Jin Li

Jin Li


Research Focus & Metrics

Academic Career Length

5Years (2022-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
24 December 2023 in Buildings
Verified
Journal Article
Open access
PDF file
XSXupeng Sun Xupeng Sun
Xupeng Sun Xupeng Sun
DGDedong Guo
Dedong Guo
JLJin Li
Jin Li
Zhen LiuZhen Liu
Zhen Liu
MXMeng Xu
Meng Xu
SYShihua Yang
Shihua Yang
This study investigates the application of foam asphalt (FA) to enhance the compaction effectiveness of a hot in-place recycling asphalt mixture (HIR-AM) during the HIR process of old road surfaces. Initially, the process parameters for FA preparation were determined through expansion-rate and half-life tests. Subsequently, the study focused on evaluating the impact of FA on the compaction quality of HIR-AM. Performance assessments were conducted through rutting tests, low-temperature bending tests, Hamburg wheel tracking tests, dynamic modulus analyses, and various other experiments to evaluate the road performance of HIR-FAM. Finally, the research findings were validated through practical engineering applications, and the construction process for HIR-FAM was summarized. The research results reveal that the optimal foaming temperature for SBS asphalt is 170 °C, with an ideal water content of 1.7%. Under the same compaction temperature, HIR-FAM demonstrated a significant reduction in void content, ranging from 3.8% to 21.2% compared to HIR-AM. Moreover, a higher proportion of FA usage resulted in a more substantial decrease in void content. Compared to HIR-AM, HIR-FAM exhibited notable improvements, including an 11.6% increase in dynamic stability, a 13.4% enhancement in bending strength, a 13.3% increase in maximum bending strain, an 8.1% improvement in residual stability, and an 8.5% boost in freeze–thaw splitting strength. Furthermore, HIR-FAM demonstrated superior water-thermal stability and resistance to low-frequency loads. Paving a test road verified that the adoption of foam asphalt in thermal recycling led to a compaction density increase of over 0.79% compared to traditional in situ thermal recycling sections, with improved compaction uniformity.

18 April 2022 in Applied Sciences
Verified
Journal Article
Open access
PDF file
YCyanchen cui
yanchen cui
JLJin Li
Jin Li
LZLi Zhu
Li Zhu
SZShen Zuo
Shen Zuo
MYMiaozhang Yu
Miaozhang Yu
Xinzhuang CuiXinzhuang Cui
Xinzhuang Cui
REOB (Recycled Engine Oil Bottom) rejuvenated asphalt can solve the problems of environmental pollution and resource waste. In order to improve the performance of REOB rejuvenated asphalt, an SBS modifier was applied. An orthogonal test was carried out to optimize the preparation scheme of SBS/REOB-modified rejuvenated asphalt, and the physical rheological properties and microscopic mechanisms of modified rejuvenated asphalt with different SBS and REOB dosages were studied. The test results show that the optimal mixture of the SBS/REOB-modified and rejuvenated asphalt is 9% REOB + 4.5% SBS, the optimal shear time is 40 min, and the shear rate is 5000 r/min. SBS modification of the REOB rejuvenated asphalt can obtain the same excellent high temperature performance as ordinary SBS-modified asphalt, and the modification process can greatly improve the high-temperature deformation resistance of rejuvenated asphalt. After SBS modification of the REOB rejuvenated asphalt, its S value is significantly lower than the base asphalt and the REOB rejuvenated asphalt, and its m value is also greatly improved compared with the base asphalt and the REOB rejuvenated asphalt, indicating that the low-temperature performance of the modified rejuvenated asphalt is greatly improved compared with the rejuvenated asphalt and is better than the base asphalt. The fluorescence microscopic test revealed that both the modified rejuvenated asphalt and the SBS-modified new asphalt prepared in the laboratory showed a continuous asphalt phase, and the SBS phase of the modified rejuvenated asphalt could basically reach the level of finished modified asphalt.
1

16 June 2022 in Coatings
Verified
Journal Article
Open access
PDF file
JLJin Li
Jin Li
YLYingyong Li
Yingyong Li
CXChongsheng Xin
Chongsheng Xin
HZHaoyu Zuo
Haoyu Zuo
PAPing An
Ping An
Peng LiuPeng Liu
Peng Liu
Accelerated pavement testing (APT) is an effective method to study the long-term performance of pavement. Therefore, the dynamic strain behavior analysis of asphalt pavement has important guiding significance in the study of pavement failure modes. To explore the dynamic response of a high-content plant-mixed hot-reclaimed asphalt mixture under a dynamic load of vehicles, a full-scale test road was paved, and ALT biaxial accelerated loading test equipment was used to simulate the dynamic loads of vehicles. Based on parameters such as axle load, temperature, speed, and loading times, the development law for the bottom strain of the three pavement structures was analyzed. The test results show that the most unfavorable position of the asphalt pavement load is located just below the centerline of the wheel track on one side, and the damage effect of a single double-axle wheel load is far greater than that of two single-axle wheel loads. Then, the longitudinal tensile strain of the pavement bottom always maintains the alternating state of compression-tension and compression. The longitudinal tensile strain of the pavement bottom is larger than the transverse tensile strain, and transverse fatigue cracks appear first. Under normal temperature conditions, the bottom tensile strains of the three composite pavement structures under different axial loads are close, and the pavement performance of the hot-recycled asphalt pavement of structure A and structure B can meet the specification requirements. The relationship between the bottom strain and axle load is nonlinear and is directly related to the tire ground pressure, and the difference in the tensile and compressive strain values of the bottom of the three composite pavement structures is small. Under high temperature conditions, the bottom layer temperature of structure A and structure B is lower than that of structure C, and the thermal heat transfer efficiency of hot-recycled asphalt pavement is lower than that of ordinary asphalt pavement. Additionally, the longitudinal tensile strain is about 1–1.5 times that of the transverse tensile strain. Based on the Boltzmann function, the accumulative tensile strain prediction model was established to reflect the relationship between the cumulative strain at the bottom and the number of loads.

