct costs, a comprehensive airport pavement management system should also consider indirect costs such as fuel, crew, passenger delay, aircraft maintenance, and loss of airport revenue when conducting a life-cycle cost analysis (LCCA). Engineers, managers, and stakeholders can make better decisions on the appropriate pavement maintenance and rehabilitation strategies by performing economic analyses of the direct and indirect costs. This study performed probabilistic and deterministic LCCA to contrast the effect of direct costs vis-a-vis indirect costs in airport pavement management. A case study found that indirect costs could contribute up to 20% of the total costs when using Portland cement concrete (PCC), hot mixed asphalt (HMA), and crack seat overlay (CSOL). Previous research did not give much attention to maintenance since the researchers believed that routine maintenance makes up only an insignificant percentage of the LCCA. However, routine maintenance of HMA and CSOL makes up 10.2% and 14.2% of the total cost. The rehabilitation cost of PCC makes up 16.3% of the total cost, and the rehabilitation cost for HMA and CSOL makes up 25.4% and 35.2% of the total cost.