Zhongxiang Lu

Dr. Zhongxiang Lu


Research Focus & Metrics

Academic Career Length

1Year (2026-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
23 May 2026 in Buildings
Verified
Journal Article
Open access
PDF file
CYCHEN YINTAO
CHEN YINTAO
SJSiti Norafida Jusoh
Siti Norafida Jusoh
RARini Asnida Abdullah
Rini Asnida Abdullah
MSMOHAMAD SHAZWAN SHAZWAN BIN AHMAD SHAH AHMAD SHAH
MOHAMAD SHAZWAN SHAZWAN BIN AHMAD SHAH AHMAD SHAH
BZBaowen Zhang
Baowen Zhang
LWLifeng Wang
Lifeng Wang
The conventional double-sidewall pilot tunnelling method (CDWM) has been widely applied in the construction of large-span tunnels. However, when applied to shallow-buried tunnels in weak surrounding rock, the method often suffers from excessive deformation and complex support conversion. To address these limitations, this study proposes an optimized excavation scheme, namely the double-sidewall pilot tunnelling method with reserved rock walls (DRWM). The Yangjiashan Tunnel in Zhejiang Province, China, was selected as the engineering case for investigation. Field monitoring data and numerical simulations were integrated to evaluate the deformation behaviour and structural response of the tunnel during excavation. The results indicate that DRWM significantly improves deformation control compared with the conventional CDWM. The maximum crown settlement and horizontal convergence were effectively reduced, and stress concentration in the initial support structure was mitigated. Furthermore, a sensitivity analysis was conducted to investigate the influence of the lateral distance between the temporary support and the reserved rock wall. Within the investigated single-parameter analysis, a spacing of 0.4–0.5 m showed a relatively balanced response in terms of crown settlement, horizontal convergence, support stress, and construction operability. The findings demonstrate that, under the investigated Grade V weak rock conditions, the DRWM showed improved deformation control compared with the CDWM in the numerical comparison, highlighting its potential applicability for optimization in comparable engineering settings.

24 June 2026 in Buildings
Verified
Journal Article
Open access
PDF file
CYCHEN YINTAO
CHEN YINTAO
ZLZhongxiang Lu
Zhongxiang Lu
JLJINGWEI LI
JINGWEI LI
KYKaifang Yang
Kaifang Yang
LWLifeng WANG
Lifeng WANG
To reveal the differences in stratum response among different environmental sections and the influences of key construction parameters on deep soil deformation during river-crossing double-line shield tunneling, the paper takes the East Genshan Road River-Crossing Tunnel as the engineering case, and systematically investigates the stratum responses of the onshore and riverbed sections as well as the effects of construction parameters via field monitoring, measured construction parameter data and three-dimensional finite element simulation based on ABAQUS. The simulation results suggest that, compared with the onshore section, the riverbed section may present larger cumulative displacement, more intense deep soil response and a wider influence range of transverse settlement under the investigated high-water-pressure and saturated soft-soil conditions. These differences are more reasonably interpreted as the combined effects of burial depth, stratum composition, mechanical properties, hydraulic boundary conditions, surface boundary constraints and overburden conditions. Among these factors, the high-water-pressure and saturated soft-soil environment may contribute to the enhanced disturbance diffusion and cumulative deformation response observed in the riverbed section. The longitudinal displacement evolution of the riverbed section presents obvious stratified transmission characteristics, and its transverse settlement trough shows a typical double-peak W-shaped distribution with larger peak values, wider trough profile and slower far-field attenuation. The single-factor parametric analysis suggests that, within the investigated parameter ranges, cutterhead torque produced the largest absolute settlement variation, followed by total shield thrust and tunneling speed. The results of this study can provide a reference basis for settlement control and construction parameter optimization of river-crossing double-line shield tunneling in high-water-pressure and saturated soft soil strata.