In response to issues of long construction cycles, high pollution, and labor shortages in traditional cast in situ subway station construction, a refined 3D model of a large-segment prefabricated subway station was established using ABAQUS software 2024, with mechanical behavior throughout the construction process studied based on the Shenzhen Huaxia Station project case. The model incorporates a concrete inelastic damage constitutive model and a steel elastic–plastic model, accurately simulates key components, including dry joints of mortise–tenon grooves, prestressed reinforcement, and bolted connections, and implements a seven-phase construction sequence. Research findings indicate the following: (1) During component assembly, the roof vault settlement remains ≤3.8 mm, but backfilling significantly increases displacements (roof settlement reaches 45 mm, middle slab deflection measures 66.91 mm). (2) Longitudinal mortise–tenon joints develop stress concentrations due to stiffness disparities, with mid-column installation slots identified as vulnerable zones exhibiting maximum Von Mises stress of 32 MPa. (3) Mid-column eccentricity induces structural asymmetry, causing increased deflection in longer-span middle slabs, corbel contact stress differentials up to 6 MPa, and bolt tensile stresses exceeding 1.1 GPa. (4) The arched roof effectively transfers loads via three-hinged arch mechanisms, though spandrel horizontal displacement triggers 5 cm rebound in diaphragm wall displacement. Conclusions confirm overall the stability of the prefabricated structure while recommending the optimization of member stiffness matching, avoidance of asymmetric designs, and localized reinforcement for mortise–tenon edges and mid-column joints. Results provide valuable references for analogous projects.
Water loads on subsea tunnel linings are governed by the combined effects of seepage, structural deformation, and the grouting zone. However, these factors are often treated separately in existing analytical studies. In this study, an analytical model is developed for steady-state saturated seepage around a deep-buried subsea tunnel. The surrounding rock, grouting zone, primary lining, and secondary lining are represented as distinct hydraulic zones, with a constant permeability coefficient assigned to each zone. The analytical results are compared with numerical simulations and show good agreement. Parametric analyses indicate that increasing the grouting-zone thickness or decreasing its permeability reduces the water pressure behind the secondary lining and the lining stress. This effect becomes more pronounced at higher allowable drainage rates but gradually diminishes beyond a certain parameter range. Field monitoring in the Zhujiangkou Tunnel further shows a maximum relative error of 6.89% for the water pressure behind the lining, supporting the applicability of the proposed analytical method.
In response to issues of long construction cycles, high pollution, and labor shortages in traditional cast-in-situ subway station construction, a refined 3D model of a large-segment prefabricated subway station was established using ABAQUS software, with mechanical behavior throughout the construction process studied based on the Shenzhen Huaxia Station project case. The model considers soil-structure interaction, incorporates a concrete plastic damage constitutive model and a steel elastic-plastic model, accurately simulates key components, including dry joints of mortise-tenon grooves, prestressed reinforcement, and bolted connections, and implements a sev-en-phase construction sequence. Research findings indicate: 1) During component as-sembly, the roof vault settlement remains ≤3.8mm, but backfilling significantly in-creases displacements (roof settlement reaches 45mm, middle slab deflection measures 66.91mm); 2) Longitudinal mortise-tenon joints develop stress concentrations due to stiffness disparities, with mid-column installation slots identified as vulnerable zones exhibiting maximum Von Mises stress of 32MPa; 3) Mid-column eccentricity induces structural asymmetry, causing increased deflection in longer-span middle slabs, corbel contact stress differentials up to 6MPa, and bolt tensile stresses exceeding 1.1GPa; 4) The arched roof effectively transfers loads via three-hinged arch mechanisms, though spandrel horizontal displacement triggers 5cm rebound in diaphragm wall displace-ment. Conclusions confirm overall stability of the prefabricated structure while rec-ommending optimization of member stiffness matching, avoidance of asymmetric de-signs, and localized reinforcement for mortise-tenon edges and mid-column joints. Results provide valuable references for analogous projects.
30 September 2026 in Construction and Building Materials