TOMMASO PATTON

Dr. TOMMASO PATTON

orcid

Research Focus & Metrics

Academic Career Length

9Years (2018-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
28 December 2018 in AIP Conference Proceedings
Verified
Conference Paper
Closed access
PDF file
TPTOMMASO PATTON
TOMMASO PATTON
NPN. Pilan
N. Pilan
PBP. Bettini
P. Bettini
GCGiuseppe Chitarin
Giuseppe Chitarin
ALA. De Lorenzi
A. De Lorenzi
LTL. Trevisan
L. Trevisan
The high-Q operation of the ITER tokamak will require two Neutral Beam Injectors (NBIs) for plasma heating and current drive. Each beam will be generated by a 40 A current of Deuterium negative ions, accelerated up to the specific energy of 1 MeV and then neutralized. The power delivered to the plasma by each NBI shall reach 16 MW with a duration up to 1 h. The beam source will be constituted by an RF-driven negative ion source at –1 MV potential, by a Multi-Aperture, Multi-Grid (MAMuG) electrostatic accelerator (consisting of 5 stages at intermediate potentials), and a gas-box neutralizer at ground potential. All components will be installed in a vacuum vessel (also at ground potential), together with a high-capacity cryo-pumping system which controls of the background gas pressure. In order to validate the ITER NBI design and address all the outstanding issues related to these demanding requirements, a full scale prototype called MITICA (Megavolt ITER Injector & Concept Advancement), is under construction in Padova at Consorzio RFX. Voltage insulation in vacuum and/or very low-pressure gas on a single gap is indeed one of the expected issues which MITICA will have to deal with. In this paper, a numerical tool, called Voltage Holding Prediction Model (VHPM) and based on the clumps theory in vacuum, is applied to the MITICA beam source for evaluating and optimizing the high voltage insulation of the experiment. The tool parameters have been recently “calibrated” based on the (few) experimental results presently available in the case of large gaps. Since the initial results suggest that the breakdown probability will be rather high when the beam source will operate at nominal voltage (-1MV), preemptive solutions for increasing the voltage holding capability in the gaps between the beam source, the accelerator grids and the vacuum vessel have been considered ad compared. A very effective solution for increasing the voltage holding capability of the system consists in the use of an intermediate electrostatic shield between the source and the vessel. Using the above-mentioned numerical tool, a conceptual design of such intermediate electrostatic shield has been developed and optimized, taking into account also mechanical constraints, and the effects of the presence of the shield on the background gas pressure distribution. Finally also an experimental program for anticipating the full-scale voltage holding tests is studied and proposed, using the real MITICA vacuum vessel (on-site) together with a beam source mock-up (with a simple geometry) without and with an intermediate electrostatic shield, in order to get a first voltage holding characterization of the vacuum vessel, to evaluate the effect of the shield, and to benchmark the VHPM for large gaps.

23 September 2024 in Sensors
Verified
Journal Article
Open access
PDF file
GMGabriele Manduchi
Gabriele Manduchi
AGAndrea Rigoni Garola
Andrea Rigoni Garola
LTLuca Trevisan
Luca Trevisan
TPTOMMASO PATTON
TOMMASO PATTON
Proper timing synchronization is important when data from sensors are acquired by different devices. This paper proposes a simple but effective solution for System on Chip (SoC) architectures that integrates a general-purpose Field Programmable Gate Array (FPGA) with a CPU. The proposed approach relies on a network synchronization protocol implemented in software, such as Network Time Protocol (NTP) or Precision Time Protocol (PTP), and uses the FPGA to generate a clock reference that is maintained in step with the synchronized system clock. The clock generated by the FPGA is obtained from the FPGA oscillator via appropriate fractional clock division. Clock drift is avoided via a software program that periodically compares the FPGA and the system counters, respectively, and adjusts the fractional clock divider in order to slightly adjust the FPGA clock frequency using a Proportional Integral controller. A specific implementation is presented on the RedPitaya platform, generating a 1 MHz clock in step with the NTP synchronized system clock. The presented system has been used in a distributed data acquisition system for fast transient recording in the neutral beam test facility for the ITER nuclear fusion experiment.

