Włodzimierz Jefimowski

Dr. Włodzimierz Jefimowski


Research Focus & Metrics

Academic Career Length

9Years (2018-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 August 2018 in Electric Power Systems Research
Verified
Journal Article
Closed access
WJWłodzimierz Jefimowski
Włodzimierz Jefimowski
Adam SzelągAdam Szeląg
Adam Szeląg

15 March 2020 in Energy
Verified
Journal Article
Closed access
WJWłodzimierz Jefimowski
Włodzimierz Jefimowski
Adam SzelągAdam Szeląg
Adam Szeląg
MSMarcin Steczek
Marcin Steczek
Anatolii NikitenkoAnatolii Nikitenko
Anatolii Nikitenko

7 April 2022 in IEEE Transactions on Transportation Electrification
Verified
Journal Article
Closed access
MSMarcin Steczek
Marcin Steczek
WJWłodzimierz Jefimowski
Włodzimierz Jefimowski
TMTadeusz Maciołek
Tadeusz Maciołek
SBSławomir Barański
Sławomir Barański
The traction substation in conventional power supply systems for trams is a bottleneck of the system. It requires the connection with medium-voltage grid, demands high values of instant power and its centralized topology generates additional energy losses. Since the availability of low-power photovoltaic (PV) generation is increasing in the utility system, we propose to replace conventional substations with a distributed system of low-power devices cooperating with low-voltage grid and PV installations owned by individual households. The proposed in this article distributed power supply system for trams (DPSS-T) consists of multiple traction aggregators (TAs) equipped with energy storage devices (ESDs) which are distributed along the tram line. In order to evaluate the benefits of applying DPSS-T this proposed system was compared with the conventional topology regarding the energy losses in terms of annual operation. Moreover, the following aspects have been studied for the wide range EDS sizes and PV generation: PV energy injection into the power utility system, the utilization of installed ESD, and the contribution of PV generation in energy consumed by traction vehicles. At the same time, the energy management for this new topology has been proposed. The ESDs are charged with relatively low power, between tram runs and discharged with full power during the runs. The suggested energy management eliminates peaks in substation power demand. The obtained results show that despite the fact that the proposed DPSS-T is supplied from low-voltage grid the energy losses are reduced by 58%–69%.

25 April 2025 in Electronics
Verified
Journal Article
Open access
PDF file
Adam SzelągAdam Szeląg
Adam Szeląg
WJWłodzimierz Jefimowski
Włodzimierz Jefimowski
TMTadeusz Maciołek
Tadeusz Maciołek
Anatolii NikitenkoAnatolii Nikitenko
Anatolii Nikitenko
MWMaciej Wieczorek
Maciej Wieczorek
MLMirosław Lewandowski
Mirosław Lewandowski
This paper proposes the sizing optimization method and energy management strategy for a stationary hybrid energy storage system dedicated to a DC traction power supply system. The hybrid energy storage system consists of two modules—a supercapacitor, mainly dedicated to regenerative energy utilization, and a Li-ion battery, aimed to peak power reduction. The sizing method and energy management strategy proposed in this paper aim to reduce the aging effect of lithium-ion batteries. It is shown that the parameters of both modules could be sized independently. The supercapacitor module parameters are sized based on the results of a simulation determining the regenerative power, resulting in limited catenary receptivity. The simulation model of the DC electrification system is validated by comparing the results of the simulation with the measurements of 15 min average power in a 24 h cycle as average values of one year. The battery module is sized based on the statistical data of 15 min substation power value occurrences. The battery energy capacity, its maximum discharge C-rate, and the conditions determining its operation are optimized to achieve the maximum ratio of annual income resulting from peak power reduction to annual operating cost resulting from the battery aging process and total life cycle. The case study prepared for a typical 3 kV DC substation with mixed railway traffic shows that peak power could be reduced by ~1 MW, giving a ~10-year payback period for battery module installation, while the energy consumption could be decreased by 1.9 MWh/24 h, giving a ~7.5-year payback period for supercapacitor module installation. The payback period of the whole energy storage system (ESS) is ~8.4 years.

29 December 2022 in Energies
Verified
Journal Article
Open access
PDF file
WJWłodzimierz Jefimowski
Włodzimierz Jefimowski
ZDZbigniew Drążek
Zbigniew Drążek
This paper presents a conception of 3 kV DC traction power system based on distribution sources, as an alternative to traditional traction substation. The system consists of supplying modules (SM) installed along the electrified railway line, the distance between adjacent SMs are much shorter, than between traditional traction substations in 3 kV system. Each SM consists of energy storage system (ESS), and could be charged from adjacent, traditional traction substation via catenary, via medium voltage supplying lines, renewable power sources or by energy recuperation. In the article, the main parameters of the proposed supplying system operation have been compared with parameters of the system with traditional traction substation. For this purpose, in a case study, comparison analysis has been carried out for energy losses in catenary, 15-min peak power demand as well as the cost of the system installation. At the end, the reliability analysis has been carried out for proposed distribution power supply system and for traditional one.

3 January 2025 in Preprints.org
Verified
Preprint
Open access
PDF file
Adam SzelągAdam Szeląg
Adam Szeląg
WJWłodzimierz Jefimowski
Włodzimierz Jefimowski
TMTadeusz Maciołek
Tadeusz Maciołek
Anatolii NikitenkoAnatolii Nikitenko
Anatolii Nikitenko
MWMaciej Wieczorek
Maciej Wieczorek
MLMirosław Lewandowski
Mirosław Lewandowski
This paper proposes the sizing optimization method and energy management strategy for stationary hybrid energy storage system dedicated to DC power supply system. The hybrid energy storage consists of two modules – supercapacitor, mainly dedicated to regenerative energy utilization and electrochemical battery, aimed to peak power reduction. It is shown that the parameters of both modules could be sized independently. The supercapacitor module parameters are sized, based on the results of simulation determining the regenerative power, resulting limited catenary receptivity. The simulation model of DC electrification system is validated by comparing the results of simulation with the measurements of 15-min average power in 24-hour cycle as an average values of one year. The battery module is sized based on the statistical data of 15-min substation power values occurrences. The battery energy capacity, its maximum discharge C-rate and the conditions determining its operation are optimized to achieve the maximum ratio of annual income resulting from peak power reduction to annual operating cost resulting from battery aging process and total life cycle. The case study prepared for typical 3 kV DC substation with mixed railway traffic shows that peak power could be reduced by ~ 1 MW, giving ~ 10 years of payback period of battery module installation, while the energy consumption could be decreased by 1.9 MWh/24 h, giving the payback period of supercapacitor module installation ~ 7.5 years. The payback period of the whole energy storage system (ESS) is ~ 8.4 years.