Fernando A. Assis

Dr. Fernando A. Assis

orcid

Research Focus & Metrics

Academic Career Length

13Years (2014-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
11 June 2022 in International Journal of Electrical Power & Energy Systems
Verified
Journal Article
Closed access
FCFabrício S.V. Campos
Fabrício S.V. Campos
FAFernando A. Assis
Fernando A. Assis
ASArmando M. Leite da Silva
Armando M. Leite da Silva
ACAlex J.C. Coelho
Alex J.C. Coelho
RMRodolfo A.R. Moura
Rodolfo A.R. Moura
Marco Aurélio Oliveira SchroederMarco Aurélio Oliveira Schroeder
Marco Aurélio Oliveira Schroeder

21 March 2023 in Energies
Verified
Journal Article
Open access
PDF file
JCJose Filho Costa Castro
Jose Filho Costa Castro
RRRonaldo Roncolatto
Ronaldo Roncolatto
ADAntonio R. Donadon
Antonio R. Donadon
VAVittoria E. M. S. Andrade
Vittoria E. M. S. Andrade
PRpedro andre carvalho Rosas
pedro andre carvalho Rosas
RCRafael Kotchetkoff Carneiro
Rafael Kotchetkoff Carneiro
One of the challenges faced by Brazilian distribution utilities to enable the connection and operation of microgrids (MGs) is the absence of a solid set of technical standards in the country. An alternative has been to use and adapt existing standards applied to micro- and mini-distributed generation. In this context, this paper presents an analysis of the development status of norms, standards, and general requirements for the connection and operation of microgrids, as well as a proposal for the regulation and structuring of technical and operational requirements related to the implementation of microgrid projects. Some critical points highlighted in the paper include: the modes of operation, the minimum requirements for the different modes of operation, interoperability of systems, a conceptual model with attribution of responsible actors for the decentralized management of microgrids adapted to the institutional standards of the Brazilian sectorial model, a proposal for a standard connection structure considering the point of connection (PoC) implanted using multifunctional relay and recloser, procedures for technical feasibility assessment (operational studies) of MGs connection, and, finally, a discussion of operational issues of storage systems in a microgrid environment.

20 September 2021 in International Transactions on Electrical Energy Systems
Verified
Journal Article
Closed access
PDF file
FAFernando A. Assis
Fernando A. Assis
ACAlex J. C. Coelho
Alex J. C. Coelho
LRLucas D. Rezende
Lucas D. Rezende
ASArmando M. Leite da Silva
Armando M. Leite da Silva
LRLeonidas C. Resende
Leonidas C. Resende

21 November 2024 in Utilities Policy
Verified
Journal Article
Open access
FCFrancisco C.R. Coelho
Francisco C.R. Coelho
FAFernando A. Assis
Fernando A. Assis
JCJosé Filho C. Castro
José Filho C. Castro
ADAntonio R. Donadon
Antonio R. Donadon
RRRonaldo A. Roncolatto
Ronaldo A. Roncolatto
LSLuiz C.P. Silva
Luiz C.P. Silva

30 September 2020 in International Transactions on Electrical Energy Systems
Verified
Journal Article
Closed access
PDF file
FAFernando A. Assis
Fernando A. Assis
ASArmando M. Leite da Silva
Armando M. Leite da Silva
LMLuiz A. F. Manso
Luiz A. F. Manso
JCJosé F. C. Castro
José F. C. Castro

5 December 2022 in IEEE Transactions on Power Delivery
Verified
Journal Article
Closed access
ACAlex J. C. Coelho
Alex J. C. Coelho
Rodolfo Antônio Ribeiro de MouraRodolfo Antônio Ribeiro de Moura
Rodolfo Antônio Ribeiro de Moura
FAFernando A. Assis
Fernando A. Assis
Marco Aurélio Oliveira SchroederMarco Aurélio Oliveira Schroeder
Marco Aurélio Oliveira Schroeder
XYXinyi Yuan
Xinyi Yuan
AHAli Hooshyar
Ali Hooshyar
The Monte Carlo method (MCM) is the most widely used statistical approach to evaluate the lightning performance (LP) of overhead transmission lines (OTLs). However, the MCM has a very high computational burden, making LP studies time consuming. To overcome this difficulty, this letter proposes a new alternative approach for calculating the the lightning overvoltages (LOs) using the unscented transform method (UTM). This letter compares the UTM and MCM for calculating LO in insulator strings of OTLs through extensive tests carried out using the Alternative Transients Program (ATP). Such LO evaluation is an essential requirement for LP evaluation of a transmission line. The results indicate that the UTM significantly reduces the processing time to generate LOs while its accuracy is similar to that of the MCM.