1 March 2024 in Sensors
Verified
Journal Article
Open access
PDF file
GMGabriele Manduchi
Gabriele Manduchi
AGAndrea Rigoni Garola
Andrea Rigoni Garola
LTLuca Trevisan
Luca Trevisan
TPTOMMASO PATTON
TOMMASO PATTON
Event-driven data acquisition is used to capture information from fast transient phenomena typically requiring a high sampling speed. This is an important requirement in the ITER Neutral Beam Test Facility for the development of one of the heating systems of the ITER nuclear fusion experiment. The Red Pitaya board has been chosen for this project because of its versatility and low cost. Versatility is provided by the hosted Zynq System on Chip (SoC), which allows full configuration of the module architecture and the OpenSource architecture of Red Pitaya. Price is an important factor, because the boards are installed in a hostile environment where devices can be damaged by EMI and radiation. A flexible solution for event-driven data acquisition has been developed in the Zynq SoC and interfaced to the Linux-based embedded ARM processor. It has been successfully adopted in a variety of data acquisition applications in the test facility.

23 July 2025 in Fusion Engineering and Design
Verified
Journal Article
Closed access
TPTOMMASO PATTON
TOMMASO PATTON
GCG. Chitarin
G. Chitarin
NPN. Pilan
N. Pilan
MAM. Agostini
M. Agostini
DAD. Aprile
D. Aprile
MKM. Kashiwagi
M. Kashiwagi

7 July 2023 in Sensors
Verified
Journal Article
Open access
PDF file
TPTOMMASO PATTON
TOMMASO PATTON
ASAlastair Shepherd
Alastair Shepherd
BDBasile Pouradier Duteil
Basile Pouradier Duteil
AGAndrea Rigoni Garola
Andrea Rigoni Garola
MBMatteo Brombin
Matteo Brombin
FRFederico Rossetto
Federico Rossetto
Stable and uniform beams with low divergence are required in particle accelerators; therefore, beyond the accelerated current, measuring the beam current spatial uniformity and stability over time is necessary to assess the beam performance, since these parameters affect the perveance and thus the beam optics. For high-power beams operating with long pulses, it is convenient to directly measure these current parameters with a non-intercepting system due to the heat management requirement. Such a system needs to be capable of operating in a vacuum in the presence of strong electromagnetic fields and overvoltages, due to electrical breakdowns in the accelerator. Finally, the measure of the beam current needs to be efficiently integrated into a pulse file with the other relevant plant parameters to allow the data analyses required for beam optimization. This paper describes the development, design and commissioning of such a non-intercepting system, the so-called beamlet current monitor (BCM), aimed to directly measure the electric current of a particle beam. In particular, the layout of the system was adapted to the SPIDER experiment, the ion source (IS) prototype of the heating neutral beam injectors (HNB) for the ITER fusion reactor. The diagnostic is suitable to provide the electric current of five beamlets from DC up to 10 MHz.

1 October 2024 in Journal of Instrumentation
Verified
Journal Article
Open access
GCGiuseppe Chitarin
Giuseppe Chitarin
TPTOMMASO PATTON
TOMMASO PATTON
NPNicola Pilan
Nicola Pilan
ESE. Sartori
E. Sartori
The electrical insulation of the MITICA Beam Source at 1 MV is a challenging issue, which has not been fully addressed so far on the basis of experimental results and of theoretical models available in literature. Being MITICA the full-size prototype of the Heating Neutral Beam Injector for the ITER fusion experiment, its electrical insulation is constituted just by vacuum gaps and alumina insulators, since other insulating materials such as SF6 gas or fibreglass-reinforced plastic (FRP) would be quickly degraded by the expected neutron flux produced by fusion reaction. Extrapolations based on HV tests on reduced-scale models have recently indicated the risk of electrical breakdowns in the vacuum gap between electrodes nominally operating at -1 MV and the vacuum vessel (at ground potential). The risk of electrical breakdown can be mitigated by introducing an intermediate Electrostatic Shield (ES), which essentially is an equipotential (metallic) enclosure surrounding the HV electrode, so as to divide the vacuum gap in two independent insulating gaps of 400 kV and 600 kV respectively. However, for optimal negative ion production, the ion source shall operate in H2 or D2 at a pressure of ∼ 0.3 Pa and unavoidably produces a flow of gas leaking out in the surrounding vacuum. Thus, the presence of an intermediate shield can substantially increase the background gas pressure in the vacuum gaps, and, due to the large gap length (0.6 m), exacerbate the risk of breakdown when the pressure approaches the conditions of Paschen-type discharges. In addition to this, RF-induced breakdowns were found on the rear side of the ion source during the operation of the prototype source SPIDER, which were somewhat correlated to a relatively high hydrogen pressure in that area. For these reasons, a structure capable of constituting a full equipotential barrier all around the BS and, at the same time, having sufficient gas conductivity (breathability) to allow efficient pumping of background gas, has been designed. In the first part of the paper, the requirements and design optimization of a breathable module of the intermediate ES are described. Then, an experimental campaign for the validation of the electrode implementation the test configurations and the experimental procedure is discussed.