6 May 2022 in Applied Sciences
Verified
Journal Article
Open access
PDF file
SZShen Zuo
Shen Zuo
QZQingyu Zhang
Qingyu Zhang
JLJin Li
Jin Li
Peng LiuPeng Liu
Peng Liu
FCFengkun Cui
Fengkun Cui
YCYing Chen
Ying Chen
High-speed railways are built in deep soft-soil foundations interlayered with hard materials. However, the hard layers cannot be penetrated by conventional foundation treatment. Moreover, the project cost is sometimes prohibitive, which is an issue for post-construction subsidence control. The bag grouting pile is a special grouting-pile-reinforcement technique for treating soft-soil foundations interlayered with hard materials. This paper conducted tests on the Ningbo-Taizhou-Wenzhou ballast track passenger railway, combining a conventional mixing-pile-foundation (not through hard layer) processing station and the bag-grouting-pile-processing subgrade line. Using field tests combined with numerical calculation, the lateral displacement, settlement and pile–soil stress were tested to obtain the working properties of the grouting-pile-composite foundation. The variation in the law of lateral displacement, settlement, and pile–soil stress of the foundation was studied. The results showed that the post-construction subsidence of bag-grouting-pile- and conventional mixing-pile-foundation control was less than 15 cm and 30 cm, respectively, which met the design requirements. The results also showed that the design scheme was reasonable (load-sharing ratio of bag-pile-foundation pile soil-based test was reasonable). The numerical calculation showed a change in pile diameter. It also showed that pile spacing could not improve subsidence-control properties, bag grouting pile can promote pore-pressure dissipation and accelerate consolidation, and pile spacing can be increased to cut project costs incurred by the pile-bearing capacity.

3 June 2026 in Sensors
Verified
Journal Article
Open access
PDF file
ZCZhaoyang Chen
Zhaoyang Chen
JLJin Li
Jin Li
XZXu Zhang
Xu Zhang
JBJun-wei Bi
Jun-wei Bi
To address the lack of long-term, wide-area surface deformation observations along the geologically complex Dangxiong–Yangbajing section of the G6 Expressway in the frozen-ground region of the Qinghai–Tibet Plateau, where conventional monitoring is insufficient, we applied Small Baseline Subset Interferometric Synthetic Aperture Radar (SBAS-InSAR) to retrieve surface deformation within a 2.0 km corridor on both sides of the highway from 24 November 2021 to 26 December 2024, and to characterize the spatiotemporal evolution of deformation. We then integrated eight explanatory factors (slope, surface roughness, distance to rivers, distance to faults, surface soil moisture, precipitation, land surface temperature (LST), and fractional vegetation cover (FVC)). Geodetector was used to quantify their explanatory power and spatial heterogeneity with respect to deformation. The results show pronounced spatially uneven settlement along this highway segment, with maximum annual settlement rates exceeding −45 mm/a. Five settlement centers were identified, including two major pavement subsidence zones. Distance to faults and soil moisture showed higher single-factor explanatory power, whereas FVC, precipitation, and LST also contributed to deformation heterogeneity. Interaction detection further indicated that the interactions between fault-related conditions with vegetation, soil moisture, precipitation, and LST substantially enhanced the explanatory power, suggesting that the deformation pattern was associated with multi-factor coupling rather than a single dominant environmental factor. These findings demonstrate the utility of integrating SBAS-InSAR with Geodetector analysis for corridor-scale highway deformation assessment and provide a remote sensing basis for targeted hazard assessment and risk mitigation for highways in frozen-ground environments.

13 October 2026 in Buildings
Verified
Journal Article
Open access
PDF file
LJLongfei Jin
Longfei Jin
世田世铜 田
世铜 田
XSXiaopeng Shi
Xiaopeng Shi
JLJin Li
Jin Li
HZHenggen Zhang
Henggen Zhang
JBJun-wei Bi
Jun-wei Bi
Pretensioned precast pavement slabs exhibit reduced compressive stress near their free ends owing to the finite transfer length of prestressing strands. This study investigated an 800 mm self-stressing concrete end segment using five mixtures containing 0%, 6%, 10%, 12%, and 18% expansive agent and a 3700 mm × 975 mm × 240 mm instrumented slab monitored during strand release and for 180 days thereafter. The E10 and E12 restrained specimens developed calculated self-stresses of 1.36 and 1.53 MPa, respectively, whereas the E18 specimen exhibited a visible longitudinal crack. At 28 days, the expansive mixtures attained compressive and flexural strengths of at least 59.2 and 7.7 MPa, respectively. In the slab, strand-induced compression was approximately 0.50 MPa at 125 mm from the end and 1.25 MPa in the interior, indicating a local deficit of 0.75 MPa. The mean end-segment strain 24 h before release was 221.23 με, corresponding to 1.86 MPa of calculated restraint stress. Total compression at 125 mm reached 2.24 MPa immediately after release and was estimated at 1.58 MPa on day 140 before thermal correction. A full-length compatibility model estimated the end-plate device contribution at 0.12 MPa after release and 0.07 MPa on day 140. The monitored release response indicates that restrained expansion restored compression in the slab end relative to the interior reference.