CHEN YINTAO

Dr. CHEN YINTAO

orcid

Research Focus & Metrics

Academic Career Length

3Years (2024-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 January 2025 in Journal of Engineering
Verified
Journal Article
Open access
CYCHEN YINTAO
CHEN YINTAO
SXShao Xin
Shao Xin
CXChang Xiangyu
Chang Xiangyu
SJSiti Norafida Jusoh
Siti Norafida Jusoh
LZLu Zhongxiang
Lu Zhongxiang
XJXu Jun
Xu Jun
Accurate tunnel deformation prediction is critical for mitigating construction risks and ensuring tunnel stability. This study introduces a novel hybrid model integrating long short‐term memory (LSTM) networks and random forest (RF) to enhance the precision of tunnel deformation predictions during construction. Bayesian optimization was utilized to fine‐tune model parameters, ensuring optimal performance. Validated with multidepth data from the Yangjiashan highway tunnel in China, the hybrid model demonstrates remarkable adaptability to complex geological conditions. The results show that the LSTM‐RF model achieves a mean square error (MSE) of 0.0025, a root‐mean‐square error (RMSE) of 0.0052, and a coefficient of determination ( R 2 ) of 0.9810, outperforming individual models and other hybrid frameworks in predicting deformation trends. By effectively capturing temporal dependencies and modeling nonlinear residuals, the hybrid model provides a robust and reliable solution for improving safety and efficiency in tunneling projects. These findings emphasize the potential of hybrid approaches for geotechnical engineering, particularly in predictive maintenance and infrastructure monitoring.

1 June 2025 in Physics of Fluids
Verified
Journal Article
Closed access
XHXinkai Han
Xinkai Han
RARini Asnida Abdullah
Rini Asnida Abdullah
ZIZuhaila Ismail
Zuhaila Ismail
MZMengqiu Zhang
Mengqiu Zhang
AIAmber Islam
Amber Islam
CYCHEN YINTAO
CHEN YINTAO
Surficial slope failures in residual soils are prevalent in tropical and subtropical regions due to rainfall infiltration and seepage. While numerous studies have explored rainfall-induced slope stability through the interaction between pore water pressure (PWP) and effective stress, the influence of water gravity on effective stress under infiltration and seepage boundary conditions has often been overlooked. This study introduces a novel coupled PWP and water gravity increase method (PWP–WGIM) model to comprehensively analyze slope stability and failure processes. The proposed model integrates PWP dynamics with the water gravity increase method (WGIM), taking variations in infiltration capacity and seepage boundaries into consideration. Using COMSOL Multiphysics, the governing partial differential equations are numerically solved based on the finite element method with appropriate hydrologic boundary conditions (rainfall infiltration and seepage face boundary conditions). Results indicate that unsaturated soil slopes experience more pronounced changes in effective saturation, PWP, effective stress, and deformation at both shallow and deeper regions when evaluated with the PWP–WGIM model compared to PWP-only models. Furthermore, the safety factor for the PWP–WGIM model is lower, revealing that gravitational effects coupled with PWP significantly reduce slope stability under varying rainfall intensities. These findings highlight the importance of incorporating water gravity in slope stability assessments, providing a more accurate predictive tool for managing risks in regions prone to landslides and erosion.

23 May 2026 in Buildings
Verified
Journal Article
Open access
PDF file
CYCHEN YINTAO
CHEN YINTAO
SJSiti Norafida Jusoh
Siti Norafida Jusoh
RARini Asnida Abdullah
Rini Asnida Abdullah
MSMOHAMAD SHAZWAN SHAZWAN BIN AHMAD SHAH AHMAD SHAH
MOHAMAD SHAZWAN SHAZWAN BIN AHMAD SHAH AHMAD SHAH
BZBaowen Zhang
Baowen Zhang
LWLifeng Wang
Lifeng Wang
The conventional double-sidewall pilot tunnelling method (CDWM) has been widely applied in the construction of large-span tunnels. However, when applied to shallow-buried tunnels in weak surrounding rock, the method often suffers from excessive deformation and complex support conversion. To address these limitations, this study proposes an optimized excavation scheme, namely the double-sidewall pilot tunnelling method with reserved rock walls (DRWM). The Yangjiashan Tunnel in Zhejiang Province, China, was selected as the engineering case for investigation. Field monitoring data and numerical simulations were integrated to evaluate the deformation behaviour and structural response of the tunnel during excavation. The results indicate that DRWM significantly improves deformation control compared with the conventional CDWM. The maximum crown settlement and horizontal convergence were effectively reduced, and stress concentration in the initial support structure was mitigated. Furthermore, a sensitivity analysis was conducted to investigate the influence of the lateral distance between the temporary support and the reserved rock wall. Within the investigated single-parameter analysis, a spacing of 0.4–0.5 m showed a relatively balanced response in terms of crown settlement, horizontal convergence, support stress, and construction operability. The findings demonstrate that, under the investigated Grade V weak rock conditions, the DRWM showed improved deformation control compared with the CDWM in the numerical comparison, highlighting its potential applicability for optimization in comparable engineering settings.

