Jiqing Zhu

Dr. Jiqing Zhu

Swedish National Road and Transport Research Institute (VTI), SE-581 95 Linköping, Sweden
orcid

Research Focus & Metrics

Academic Career Length

9Years (2018-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
7 February 2020 in International Journal of Pavement Engineering
Verified
Journal Article
Open access
HWHaopeng Wang
Haopeng Wang
PAPanos Apostolidis
Panos Apostolidis
Jiqing ZhuJiqing Zhu
Jiqing Zhu
XLXueyan Liu
Xueyan Liu
ASAthanasios Skarpas
Athanasios Skarpas
SESandra Erkens
Sandra Erkens
Waste tire rubber has been incorporated into asphalt modification for decades due to its various benefits. There are two main mechanisms during bitumen–rubber interaction: rubber swelling and chemical degradation. This study surveys these two processes from the viewpoint of polymer science. The kinetics of rubber dissolution and thermodynamics of rubber swelling are discussed to provide a fundamental understanding of the interaction process and to demonstrate how optimisation of material selection and processing procedures can lead to the desired binder properties. Factors including the interaction conditions and raw material characteristics are analysed based on the previous theories and compared with experimental results.

28 July 2019 in Road Materials and Pavement Design
Verified
Journal Article
Open access
Jiqing ZhuJiqing Zhu
Jiqing Zhu
RBRomain Balieu
Romain Balieu
HWHaopeng Wang
Haopeng Wang

3 April 2025 in Road Materials and Pavement Design
Verified
Journal Article
Open access
FZFan Zhang
Fan Zhang
Jiqing ZhuJiqing Zhu
Jiqing Zhu
YSYuxuan Sun
Yuxuan Sun
CBChristy Mariam Benny
Christy Mariam Benny
Di WangDi Wang
Di Wang
AFAugusto Cannone Falchetto
Augusto Cannone Falchetto

21 February 2023 in Road Materials and Pavement Design
Verified
Journal Article
Open access
Di WangDi Wang
Di Wang
Jiqing ZhuJiqing Zhu
Jiqing Zhu
LPLaurent Porot
Laurent Porot
Augusto Cannone FalchettoAugusto Cannone Falchetto
Augusto Cannone Falchetto
SDSjaak Damen
Sjaak Damen
The Multiple Stress Creep and Recovery test is recognised to better characterise the high-temperature property of bituminous binders than the traditional methods, especially for polymer modified bitumen (PmB). However, some experimental parameters may affect the test results, such as the preloading, measurement location, stress level. In this study, the effects of these parameters were evaluated through an interlaboratory experiment. Four bituminous binders were short-term aged and analysed by five different laboratories. The variability in most results met the requirements of the European standard, while some failed to pass the American precision criteria. The preloading at 0.1 kPa with ten cycles was found to have a recordable impact on PmB samples, but a less significant effect was observed for the unmodified ones. With the measurement locations, the influence is limited compared to other parameters. As for stress sensitivity, higher stresses lead to remarkable differences.

14 November 2022 in Journal of Testing and Evaluation
Verified
Journal Article
Closed access
LPLaurent Porot
Laurent Porot
Jiqing ZhuJiqing Zhu
Jiqing Zhu
Di WangDi Wang
Di Wang
Augusto Cannone FalchettoAugusto Cannone Falchetto
Augusto Cannone Falchetto
The constant demand for high-performing and more reliable roads has led to an increasing use of complex bituminous binders such as polymer-modified bituminous binders, which has become a widespread practice for asphalt pavement. As a result, specification and testing have evolved to better distinguish between quality materials. In recent years, more focus has been devoted to better evaluating the rutting resistance of bituminous binders. The multiple stress creep recovery (MSCR) test has gained popularity over the last decade, especially for polymer-modified binders, bringing more advantages in discriminating amongst quality binders such as polymer-modified bitumen. Within the International Union of Laboratories and Experts in Construction Materials, Systems and Structures technical committee 272, Phase and Interphase of Behavior of Innovative bituminous Materials, and its TG1 task group, several binders were thoroughly evaluated, including two non-modified and two polymer-modified bituminous binders, under various testing conditions to address the high-temperature behavior. Five laboratories performed MSCR on short-term aged binders after performing the rolling thin film oven test, in the same temperature conditions for all binders. Despite the limited data set, the variability between laboratories was reasonable. The MSCR results were compared with softening point temperature, high-temperature performance grade criteria, |G*| / sinδ, and equi-modulus temperature. MSCR was able to distinguish between complex binders better as compared with conventional parameters. It generates multiple useful parameters, amongst which percent recovery and non-recoverable creep compliance are the most relevant. This paper presents the analysis of MSCR results and comparison with other test methods.

26 March 2021 in Road Materials and Pavement Design
Verified
Journal Article
Open access
Jiqing ZhuJiqing Zhu
Jiqing Zhu
XLXiaohu Lu
Xiaohu Lu
MLMichael Langfjell
Michael Langfjell
AGAnders Gudmarsson
Anders Gudmarsson
This paper employs the linear viscoelastic parameter G′/tanδ as the quantitative criterion for identifying a common relationship with the Ring and Ball softening point of both unmodified and polymer-modified bitumen (PMB). Temperature sweep was conducted at 10 rad/s with dynamic shear rheometer to determine the complex shear modulus G* and phase angle δ of bitumen. The parameter G′/tanδ could be obtained. Logarithmic interpolation was applied for G′/tanδ to determine the equivalent softening temperature Ts_G′/tanδ at which G′/tanδ equals the proposed criterion values. With this method, a good agreement could be reached between Ts_G′/tanδ and the softening point for both unmodified bitumen and PMB. While keeping high accuracy for unmodified bitumen, the accuracy of Ts_G′/tanδ as an estimation of the softening point of PMB was largely improved when compared to the iso-modulus approach. The reliability of this quantitative relationship is preliminarily verified and its implementation is discussed in the Black space.