Dong-Jin Kim

Mr. Dong-Jin Kim


Research Focus & Metrics

Academic Career Length

4Years (2023-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
20 January 2024 in Buildings
Verified
Journal Article
Open access
PDF file
DWDaniel Darma Widjaja
Daniel Darma Widjaja
Sunkuk KimSunkuk Kim
Sunkuk Kim
DKDong-Jin Kim
Dong-Jin Kim
The construction of reinforced concrete (RC) structures inevitably consumes an excessive number of rebars, leading to significant cutting waste and carbon emissions. Extensive research has been conducted to minimize this issue and its consequences; however, these methods consistently consume a substantial number of rebars. This includes a previous study that utilizes the lap splice position optimization and special-length rebar concept without considering the lapping zone regulation. Moreover, conventional lap splices pose inherent drawbacks that could jeopardize the structural integrity of RC members. In contrast, mechanical couplers eliminate the need for rebar lapping, effectively reducing rebar consumption. This research aims to evaluate the impact of an integrated mechanical coupler and special-length-priority minimization algorithm on the reduction in rebar consumption and cutting waste in RC columns, achieving near-zero cutting waste. To validate the effectiveness of the proposed algorithm, it was applied to the column rebars of an RC building. The results revealed a significant reduction in the ordered rebar consumption by 18.25%, accompanied by substantial reductions in the cutting waste (8.93%), carbon emissions (12.99%), and total costs (9.94%) compared with a previous study. The outcomes provide the industry with insights into further reducing rebar consumption and its related consequences. Applying the proposed algorithm to various construction projects will further amplify the corresponding benefits.

7 March 2025 in Buildings
Verified
Journal Article
Open access
PDF file
LKLwun Poe Khant
Lwun Poe Khant
DWDaniel Darma Widjaja
Daniel Darma Widjaja
DKDong-Jin Kim
Dong-Jin Kim
TRTiti Sari Nurul Rachmawati
Titi Sari Nurul Rachmawati
Sunkuk KimSunkuk Kim
Sunkuk Kim
Rebar procurement inefficiencies, such as inaccurate quantity estimation and misaligned delivery schedules, often lead to excessive waste, supply shortages, and project delays. While existing optimization methods reduce cutting waste, their effectiveness diminishes without integration into supply chain management (SCM). This study presents an integrated framework to optimize rebar processing and supply chain management (SCM) by leveraging Building Information Modeling (BIM) and data-driven optimization strategies. A 24-floor case study validated the approach, optimizing continuous main rebars into special lengths and combining discontinuous lengths into cutting patterns based on special lengths. Rebar orders were organized into 12 batches, each meeting a 15-ton minimum and requiring order placement at least two months in advance. An activity database integrated rebar optimization with the construction schedule, facilitating SCM analysis. BIM automation streamlined procurement by generating Bar Bending Schedules (BBSs) and synchronizing rebar tracking with real-time updates, improving coordination, efficiency, and project outcomes, particularly in high-rise building projects.

21 January 2024 in Buildings
Verified
Journal Article
Open access
PDF file
DKDong-Jin Kim
Dong-Jin Kim
LKLwun Poe Khant
Lwun Poe Khant
DWDaniel Darma Widjaja
Daniel Darma Widjaja
Sunkuk KimSunkuk Kim
Sunkuk Kim
The production of steel rebar is an energy-intensive process that generates CO2 emissions. In construction, waste is generated by cutting stock-length rebar to the required lengths. The reduction rate achieved in most previous studies was limited due to adherence to lap splice positions mandated by building codes and the use of stock-length rebar. A previous study demonstrated a significant reduction in rebar usage and cutting waste, approaching zero, upon optimizing the lap splice position, reducing the number of splices, and utilizing special-length rebar. However, the reference length used to determine the special-length rebar was not clearly optimized. This study proposes a special length priority optimization model to minimize wall rebar usage and waste by reducing the number of splices while simultaneously ensuring an optimal reference length. The proposed model was validated using a case study wall with a standard hook anchorage at the top of the wall reinforcement. The optimization model reduced rebar cutting waste to 0.18% and decreased rebar usage from the original design by 16.16%.

25 December 2023 in Preprints.org
Verified
Preprint
Open access
PDF file
DWDaniel Darma Widjaja
Daniel Darma Widjaja
Sunkuk KimSunkuk Kim
Sunkuk Kim
DKDong-Jin Kim
Dong-Jin Kim
The construction of reinforced concrete (RC) structures inevitably consumes an excessive number of rebars, leading to significant cutting waste and carbon emissions. Extensive research has been conducted to minimize this issue and its consequences; however, these methods consistently consume a substantial number of rebars. This includes a previous study that utilizes the lap splice position optimization and special-length rebar concept without considering the lapping zone regulation. Moreover, conventional lap splices pose inherent drawbacks that could jeopardize the structural integrity of RC members. In contrast, mechanical couplers eliminate the need for rebar lapping, effectively reducing rebar consumption. This research aims to evaluate the impact of an integrated mechanical coupler and special-length-priority minimization algorithm on the reduction in rebar consumption and cutting waste in RC columns, achieving near-zero cutting waste. To validate the effectiveness of the proposed algorithm, it was applied to the column rebars of an RC building. The results revealed a significant reduction in ordered rebar consumption by 18.25%, accompanied by substantial reductions in cutting waste (8.93%), carbon emissions (12.99%), and total costs (10.81%) compared with a previous study. The outcomes provide the industry with insights into further reducing rebar consumption and its related consequences. Applying the proposed algorithm to various construction projects will further amplify the corresponding benefits.