The aim of the article is to compare the operational efficiency of the city buses in various stages of their operational life. Technical readiness tests, repair costs and revenues during the six years of operation were conducted using two popular bus makes as an example (domestic and imported). Based on these tests, the characteristics of the operational efficiency of buses was determined. It has been shown that the service life has a significant effect on the operational efficiency. The division of the total operational period of the vehicle into the warranty and post-warranty period was considered and a new division was introduced, of the „period of full operational usefulness” and “period of limited operational usefulness”. This new division of service life into stages makes it possible to determine the most reasonable limit of the vehicle usage until it is taken out of service. It can also be used when choosing a vehicle make as part of a fleet renewal or extension program.
27 June 2016 in Eksploatacja i Niezawodność – Maintenance and Reliability
The purpose of this paper was to present a reliability comparison of two types of city transport buses. Case study on the example of the well-known brands of city buses: Solaris Urbino 12 and Mercedes-Benz 628 Conecto L used at Municipal Transport Company in Lublin was presented in details. A reliability index for the most failure parts and complex systems for the period of time failures was determined. The analysis covered damages of the following systems: engine, electrical system, pneumatic system, brake system, driving system, central heating and air-conditioning and doors. Reliability was analyzed based on Weibull model. It has been demonstrated, that during the operation significant reliability differences occur between the buses produced nowadays.
The aim of this study was to analyze the impact of the categories of bus downtime caused by the necessity of their repair on the availability indicator. A retrospective study covering 12 years of bus operation was carried using the selected municipal transport company as an example. The share of the selected categories of downtime in the total time of vehicle downtime was analyzed. The Spearman’s rank correlation coefficient was used for the analysis. The research covered seven makes and types of buses and six categories of downtime. A ranking of the downtime categories was developed according to the criterion of the statistical dispersion of stoppage time as a measure of their unpredictability. It was shown that categorized unavailability was strongly dependent on the rank of downtime and loosely dependent on the age of buses. In practical applications, the test results may be useful in improving the fleet maintenance processes, selecting the make of new buses or development of models for safety margin availability.
Contemporary research on electric buses focuses mainly on the following issues: energy efficiency, range and transport costs, and traction battery technology. However, little research has been conducted on operational reliability. This article presents a comparative assessment of the reliability of electric buses in relation to combustion engine buses. The research was conducted under real conditions in the city of Lublin, Poland. The reliability functions of buses and their structural components were determined based on the Weibull distribution. It was shown that electric buses have a shorter distance between failures than combustion engine buses of analogous capacity. The statistical significance of the differences in reliability between electric and combustion engine buses was verified. The suitability of the Weibull model as a model of bus reliability in comparative studies was verified. The results of the research can be used to monitor current sustainable public transport development programs and to improve bus diagnostic and maintenance systems in transport companies.
When a trolleybus travels through insulated sections of the overhead contact line, it experiences momentary power interruptions, which adversely affect the vehicle’s on-board auxiliary subassemblies. To reduce these negative effects, one can harness energy recovered via regenerative braking. A model power supply circuit diagram for structural systems of the trolleybus is proposed. Simulation tests were carried out to develop a method for analyzing power supply to trolleybus auxiliary devices and verify it in a real-life example. The results allow determination of the limit power that can be generated by the trolleybus drive system to feed auxiliary devices during interruptions in power supply from the overhead contact line. The possibility of powering the on-board auxiliary equipment of a trolleybus using energy from recuperation with a traction motor is presented.