10 April 2023 in Buildings
Verified
Journal Article
Open access
PDF file
IAIvan Abramov
Ivan Abramov
ZAZaid Alzaidi
Zaid Alzaidi
Construction production in Russia and abroad (in Iraq) is facing various negative factors. The emergence of diverse factors in the implementation of investment and construction projects has an effect on the making of important decisions by the heads of construction enterprises, which may in the future be the cause of uncertainty and, as a result, the emergence of critical risks. The purpose of the study is to develop a methodology for identifying and assessing the influence of risk factors on the activities of construction enterprises in the implementation of investment projects. For the purposes of the study, mathematical and statistical models were used, such as the hierarchical analysis method and Monte Carlo, as well as the expert survey. The result of the study shows that the use of those models will significantly increase the success of construction enterprises by identifying various risk factors at the stage of construction and assessing their impact on these projects. The scientific and methodological approaches developed as a result of the study, methods for assessing risk factors, and appropriate compensatory measures to reduce or prevent the influence of these factors will significantly improve the organization of production activities of construction enterprises and will contribute to their successful development.

8 September 2023 in Buildings
Verified
Journal Article
Open access
PDF file
ALAzariy Lapidus
Azariy Lapidus
IAIvan Abramov
Ivan Abramov
TKTatyana Konstantinovna Kuzmina
Tatyana Konstantinovna Kuzmina
AAAnastasiia Abramova
Anastasiia Abramova
ZAZaid Alzaidi
Zaid Alzaidi
The risk factors that arise during the implementation of investment and construction projects differ in nature, degree of influence, and other characteristics. Ignoring these factors and measures to manage them often leads to critical consequences in the form of disruptions in the timing of work. The article discusses the risk factors arising at the construction stage, their classification, as well as the measures and strategies necessary to manage these factors. A methodology has been developed that includes conducting a survey in the form of a questionnaire in order to collect information about risk factors that affect the implementation of investment and construction projects. The fuzzy TOPSIS technique was used to compare the sustainable functioning of three construction companies (alternatives) on the basis of its application of measures and strategies necessary to deal with risk factors (criteria). Experts with experience in the construction sector were involved in the survey. The results showed that financial, technical, legal, economic, managerial, and natural factors have the greatest impact on investment and construction projects. It is recommended to pay special attention to the listed factors when developing measures aimed at preventing risks and their consequences. The methodology described in the study can be used by construction companies in strategic planning. The analysis of the stability of construction companies, depending on their use of various ways to counteract risk factors, allowed us to develop a number of practical recommendations to reduce the impact of the studied factors on achieving the goals of investment and construction projects.

26 October 2023 in Buildings
Verified
Journal Article
Open access
PDF file
ALAzariy Lapidus
Azariy Lapidus
IAIvan Abramov
Ivan Abramov
TKTatyana Konstantinovna Kuzmina
Tatyana Konstantinovna Kuzmina
AAAnastasiia Abramova
Anastasiia Abramova
ZAZaid Alzaidi
Zaid Alzaidi
Failure to meet the deadlines for the implementation of investment-construction projects is a problem in all countries of the world and leads to unstable activity of construction companies. This article studies the most important destabilizing factors affecting the main indicator of sustainable activity of construction companies, i.e., the duration of the implementation of an investment-construction projects. To determine and assess the impact of destabilizing factors on the duration of implementation of selected investment-construction projects, a survey was conducted in which a number of customers, consultants, and contractors involved in construction projects took part. Questionnaires developed on the basis of a cluster sample were sent to respondents, and 84 responses were received in response to the assessment of destabilizing factors. To analyze the received and grouped information, structural equation modeling using the Smart-PLS program was used. As a result of modeling, a number of results were obtained, the most important of which was the identification of the main reasons that lead to an average (20–50%) increase in the duration of projects in the construction sector. The most significant was the lack of an appropriate procurement program for materials; inefficient scheduling by contractors and instability of construction production, poor-quality processing of incoming information, and untimely decision-making due to changes in projects during their implementation. Destabilizing factors contribute to an increase in the duration of construction sector projects, which leads to time overruns, cost overruns, and an increase in the negative impact on the overall use of resources. As a result of the study, a set of recommendations was formed, the most important of which is the use of possible compensatory measures that can allow construction companies to eliminate the risks of disrupting construction deadlines for sustainable activities. These compensatory measures include: 1. recommendations to customers of the construction project, 2. recommendations to contractors, and 3. recommendations to the consultant. Moreover, the control of destabilizing factors that can cause delays, the improvement of contracts, and the precise and clearer definition of all elements of the project can help to reduce the duration of construction, and will allow companies to maintain sustainable activities in the construction industry.

