Lwun Poe Khant

Ms. Lwun Poe Khant


Research Focus & Metrics

Academic Career Length

2Years (2025-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
7 March 2025 in Buildings
Verified
Journal Article
Open access
PDF file
LKLwun Poe Khant
Lwun Poe Khant
DWDaniel Darma Widjaja
Daniel Darma Widjaja
DKDong-Jin Kim
Dong-Jin Kim
TRTiti Sari Nurul Rachmawati
Titi Sari Nurul Rachmawati
Sunkuk KimSunkuk Kim
Sunkuk Kim
Rebar procurement inefficiencies, such as inaccurate quantity estimation and misaligned delivery schedules, often lead to excessive waste, supply shortages, and project delays. While existing optimization methods reduce cutting waste, their effectiveness diminishes without integration into supply chain management (SCM). This study presents an integrated framework to optimize rebar processing and supply chain management (SCM) by leveraging Building Information Modeling (BIM) and data-driven optimization strategies. A 24-floor case study validated the approach, optimizing continuous main rebars into special lengths and combining discontinuous lengths into cutting patterns based on special lengths. Rebar orders were organized into 12 batches, each meeting a 15-ton minimum and requiring order placement at least two months in advance. An activity database integrated rebar optimization with the construction schedule, facilitating SCM analysis. BIM automation streamlined procurement by generating Bar Bending Schedules (BBSs) and synchronizing rebar tracking with real-time updates, improving coordination, efficiency, and project outcomes, particularly in high-rise building projects.