1 January 2024 in Revista Internacional de Métodos Numéricos para Cálculo y Diseño en Ingeniería
Verified
Journal Article
Open access
LZL. Zhongxiang
L. Zhongxiang
SLShou Lingchao
Shou Lingchao
RARini Asnida Abdullah
Rini Asnida Abdullah
MSM. Shahrin
M. Shahrin
CYCHEN YINTAO
CHEN YINTAO
ZHZhang Hengxu
Zhang Hengxu
This study utilizes ABAQUS finite element software to analyze embankment deformation during shield tunneling. Results reveal that shield tunneling effects are manageable.The left tunnel line successfully tunnels beneath the embankment, causing a maximum settlement of 8.7 mm, meeting regulations. The ground surface exhibits a "V"-shaped lateral settlement trough, approximately five times the tunnel centerline width. Conversely, the right tunnel line induces a more extensive impact, with a 12.2 mm maximum settlement.Different lateral settlement patterns emerge in soil at varying depths. The left tunnel creates a "V" shape, with slightly increasing settlement above the tunnel axis as depth increases, accompanied by narrower troughs. The right tunnel line results in a pronounced "W" shape, especially at the grouting layer depth.Horizontal displacement forms an "S" shape, with maximum displacement at positions ±i from the tunnel axis. The right tunnel line induces greater maximum horizontal displacement than the left.In summary, this numerical analysis provides insights into embankment deformation during shield tunneling, aiding in assessing the impact and guiding safe tunneling beneath embankments.

24 June 2026 in Buildings
Verified
Journal Article
Open access
PDF file
CYCHEN YINTAO
CHEN YINTAO
ZLZhongxiang Lu
Zhongxiang Lu
JLJINGWEI LI
JINGWEI LI
KYKaifang Yang
Kaifang Yang
LWLifeng WANG
Lifeng WANG
To reveal the differences in stratum response among different environmental sections and the influences of key construction parameters on deep soil deformation during river-crossing double-line shield tunneling, the paper takes the East Genshan Road River-Crossing Tunnel as the engineering case, and systematically investigates the stratum responses of the onshore and riverbed sections as well as the effects of construction parameters via field monitoring, measured construction parameter data and three-dimensional finite element simulation based on ABAQUS. The simulation results suggest that, compared with the onshore section, the riverbed section may present larger cumulative displacement, more intense deep soil response and a wider influence range of transverse settlement under the investigated high-water-pressure and saturated soft-soil conditions. These differences are more reasonably interpreted as the combined effects of burial depth, stratum composition, mechanical properties, hydraulic boundary conditions, surface boundary constraints and overburden conditions. Among these factors, the high-water-pressure and saturated soft-soil environment may contribute to the enhanced disturbance diffusion and cumulative deformation response observed in the riverbed section. The longitudinal displacement evolution of the riverbed section presents obvious stratified transmission characteristics, and its transverse settlement trough shows a typical double-peak W-shaped distribution with larger peak values, wider trough profile and slower far-field attenuation. The single-factor parametric analysis suggests that, within the investigated parameter ranges, cutterhead torque produced the largest absolute settlement variation, followed by total shield thrust and tunneling speed. The results of this study can provide a reference basis for settlement control and construction parameter optimization of river-crossing double-line shield tunneling in high-water-pressure and saturated soft soil strata.

1 January 2025 in Revista Internacional de Métodos Numéricos para Cálculo y Diseño en Ingeniería
Verified
Journal Article
Open access
ZXZhongying Xu
Zhongying Xu
XSXin Shao
Xin Shao
JHJianming He
Jianming He
CYCHEN YINTAO
CHEN YINTAO
LWLifeng Wang
Lifeng Wang
This study comprehensively investigates the mechanical behavior and deformation patterns of adjacent foundation pits sharing a common ground connecting wall. Utilizing a combination of detailed field measurements and finite element modeling, the study simulates the excavation process to analyze the mutual interactions between two adjacent pits of equal depth. Results indicate that the excavation of a subsequent pit influences both surface settlement and the horizontal displacement of the retaining structure of the first-excavated pit. Specifically, the surface settlement outside the first-excavated pit increased by 0.08% H (where H is the excavation depth of the first pit) within the influence range of 0 to 2.9 H from the shared ground connecting wall. Similarly, within the range of 2.76 H, the horizontal displacement of the retaining structure of the first-excavated pit showed the greatest increase at 2 H, reaching 0.086% H0.Mitigative measures, such as increasing the wall thickness or optimizing the excavation sequence, are found to effectively control deformation.These findings provide valuable insights into the design and construction of excavations involving shared ground connecting walls.