wei guo

Prof. Dr. wei guo

School of Civil Engineering, Tianjin University, Tianjin 300072, China

Research Focus & Metrics

Academic Career Length

20Years (2007-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications

29 October 2020 in Acta Geotechnica
Verified
Journal Article
Closed access
PDF file
DHDa Ha
Da Ha
GZGang Zheng
Gang Zheng
Hugo A LoaicigaHugo A Loaiciga
Hugo A Loaiciga
wei guowei guo
wei guo
Haizuo zhouHaizuo zhou
Haizuo zhou
JCJinchun Chai
Jinchun Chai

26 October 2022 in Sustainability
Verified
Journal Article
Open access
PDF file
YZYou Zhou
You Zhou
SCShuli Chen
Shuli Chen
wei guowei guo
wei guo
YRYuxiao Ren
Yuxiao Ren
GXGuizhong Xu
Guizhong Xu
A series of studies have confirmed that vacuum preloading can effectively accelerate the consolidation process of soft soil. In recent years, further improvement in the efficiency of this method is still the continuing goal of scholars. This paper reviews the recent improvements in the vacuum preloading techniques as well as their practical applications in China. The advantages and disadvantages of each method are discussed. It is found that replacing or eliminating one or more components of the vacuum preloading system, such as sand-free, membrane-free, horizontal drain, multiple-step, and air booster vacuum preloading methods, achieved similar soil improvement effects to those of the traditional vacuum preloading method. Vacuum preloading combined with other soil improvement methods could improve the soil with the lower average water content and the higher average shear strength.

21 December 2017 in Marine Georesources & Geotechnology
Verified
Journal Article
Closed access
LSLiqiang Sun
Liqiang Sun
YWYandi Wang
Yandi Wang
wei guowei guo
wei guo
SYShuwang Yan
Shuwang Yan
JCJian Chu
Jian Chu
XLXiaoqiang Liu
Xiaoqiang Liu
The super-long and large-diameter steel pipe piles are often adopted for the construction of offshore oil platforms in deep sea. One constructability issue related to driving heavy pipe piles is the pile running. The term pile running refers to the quick penetration of a pile into the seabed as a result of its high self-weight and low resistance from the seabed. The unexpected pile running can cause the steel wire of the hammer to break or even the loss of the hammer. A case study of pile running at an oil platform is introduced in this paper. A simplified theoretical method is proposed to explain the mechanisms of the pile running in this case. A factor of friction degradation is proposed to calculate the dynamic skin friction from the static ultimate skin friction of surrounding soil. The comparisons between the predictions to the case history show that the proposed simplified method can be used to predict the pile running condition.

25 January 2020 in Rock Mechanics and Rock Engineering
Verified
Journal Article
Closed access
PDF file
WNWen NIE
Wen NIE
wei guowei guo
wei guo
SMShuqi Ma
Shuqi Ma
ZZZhiye Zhao
Zhiye Zhao

3 June 2023 in Journal of Engineering Design
Verified
Journal Article
Closed access
HSHui Sun
Hui Sun
SK OngSK Ong
SK Ong
Andrew NeeAndrew Nee
Andrew Nee
wei guowei guo
wei guo