A hybrid girder bridge adopts a steel segment at the mid-span of the main span of a continuous concrete girder bridge. The critical point of the hybrid solution is the transition zone, connecting the steel and concrete segments of the beam. Although many girder tests revealing the structural behavior of hybrid girders have been conducted by previous studies, few specimens took the full section of a steel–concrete joint due to the large size of prototype hybrid bridges. In this study, a static load test on a composite segment to bridge the joint between the concrete and steel parts of a hybrid bridge with full section was conducted. A finite element model replicating the tested specimen results was established through Abaqus, while parametric studies were also conducted. The test and numerical results revealed that the concrete filling in the composite solution prevented the steel flange from extensive buckling, which significantly improved the load-carrying capacity of the steel–concrete joint. Meanwhile, strengthening the interaction between the steel and concrete helps to prevent the interlayer slip and simultaneously contributes to a higher flexural stiffness. These results are an important basis for establishing a rational design scheme for the steel–concrete joint of hybrid girder bridges.
10 October 2023 in Structure and Infrastructure Engineering
In the hogging moment regions of steel–concrete composite continuous girder bridges, a detrimental condition appears such that concrete slab bears tensile stress and the steel girder bears compressive stress. Decreasing the shear connection in the hogging moment regions helps to improve the mechanical performance for steel–concrete continuous composite girder bridges. In this paper, analytical models for the calculation of composite girders considering partial shear connection (PSC) action are discussed. A project case of Qiwu Bridge in Jiangxi Province using partial shear connection action is introduced. A nonlinear finite element model of Qiwu Bridge is established through ABAQUS® to simulate and predict the mechanical properties and structural performance. Based on the finite element method results, the influence of PSC on various parameters is analysed by performing a parametric analysis. Numerical results show that arranging a partial shear connection region can effectively reduce the crack region and disperse areas having high stress concentration, but shear stiffness mutation can significantly increase the stress level at the edge of the partial shear connection region.
In order to reveal the mechanism of sleeved stud connectors, 15 push-out specimens were designed, and static loading tests were conducted to evaluate the mechanical performance. The shear performance differences between the novel sleeved studs and conventional welded studs were compared. Referring to the experimental results, an Abaqus nonlinear finite element model was established to study the shear mechanism of sleeved stud connectors. Parametric analysis was conducted to investigate the effects of stud height, sleeve filling material, and sleeve diameter on the mechanical performance of the connectors. The experimental and finite element analysis results indicated that the ultimate shear bearing capacity and shear stiffness of the sleeved stud connectors were higher than those of ordinary welded studs, and the maximum slip was relatively small. Compared to conventional welded studs, the ultimate bearing capacity of sleeved studs increased by 4% to 8%, and the shear stiffness increased by 25% to 35%. Since the shear behavior of sleeved studs mainly occurred at the base of the studs, the influence of stud height on shear performance was relatively small. However, sleeve and stud diameter have a great influence on bearing capacity and stiffness. As the Ultra-High Performance Concrete (UHPC) near the base of the stud effectively enhanced the shear carrying capacity of the sleeved stud connectors, the shear carrying capacity and shear stiffness increased with the increase in the sleeve diameter.