The peer-to-peer (P2P) strategy as a new trading scheme has recently gained attention in local electricity markets. This is a practical framework to enhance the flexibility and reliability of energy hubs, specifically for industrial prosumers dealing with high energy costs. In this paper, a Norwegian industrial site with multi-energy hubs (MEHs) is considered, in which they are equipped with various energy sources, namely wind turbines (WT), photovoltaic (PV) systems, combined heat and power (CHP) units (convex and non-convex types), plug-in electric vehicles (EVs), and load-shifting flexibility. The objective is to evaluate the importance of P2P energy transaction with on-site flexibility resources for the industrial site. Regarding the substantial peak power charge in the case of grid power usage, this study analyzes the effects of P2P energy transaction under uncertain parameters. The uncertainties of electricity price, heat and power demands, and renewable generations (WT and PV) are challenges for industrial MEHs. Thus, a stochastically based optimization approach called downside risk constraint (DRC) is applied for risk assessment under the risk-averse and risk-neutral modes. According to the results, applying the DRC approach increased by 35% the operation cost (risk-averse mode) to achieve a zero-based risk level. However, the conservative behavior of the decision maker secures the system from financial losses despite a growth in the operation cost.
The peak-load management of a distribution network (DN) has gained attention by increasing the electric power consumption on the demand side. By developing smart-grid infrastructures, effective utilization of the DN’s components and proper management of the DN would create a valuable solution for DN operators. Hence, in this paper, a peak-load management framework is proposed in which the real-time rating of the components and voltage-dependent features of the electric loads help the DN operator handle the peak times successfully. In addition to the individual advantages of efficient operation of the DN, more practical results are obtained by combining the conservation voltage reduction (CVR) and dynamic thermal rating (DTR) of the DN’s lines and transformers. Based on the obtained results, compared to the individual implementation of CVR, the cost-saving level is increased significantly during the peak events using the simultaneous utilization of DTR and CVR. Furthermore, a discussion is presented about the current problems of the feeders supplying the voltage-dependent constant-power loads during CVR utilization, which is resolved by the dynamic rating of the DN’s components.
11 October 2022 in Sustainable Energy, Grids and Networks