xiaomin fan

Mr. xiaomin fan

orcid

Research Focus & Metrics

Academic Career Length

18Years (2009-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 March 2009 in Journal of Sandwich Structures & Materials
Verified
Journal Article
Closed access
PDF file
XFxiaomin fan
xiaomin fan
IVI. Verpoest
I. Verpoest
JPJ. Pflug
J. Pflug
DVD. Vandepitte
D. Vandepitte
PBP. Bratfisch
P. Bratfisch
A continuous process of thermoplastic honeycomb core, ThermHex, has been patented and is under development at K. U. Leuven. This new concept of thermoplastic honeycomb provides more affordable choices for structural applications than the previous expensive honeycombs thanks to the automated and continuous processing technology. The ThermHex process starts from one continuous thermoplastic sheet and consists of three main processing steps: thermoforming of half-hexagonal webs, folding of webs to honeycomb geometry, and internal fusion bonding. In this article, the polymeric material behavior during the thermoforming step is investigated in detail. First the material is characterized by a series of polymer tests to obtain basic data for the next numerical calculation. Then a 1D viscoelastic model and a 2D finite element (FE) model are used to analyze the polymer behavior during the thermoforming step, to acquire the correct understanding and hence to minimize the effect of the anelastic strain recovery (ASR) during the production. It is found that the material stress relaxation is one of the key features of the final process quality.

28 May 2024 in Applied Sciences
Verified
Journal Article
Open access
PDF file
XFxiaomin fan
xiaomin fan
Zhongsheng TanZhongsheng Tan
Zhongsheng Tan
BZBaojin Zhang
Baojin Zhang
Jinpeng ZhaoJinpeng Zhao
Jinpeng Zhao
YCYuxin Cao
Yuxin Cao
YJYongtao Jiang
Yongtao Jiang
Insufficient investigations have been conducted on the analysis of shield tunneling parameters and the prediction of the tunneling excavation speed in formations composed of volcanic ash strata. To address this issue, we employ a comprehensive approach utilizing literature research, mathematical statistics, and other methodologies, centered on the analysis of the No. 1 Tunnel of the Jakarta–Bandung High-Speed Railway. Our focus is on examining the evolution patterns and inter-relationships of shield tunneling parameters within volcanic ash strata. Subsequently, we propose an optimized strategy for these tunneling parameters. By employing six machine-learning algorithms to construct prediction models, we compare and analyze their performance in predicting the tunneling excavation speed. The results indicate a positive correlation between slurry pressure and tunnel depth in volcanic ash strata, suggesting that the grouting pressure should exceed the slurry pressure by approximately 0.22 MPa. In the composite stratum of “volcanic ash debris + round gravel”, the cutter torque exhibits a strong negative correlation with the total thrust (−0.77). Due to tool wear and ground resistance, the excavation speed and cutter speed are weakly negatively correlated. Compared to other strata, shield tunneling in volcanic ash strata exhibits larger grouting pressure fluctuations, slower tunneling excavation speed, greater total thrust, higher cutter torque, and lower cutter speed. Regarding shield tunneling excavation speed prediction, the ranking of the algorithm performance is RF > DNN > ANN > BPNN > MNR > SVM, with RF achieving a decision coefficient of 0.829. The RF model is well-suited for predicting the shield structure tunneling excavation speed.