28 July 2023 in Preprints.org
Verified
Preprint
Open access
PDF file
ALAzariy Lapidus
Azariy Lapidus
IAIvan Abramov
Ivan Abramov
TKTatyana Konstantinovna Kuzmina
Tatyana Konstantinovna Kuzmina
AAAnastasia Igorevna Abramova
Anastasia Igorevna Abramova
ZAZaid Alzaidi
Zaid Alzaidi
Sustainability is a characteristic manifested in the ability to maintain the necessary level of performance for construction companies when risk factors arise during the implementation of investment and construction projects. The risk factors that arise during the implementation of in-vestment and construction projects differ in nature, degree of influence, and other characteristics. Ignoring these factors and measures to manage them often leads to critical consequences in the form of disruptions in the timing of work. Risk is a combination of the probability and consequences of the occurrence of adverse events. The article considers the concept of risk as a potential possibility of occurrence of adverse situations and related consequences when exposed to these factors. Risk factors are characterized by surprise, discreteness of changes, the presence of threshold values, upon reaching which a transition to a different mode of operation is required. The article discusses the risk factors arising at the construction stage, their classification. A methodology has been developed that includes conducting a survey in the form of a questionnaire in order to collect information about risk factors that affect the implementation of investment and construction projects. Experts with experience in the construction sector were involved in the survey. The processing of the survey results made it possible to assess the significance of various risk factors in investment and construction projects. Thus, statistical and expert methods were used in the study. The results showed that financial, technical, legal, economic, managerial and natural factors have the greatest impact on investment and construction projects. It is recommended to pay special attention to the listed factors when developing measures aimed at preventing risks and their consequences. The methodology described in the study can be used by construction companies in strategic planning. The analysis of the stability of construction companies, depending on their use of various ways to counteract risk factors, allowed us to develop a number of practical recommendations to reduce the impact of the studied factors on achieving the goals of investment and construction projects.

14 September 2023 in Preprints.org
Verified
Preprint
Open access
PDF file
ALAzariy Lapidus
Azariy Lapidus
IAIvan Abramov
Ivan Abramov
TKTatyana Konstantinovna Kuzmina
Tatyana Konstantinovna Kuzmina
AAAnastasiia Abramova
Anastasiia Abramova
ZAZaid Alzaidi
Zaid Alzaidi
Failure to meet the deadlines for the implementation of investment and construction projects is a problem in all countries of the world, and leads to unstable activity of construction companies. The article studies the most important destabilizing factors affecting the main indicator of sustainable activity of construction companies-the duration of the implementation of an investment and construction projects. To determine and assess the impact of destabilizing factors on the duration of implementation of selected investment and construction projects, a survey was conducted, in which a number of customers, consultants and contractors involved in construction projects took part. Questionnaires developed on the basis of a cluster sample were sent to respondents, 48 responses were received in response to the assessment of destabilizing factors. To analyze the received and grouped information, structural equation modeling using the Smart-PLS program was used. As a result of modeling, a number of results were obtained, the most important of which are the identification of the main reasons that lead to an average (20% - 50%) increase in the duration of projects in the construction sector. The most significant were: the lack of an appropriate procurement program for materials; inefficient scheduling by contractors and instability of construction production; poor-quality processing of incoming information and untimely deci-sion-making due to changes in projects during their implementation. Destabilizing factors con-tribute to an increase in the duration of construction sector projects, which leads to time overruns, cost overruns, and an increase in the negative impact on the overall use of resources. As a result of the study, a set of recommendations was formed, the most important of which is the use of possible compensatory measures that can allow construction companies to eliminate the risks of disrupting construction deadlines for sustainable activities. These compensatory measures include: - recommendations to customers of the construction project; - recommendations to contractors; - recommendations to the consultant. Moreover, the control of destabilizing factors that can cause delays, the improvement of contracts and the precise and clearer definition of all elements of the project can help to reduce the duration of construction, and will allow companies to maintain sustainable activities in the construction industry.

20 July 2026 in Fibers
Verified
Journal Article
Open access
PDF file
AHAhid Hamoodi
Ahid Hamoodi
ZAZaid Alzaidi
Zaid Alzaidi
MZMustafa Shareef Zewair
Mustafa Shareef Zewair
MMMalik S. Malik
Malik S. Malik
An experimental study was conducted to investigate the flexural behavior of continuous beams strengthened with precast concrete plates. Ten rectangular concrete beams with a cross-section of 210 × 150 mm and a total length of 2400 mm were tested under four-point loads. One specimen, without any strengthening, acted as the control, while the remaining nine were strengthened at both the positive and negative moment zones. The variables in this study were: strengthening plate thickness, length, type of bonding (epoxy or mechanical connector), bonding method (surface bonding or 10 mm grooving), type of concrete used (UHPC, SFRC, or SIFCON), and finally, the steel fiber ratio. The failure mode, cracking modes, ultimate load, load–deflection curve, stiffness and ductility were analyzed. The results showed the effectiveness of the strengthening methods, as they improved the flexural strength of the beams by 15.7% to 53%, as well as their stiffness by 15% to 173.8%, and reduced crack propagation. Also, decreasing the thickness and length of plates reduced the flexural strength by 7.28% and 23.5%, respectively. When the bonding methods were compared, the beam with mechanical bonding showed 5.7% more flexural strength than the one using epoxy. However, it was noted that all cracks in the strengthening plates were located at the bolt positions. Additionally, the use of SIFCON plates enhanced flexural strength more than UHPC and SFRC plates. However, for the SFRC plate, increasing the steel fiber content from 1.5% to 2% improved the strength by 1.2%, but this high percentage also caused cracking in the SFRC plate due to the inhomogeneity of the concrete mixture. As for the initial stiffness, the sample in which epoxy was used showed the highest value, with an increase of 173.8%, due to the uniform bonding at the connection surface. Finally, it was observed that the reference beam had the highest ductility due to the high ultimate displacement resulting from the numerous cracks that occurred in the beam, which were reduced in the strengthened beams.