José Oduque Nascimento de Jesus

Dr. José Oduque Nascimento de Jesus

orcid

Research Focus & Metrics

Academic Career Length

8Years (2019-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
31 January 2024 in Sustainability
Verified
Journal Article
Open access
PDF file
JJJosé Oduque Nascimento de Jesus
José Oduque Nascimento de Jesus
DMDiego Lima Medeiros
Diego Lima Medeiros
KEKarla Patrícia Santos Oliveira Rodriguez Esquerre
Karla Patrícia Santos Oliveira Rodriguez Esquerre
Oz SahinOz Sahin
Oz Sahin
WAWanderbeg Correia de Araujo
Wanderbeg Correia de Araujo
Water extracted from natural sources often requires treatment to meet the quality standards necessary for industrial use, involving physico-chemical processes such as coagulation, flocculation, and sedimentation. Inorganic coagulants, such as aluminum sulfate, are commonly used, although they generate a sludge with residual aluminum, classified as hazardous waste. Given this, biocoagulants, such as natural tannin-based polymers, have emerged as a promising alternative. Thus, the objective of this study was to evaluate the environmental performance of water treatment and sludge disposal at an industrial water treatment plant (WTP) of an oil refinery located in Brazil using aluminum sulfate and biocoagulant. The WTP of this study is located in the state of Bahia, Brazil, and is supplied by a surface water body, the Paraguaçu River—Lago de Pedra do Cavalo—which comes from a semi-arid region, and a lake called Catu Korea. The environmental analysis was carried out using the life cycle assessment (LCA) method, using the methodological framework recommended in ISO 14044, followed by economic analysis and circular economy analysis. The inventory used in the analyses contains field data, company records, related literature, and ecoinvent database version 3.3. The impact assessment considered the ILCD 2011 Midpoint+ method package, the AWARE method, and the cumulative energy demand (CED) method in SimaPro 8.4 software. The comparative results showed the greatest impacts in the Energy Demand, Water Footprint, Eutrophication, and Land Use categories for the biocoagulant scenario, in contrast to the Human Toxicity, Acidification, Ecotoxicity, Particulate Matter, Carbon Footprint, and Abiotic Depletion categories for aluminum sulfate. The economic analysis showed that 65% of the operational costs for material and energy inputs in water treatment are due to the use of electricity, and the water pumping stage is the biggest contributor to this consumption. Even though the price of the biocoagulant was identified as eight times that of aluminum sulfate, the water treatment cost with the biocoagulant was 21% higher compared to that with aluminum sulphate. In this regard, circular economy propositions for sludge valorization are discussed for use, recycling, or proper disposal. Thus, the environmental and economic analysis in this study offers insights into eco-efficiency promotion in water treatment and sludge management.

24 February 2025 in Sustainability
Verified
Journal Article
Open access
PDF file
Luciano Jose da SilvaLuciano Jose da Silva
Luciano Jose da Silva
VPVirginia Parente
Virginia Parente
JJJosé Oduque Nascimento de Jesus
José Oduque Nascimento de Jesus
KEKarla Patrícia Santos Oliveira Rodriguez Esquerre
Karla Patrícia Santos Oliveira Rodriguez Esquerre
Oz SahinOz Sahin
Oz Sahin
WAWanderbeg Correia de Araujo
Wanderbeg Correia de Araujo
This study evaluates whether pumped hydro storage (PHS) systems are economically competitive compared to natural gas thermal power plants in meeting peak load demand in Brazil and identifies the barriers and challenges that hinder their widespread adoption. It also examines the strategies, market mechanisms, and policy implications necessary to improve the economic and operational viability of PHS, enabling greater integration of variable renewable energy sources into the Brazilian power system. Using the levelized cost of electricity (LCOE) method, PHS is compared with natural gas thermoelectric plants for peak demand scenarios in Brazil. The results of simulations indicate that PHS is economically viable for operations exceeding seven hours per day, offering lower costs. In contrast, natural gas technologies are more cost-effective for shorter operations. The results provide two key contributions: they characterise the basic conditions under which PHS systems are more competitive than thermal power plants in meeting electricity demand, and they propose a methodology for calculating the LCOE of the analysed technological options, tailored to the Brazilian energy market. The conclusions highlight the potential of PHS to contribute to Brazil’s sustainable energy transition, provided that appropriate policies are implemented. These policies are especially crucial in scenarios where PHS is not economically competitive, to ensure compensation mechanisms for the flexibility services provided and the implementation of carbon pricing. Additionally, retrofitting existing hydropower plants to incorporate PHS components may reduce costs and mitigate environmental impacts compared to constructing new PHS facilities.

10 May 2025 in Water
Verified
Journal Article
Open access
PDF file
JJJosé Oduque Nascimento de Jesus
José Oduque Nascimento de Jesus
Luciano Jose da SilvaLuciano Jose da Silva
Luciano Jose da Silva
VPVirginia Parente
Virginia Parente
KEKarla Patrícia Santos Oliveira Rodriguez Esquerre
Karla Patrícia Santos Oliveira Rodriguez Esquerre
Oz SahinOz Sahin
Oz Sahin
WAWanderbeg Correia de Araujo
Wanderbeg Correia de Araujo
Given the relevance of sustainability, this study analyzed the impacts on water consumption in the production chain of ornamental stone pieces (marble and granite) and quartz-based composites. The goal was to compare the water demand throughout the process, from extraction to manufacturing, using 1 m3 blocks as the unit of analysis. This study was conducted in Bahia, a state with significant ornamental stone production, located in a semi-arid region with limited water availability. The methodology included data collection from participating companies, combined with sectorial information and the Ecoinvent version 3.3 database, modeled using the SimaPro 8.0 software. The impact assessment was carried out using the AWaRE (Water Scarcity Footprint) and ReCiPe Endpoint methods, following the guidelines of Life Cycle Assessment (LCA), as per ABNT NBR ISO 14040 standards. The results showed that marble and granite have lower water demand and environmental impact in the categories of particulate matter, human toxicity, ecotoxicity, eutrophication, and acidification when compared to quartz composites. The highest environmental impact occurred during the processing stage, which requires a large amount of water and generates effluents, losses, and particulate matter. The results indicate that marble and granite demand less water and exhibit lower environmental impacts—across categories like particulate matter, human toxicity, ecotoxicity, eutrophication, and acidification—than quartz composites. Notably, the processing stage incurred the highest environmental burden due to its intensive water use and consequent generation of effluents, losses, and particulate matter. These findings highlight the necessity of efficient water management and the adoption of circular economy principles—including water reuse and waste valorization—to promote long-term sustainability in the ornamental stone industry.

1 January 2019 in Brazilian Journal of Development
Verified
Journal Article
Open access
PDF file
WAWanderbeg Correia de Araujo
Wanderbeg Correia de Araujo
JJJosé Oduque Nascimento de Jesus
José Oduque Nascimento de Jesus
FPFrancisco Jairan Dionizio Pedro
Francisco Jairan Dionizio Pedro
LRLuanda Kívia de Oliveira Rodrigues
Luanda Kívia de Oliveira Rodrigues
DSDayvid Souza Santos
Dayvid Souza Santos
ISIsabelle da Silva Santos
Isabelle da Silva Santos
Estudo socioeconômico do Polo de Confecções no Agreste de Pernambuco: uma análise descritiva e exploratória/ Socioeconomic study of the clothing pole from the Agreste Pernambucano: a descriptive and exploratory analysis