In the context of rising global temperatures, countries around the world are increasingly tailoring their own “carbon neutrality” plans. China has also formulated its “dual-carbon” goals, and the construction industry is gradually transitioning towards prefabrication to reduce carbon emissions. This paper uses the Sha Pu Station of Shenzhen’s Metro Line 12 as a case study by which to explore the effects and mechanisms of the load transfer structure during the assembly process of prefabricated subway stations. A three-dimensional finite element model considering soil–structure interaction was established using MIDAS GTS NX finite element software, 2018 version. The internal forces, stresses, and deformations of the station structure were compared under two scenarios—with and without the load transfer structure—using a control variable method. The research results indicate that the load transfer structure effectively reduces shear forces, bending moments, and stresses in the station structure; limits lateral displacements during the assembly process; and effectively concentrates the maximum stresses during construction at the location of the load transfer structure, thereby preventing stress concentration phenomena and enhancing the overall stability of the station structure. This study elucidates the role and effectiveness of the load transfer structure during the assembly of prefabricated components in subway stations, providing a reference for the construction of similar prefabricated metro stations.
In response to issues of long construction cycles, high pollution, and labor shortages in traditional cast in situ subway station construction, a refined 3D model of a large-segment prefabricated subway station was established using ABAQUS software 2024, with mechanical behavior throughout the construction process studied based on the Shenzhen Huaxia Station project case. The model incorporates a concrete inelastic damage constitutive model and a steel elastic–plastic model, accurately simulates key components, including dry joints of mortise–tenon grooves, prestressed reinforcement, and bolted connections, and implements a seven-phase construction sequence. Research findings indicate the following: (1) During component assembly, the roof vault settlement remains ≤3.8 mm, but backfilling significantly increases displacements (roof settlement reaches 45 mm, middle slab deflection measures 66.91 mm). (2) Longitudinal mortise–tenon joints develop stress concentrations due to stiffness disparities, with mid-column installation slots identified as vulnerable zones exhibiting maximum Von Mises stress of 32 MPa. (3) Mid-column eccentricity induces structural asymmetry, causing increased deflection in longer-span middle slabs, corbel contact stress differentials up to 6 MPa, and bolt tensile stresses exceeding 1.1 GPa. (4) The arched roof effectively transfers loads via three-hinged arch mechanisms, though spandrel horizontal displacement triggers 5 cm rebound in diaphragm wall displacement. Conclusions confirm overall the stability of the prefabricated structure while recommending the optimization of member stiffness matching, avoidance of asymmetric designs, and localized reinforcement for mortise–tenon edges and mid-column joints. Results provide valuable references for analogous projects.
This study aims to identify the most suitable pre-reinforcement support measures to prevent TBM jamming when passing through the fractured zone of a gully fault. Given the high likelihood of jamming in such areas, the research focuses on selecting the most effective support system by considering factors such as surrounding rock stability, strata displacement, support structure stress, and cost-effectiveness. Theoretical analysis is employed to predict TBM jamming risks, based on design data, a 10 m gully unit and fractured rock mass were established at 75 m in the excavation direction with assigned parameters. Support effects of pipe curtains, grouting, anchors, and arch supports were analyzed under four conditions: chemical grouting, conduit installation, advanced pipe grouting, and double-layer pipe grouting. On-site verification reveals that TBM jamming occurs when the resisting torque on the cutter exceeds the maximum torque the cutter can generate. For the gully fault, pre-reinforcement measures are essential to stabilize the surrounding rock. Among the different methods, surface drilling reinforcement is the most effective. It significantly improves the surrounding rock’s stability, reducing the plastic zone’s depth by approximately 52.3% compared to the advanced pipe shed method. The axial force on the anchors decreases by 77.9–83.8%, arch stress is reduced by 68.9–90.8%, and tunnel deformation is minimized by 2.13–50.78%, all of which contribute to enhancing the safety of the initial support structure. On-site coring results, TBM boring parameters, and deformation monitoring data confirm that the surface drilling pre-reinforcement method outperforms the grouting pre-reinforcement for the pipe shed, ensuring the safe excavation of TBM in the gully fault conditions. These findings provide valuable insights for TBM tunnel construction in similar geological environments.
In response to issues of long construction cycles, high pollution, and labor shortages in traditional cast-in-situ subway station construction, a refined 3D model of a large-segment prefabricated subway station was established using ABAQUS software, with mechanical behavior throughout the construction process studied based on the Shenzhen Huaxia Station project case. The model considers soil-structure interaction, incorporates a concrete plastic damage constitutive model and a steel elastic-plastic model, accurately simulates key components, including dry joints of mortise-tenon grooves, prestressed reinforcement, and bolted connections, and implements a sev-en-phase construction sequence. Research findings indicate: 1) During component as-sembly, the roof vault settlement remains ≤3.8mm, but backfilling significantly in-creases displacements (roof settlement reaches 45mm, middle slab deflection measures 66.91mm); 2) Longitudinal mortise-tenon joints develop stress concentrations due to stiffness disparities, with mid-column installation slots identified as vulnerable zones exhibiting maximum Von Mises stress of 32MPa; 3) Mid-column eccentricity induces structural asymmetry, causing increased deflection in longer-span middle slabs, corbel contact stress differentials up to 6MPa, and bolt tensile stresses exceeding 1.1GPa; 4) The arched roof effectively transfers loads via three-hinged arch mechanisms, though spandrel horizontal displacement triggers 5cm rebound in diaphragm wall displace-ment. Conclusions confirm overall stability of the prefabricated structure while rec-ommending optimization of member stiffness matching, avoidance of asymmetric de-signs, and localized reinforcement for mortise-tenon edges and mid-column joints. Results provide valuable references for analogous projects.