11 September 2025 in Applied Sciences
Verified
Journal Article
Open access
PDF file
Zhongsheng TanZhongsheng Tan
Zhongsheng Tan
YLYuanzhuo Li
Yuanzhuo Li
XFxiaomin fan
xiaomin fan
JWJian Wang
Jian Wang
In response to issues of long construction cycles, high pollution, and labor shortages in traditional cast in situ subway station construction, a refined 3D model of a large-segment prefabricated subway station was established using ABAQUS software 2024, with mechanical behavior throughout the construction process studied based on the Shenzhen Huaxia Station project case. The model incorporates a concrete inelastic damage constitutive model and a steel elastic–plastic model, accurately simulates key components, including dry joints of mortise–tenon grooves, prestressed reinforcement, and bolted connections, and implements a seven-phase construction sequence. Research findings indicate the following: (1) During component assembly, the roof vault settlement remains ≤3.8 mm, but backfilling significantly increases displacements (roof settlement reaches 45 mm, middle slab deflection measures 66.91 mm). (2) Longitudinal mortise–tenon joints develop stress concentrations due to stiffness disparities, with mid-column installation slots identified as vulnerable zones exhibiting maximum Von Mises stress of 32 MPa. (3) Mid-column eccentricity induces structural asymmetry, causing increased deflection in longer-span middle slabs, corbel contact stress differentials up to 6 MPa, and bolt tensile stresses exceeding 1.1 GPa. (4) The arched roof effectively transfers loads via three-hinged arch mechanisms, though spandrel horizontal displacement triggers 5 cm rebound in diaphragm wall displacement. Conclusions confirm overall the stability of the prefabricated structure while recommending the optimization of member stiffness matching, avoidance of asymmetric designs, and localized reinforcement for mortise–tenon edges and mid-column joints. Results provide valuable references for analogous projects.

29 October 2023 in Applied Sciences
Verified
Journal Article
Open access
PDF file
LLLei Li
Lei Li
Jinpeng ZhaoJinpeng Zhao
Jinpeng Zhao
XFxiaomin fan
xiaomin fan
The maintenance, reconstruction, and expansion of tunnels often require the removal of existing tunnel linings. However, there is a paucity of research on risk assessments during tunnel lining demolitions. In order to address this gap, we developed a risk assessment model for tunnel lining demolitions using a fuzzy hierarchy comprehensive evaluation and expert surveys. This model draws on on-site construction experience. A fuzzy hierarchy comprehensive evaluation assesses risk probability, while expert questionnaires evaluate risk loss. Our study applied this model to a tunnel project in Qinghai, determining that the overall risk level falls within category “V3”, indicating acceptable risk. Nonetheless, ongoing vigilance and monitoring measures are necessary throughout the construction process. These findings contribute to a deeper understanding of tunnel lining demolition risk assessments for improving project management and safety.

30 July 2025 in Preprints.org
Verified
Preprint
Open access
PDF file
Zhongsheng TanZhongsheng Tan
Zhongsheng Tan
YLYuanzhuo Li
Yuanzhuo Li
XFxiaomin fan
xiaomin fan
JWJian Wang
Jian Wang
In response to issues of long construction cycles, high pollution, and labor shortages in traditional cast-in-situ subway station construction, a refined 3D model of a large-segment prefabricated subway station was established using ABAQUS software, with mechanical behavior throughout the construction process studied based on the Shenzhen Huaxia Station project case. The model considers soil-structure interaction, incorporates a concrete plastic damage constitutive model and a steel elastic-plastic model, accurately simulates key components, including dry joints of mortise-tenon grooves, prestressed reinforcement, and bolted connections, and implements a sev-en-phase construction sequence. Research findings indicate: 1) During component as-sembly, the roof vault settlement remains ≤3.8mm, but backfilling significantly in-creases displacements (roof settlement reaches 45mm, middle slab deflection measures 66.91mm); 2) Longitudinal mortise-tenon joints develop stress concentrations due to stiffness disparities, with mid-column installation slots identified as vulnerable zones exhibiting maximum Von Mises stress of 32MPa; 3) Mid-column eccentricity induces structural asymmetry, causing increased deflection in longer-span middle slabs, corbel contact stress differentials up to 6MPa, and bolt tensile stresses exceeding 1.1GPa; 4) The arched roof effectively transfers loads via three-hinged arch mechanisms, though spandrel horizontal displacement triggers 5cm rebound in diaphragm wall displace-ment. Conclusions confirm overall stability of the prefabricated structure while rec-ommending optimization of member stiffness matching, avoidance of asymmetric de-signs, and localized reinforcement for mortise-tenon edges and mid-column joints. Results provide valuable references for analogous projects.