Dejan Marinković

Dejan Marinković


Research Focus & Metrics

Academic Career Length

5Years (2022-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
11 November 2022 in Sustainability
Verified
Journal Article
Open access
PDF file
MIMarija Zoran Ivanovic
Marija Zoran Ivanovic
ĐNĐorđe Nedeljković
Đorđe Nedeljković
ZSZoran Stojadinovic
Zoran Stojadinovic
DMDejan Marinković
Dejan Marinković
NINenad Ivanišević
Nenad Ivanišević
NSNevena Simić
Nevena Simić
Due to numerous reasons, construction projects often fail to achieve the planned duration. Detecting causes of delays (CoD) is the first step in eliminating or mitigating potential delays in future projects. The goal of research is unbiased CoD detection at a single project level, with the ultimate goal to discover the root causes of delay. The existing approach is based on expert knowledge which is used to create CoD lists for projects in general or groups of similar projects. When applied to a single project, it is burdened with bias, as shown on a case project returning low Spearman Rank correlation values. This research introduces a Delay Root causes Extraction and Analysis Model—DREAM. The proposed model combines expert knowledge, machine learning techniques, and Minutes of Meetings (MoM) as an unutilized extensive source of information. In the first phase, DREAM outputs a CoD list based on occurring frequency in MoM with satisfactory recall values, significantly reducing expert-induced subjectivism. In the second phase, enabled by MoM dates, DREAM adds another dimension to delay analysis—temporal CoD distribution. By analyzing corresponding informative charts, experts can understand the nature of delays and discover the root CoD, allowing intelligent decision making on future projects.

1 January 2024 in Journal of Applied Engineering Science
Verified
Journal Article
Open access
PDF file
DMDejan Marinković
Dejan Marinković
MIMarija Ivanović
Marija Ivanović
NSNevena Simić
Nevena Simić
NKNikola Knežević
Nikola Knežević
The successful implementation of construction projects necessitates the establishment of an efficient system for project execution planning and control, with parameters that ensure an effective assessment of the construction work status, timely detection of variance causes, and reliable trend analysis. In this regard, a set of parameters has been developed, among which the actual progress of works on a project holds a significant place. Existing approaches to progress measurement is mostly focused on studying methods for calculating the percentage of completed works and their applicability to specific types of works and organizational levels. However, key issues persist, such as delayed identification of variance causes and inadequate method sensitivity to initial variances when damages are still minor, and potential effects of corrective measures are greatest. Therefore, this paper proposes a framework for progress measurement based on integrated monitoring of prerequisites for tasks and work performances. While progress monitoring at the project level is organized within workflows, monitoring within each workflow is provided for sub-workflows related to ensuring prerequisites, material procurement, and construction work execution. Visualization of sub-workflows is facilitated through planned and actual cumulative curves of completed works in percentage, whose interrelationships promptly indicate potential project issues. The application of the proposed framework ensures better synchronization of construction works, improved control of prerequisites, rapid detection of causes, along with efficient variance management. The framework includes a clear division of responsibilities for implementing sub-workflows, where site management and specialized services of a company are responsible for ensuring prerequisites and material procurement, while production forces of a company primarily handle the execution of construction works. Such an approach allows for direct determination of issues or quick and efficient delineation of responsibilities, which represents a common issue in practice. This contributes to the motivation of employees and enhances the performance of the project management team.