EVANGELOS CHATZISTYLIANOS

Mr. EVANGELOS CHATZISTYLIANOS


Research Focus & Metrics

Academic Career Length

3Years (2024-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
27 May 2024 in Energies
Verified
Journal Article
Open access
PDF file
ECEVANGELOS CHATZISTYLIANOS
EVANGELOS CHATZISTYLIANOS
GPGeorgios Psarros
Georgios Psarros
SPStavros A. Papathanassiou
Stavros A. Papathanassiou
This paper investigates grid export constraints applicable to photovoltaic (PV) and wind farm (WF) installations, both with and without behind-the-meter storage, aimed at enhancing grid hosting capacity. The study focuses on static output power limitations, i.e., simple export constraints that are preventively imposed on renewable energy source (RES) plants regardless of the prevailing network congestion conditions. These constraints are easy to apply, implemented ex ante and out of market, and do not require additional investments in energy storage or advanced devices. They also yield a measurable increase in hosting capacity and grid utilization, with their impact on RES plant operation and return of investment straightforwardly calculable. Analysis defines the level and shape of these constraints assuming an indicative acceptable curtailment level of 5% for each RES technology attributed to the preventing action of the imposed limitations, while the respective implications for RES energy yield and investment viability are explored. The findings indicate that an export power limitation of ca. 68% is effective for stand-alone PVs, while a stepwise static limitation is necessary for stand-alone WFs and WFs with integrated storage to manage midday solar generation peaks. PV plants tightly coupled with storage facilities can handle static limitations as low as 35% with minimal impact on the economic feasibility of the investments.

3 April 2024 in Energies
Verified
Journal Article
Open access
PDF file
ECEVANGELOS CHATZISTYLIANOS
EVANGELOS CHATZISTYLIANOS
GPGeorgios Psarros
Georgios Psarros
SPStavros A. Papathanassiou
Stavros A. Papathanassiou
This paper presents a quantitative assessment of the value of hydroelectric power plants (HPPs) in power systems with a significant penetration of variable renewable energy sources (VRESs). Through a capacity expansion planning (CEP) model that incorporates a detailed representation of HPP operating principles, the study investigates the construction and application of HPP rule curves essential for seasonal operation. A comparative analysis is also conducted between the proposed rule curve formulation and alternative modeling techniques from the literature. The CEP model optimizes installed capacities per technology to achieve predefined VRES penetration targets, considering hourly granularity and separate rule curves for each HPP. A case study involving twelve reservoir hydropower stations and two open-loop pumped hydro stations is examined, accounting for standalone plants and cascaded hydro systems across six river basins. The study evaluates the additional generation and storage required to replace the hydropower fleet under high VRES penetration levels, assessing the resulting increases in total system cost emanating from introducing such new investments. Furthermore, the study approximates the storage capabilities of HPPs and investigates the impact of simplified HPP modeling on system operation and investment decisions. Overall, the findings underscore the importance of reevaluating hydro rule curves for future high VRES penetration conditions and highlight the significance of HPPs in the energy transition towards carbon neutrality.

24 August 2024 in Energies
Verified
Journal Article
Open access
PDF file
CKChristiana Kostaki
Christiana Kostaki
PDPantelis Dratsas
Pantelis Dratsas
GPGeorgios Psarros
Georgios Psarros
ECEVANGELOS CHATZISTYLIANOS
EVANGELOS CHATZISTYLIANOS
SPStavros A. Papathanassiou
Stavros A. Papathanassiou
This paper presents a novel methodology for modeling hydropower plants (HPPs) with and without pumping capability in resource adequacy assessment studies. The proposed method is based on the premise that HPPs should maximize their contribution to system adequacy within their technical constraints by using the energy reserves in their upper reservoirs without significantly deviating from their market schedule. The approach of this paper differs from the conventional operating policies for incorporating HPPs into resource adequacy assessment studies, which either adhere to a fixed market schedule or perform peak shaving, and are inelastic to real-time events or do not resort to realistic temporal correlations between natural water inflows on upper reservoirs and the water discharge needs to cover demand peaks, respectively. The modeling approach focuses on large-reservoir HPPs with natural inflows and is generic enough to deal with both stations incorporating pumping capabilities and those without. It utilizes the state-of-the-art Monte Carlo simulation technique to form the availability of system assets and determine the loss of load incidents. The market schedule and level of reservoir fulfillment for the HPPs are retrieved from a cost-optimal power system simulation algorithm executed offline before the application of the resource adequacy assessment. The effectiveness of the proposed methodology is demonstrated through its implementation in a case study of a power system experiencing different levels of adequacy, comparing the obtained results with various traditional HPP modeling methods from the literature.