In tunnel smooth blasting, optimizing the water interval charging structure of peripheral holes is of great significance in improving the effect of smooth blasting and reducing the unit consumption of explosives. Addressing the issue of a single traditional evaluation standard, this paper proposes a composite index evaluation method for rock blasting damage in different zones, and the best charging structure is optimized according to the evaluation results. Taking Liyue Road Tunnel Light Smooth Blasting Project in Chongqing as the Research Background, the numeric models were established with ten kinds of charge structures, the charge structures and explosive quantity were optimized according to the evaluation results, and then the field tests were conducted. The results show that when the length of the water medium at the bottom of the hole is 20 cm, the damage range of the retained rock mass can be controlled while ensuring rock fragmentation. If the length of the water medium at the orifice and in the center of the hole is more than 30 cm, it will affect the superposition effect of the blast stress wave, resulting in under-excavation; in the preferred charge structure, the ratio of the length of the upper and lower explosives reaches 1:3, and the ratio of the length of the water medium is 2:2:1, which achieves a better rock-breaking effect in the field test.
The adjustment of delay time in open-pit bench blasting is a research hotspot in vibration control. Its core lies in utilizing the periodic characteristics of vibration waves to achieve the superposition and cancellation of wave peaks and troughs. However, due to the spatiotemporal variability in the propagation of blast-induced vibration waves, the optimal delay time determined for vibration control requirements at a specific protected area (monitoring point) makes it difficult to achieve the misalignment superposition effect simultaneously at multiple monitoring points. To address the challenge of multi-area vibration control in open-pit bench blasting, this paper proposes an adjustment method based on local delay adjustment. First, a spatiotemporal relationship model between blast holes with monitoring points is established to calculate vibration wave arrival times. This enables rapid hole identification during dense wave arrivals at monitoring points, with waveform separation achieved through initiation delay adjustments. Following the Anderson principle, reconstructed single-hole vibrations are superimposed according to the wave arrival sequence to validate control efficacy. Statistical analysis of concurrent wave arrivals across all-direction monitoring points identifies high-probability vibration hazard locations. Targeted delay adjustments for blast holes within clustering arrival periods at these locations enable comprehensive vibration reduction. Field data confirm that single-point control reduces peak vibration by >10.55% through simultaneously reducing the amount of waves in clustering arrival periods. Multi-point control resolves seven hazard locations across two directions, attaining 88.57% hazard elimination efficiency and 14.05% peak velocity attenuation. This method achieves vibration control through local delay adjustments while maintaining the fragmentation effect of the original scheme, providing a new approach to solving the challenge of vibration control in large-scale blasting areas.