Fei Wang

Dr. Fei Wang

orcid

Research Focus & Metrics

Academic Career Length

5Years (2022-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
31 July 2023 in Applied Sciences
Verified
Journal Article
Open access
PDF file
CHChenkai Hong
Chenkai Hong
ZLZhongda Lv
Zhongda Lv
FWFei Wang
Fei Wang
ZZZhuo Zhao
Zhuo Zhao
LWlei wang
lei wang
Recently, the diameters and construction water depths of the pile foundations of planned and newly built sea-crossing bridges have been increasing greatly. Hydrodynamic loads are the key control factors in the design of super-large-diameter piles. However, most of the previous studies focused on the inline force on the pile with a small diameter, and there were few cases to consider the impact of the transverse force on the hydrodynamic load of the pile under wave-current actions. In this study, to understand the hydrodynamic loads on such deep-water super-large-diameter piles, the prototype was one of the 6.3-m piles used in the Xihoumen Rail-cum-Road Bridge, and 1:60-scale model tests were carried out in an experimental tank, with the actions of regular waves and waves combined with currents used as loads. The influence of the current velocity and static wave height on the inline and transverse forces on the pile was measured and analyzed. The experimental results indicate that with increasing current velocity, the fluctuation characteristics of the wave-current-induced inline and transverse forces change significantly, and their peak values increase obviously compared to those induced by only waves. In particular, the peak transverse force increases tens of times and can become equivalent to the inline force. The modified Morison formula and Kutta–Joukowski formula are used to derive the correlations between the drag coefficient CD, inertia coefficient CM, lift coefficient CL, and redefined Keulegan–Carpenter number KC*. Under wave-current action, the transverse force contributes quite significantly to the hydrodynamic load on a super-large-diameter pile, making it easier to trigger extreme structural loads. The results presented herein are an important reference for the engineering designs of such super-large-diameter piles.

1 January 2022 in Ocean Engineering
Verified
Journal Article
Closed access
FWFei Wang
Fei Wang
PWPeng-Fei Wang
Peng-Fei Wang
ZLZhong-Da Lyu
Zhong-Da Lyu
ZZZhuo Zhao
Zhuo Zhao
BMBo-Han Ma
Bo-Han Ma

11 December 2023 in Case Studies in Construction Materials
Verified
Journal Article
Open access
PZPan Zou
Pan Zou
HCHui-Juan Chang
Hui-Juan Chang
FWFei Wang
Fei Wang
YCYu-Liang Cai
Yu-Liang Cai
ZZZhe Zhang
Zhe Zhang
ZLZhong-Da Lv
Zhong-Da Lv
Steam curing can accelerate the hydration reaction rate of concrete, enhancing the production efficiency of prefabricated T-beams. Excessive temperature differences during steam curing could lead to early cracking of concrete and affect the durability of structures. This paper conducted experiments and numerical simulations to study the variation law of the early-age temperature field of T-beams concrete, and the aim was to seek effective steam curing schemes. The time-history law of early-age temperature variation of T-beam under the coupling effect of hydration heat and ambient temperature was measured. The early-age temperature field of T-beam during steam curing was simulated by ABAQUS and UMATHT subroutine. The effect of steam curing parametric on the early-age temperature field was discussed by five steam curing schemes. The conclusions indicated that under the effect of steam curing, the temperature difference between the interior and the surface of T-beam concrete decreased. The early temperature variation of T-beam was mostly influenced by the thermostatic temperature and thermostatic time. When the thermostatic time is set to 5 h and the thermostatic temperature exceeds 60 °C, there will be a temperature difference of over 25 °C between the surface of the T-beam and the ambient environment, which can cause cracking of the concrete surface. When the thermostatic temperature is set to 50 °C, it is recommended that the thermostatic time should not exceed 10 h.

1 January 2022 in Advances in Civil Engineering
Verified
Journal Article
Open access
PDF file
LWlei wang
lei wang
ZLZhongda Lv
Zhongda Lv
AXAi-Min Xu
Ai-Min Xu
FWFei Wang
Fei Wang
XDXin-Long Dong
Xin-Long Dong
In the construction of large‐tonnage box girder, the construction load of box girder transport is generally greater than the operating load in highway industry; therefore, it is a crucial task to carry out accurate simulation and optimization on bearing box girder. For this purpose, the refined modeling method of 40 m/1270t box girder is studied first in this paper, followed by detailed stress analysis by considering the impact coefficient of vehicles and the most unfavorable conditions. Tracking tests on dead load, prestressed load, and the transport load have shown that the calculated stress values obtained by the refined models are very close to the measured stress values. Based on dynamic strain test of the vehicles at the speed of 4 km/h, the impact coefficient of four vehicles is estimated to be 1.08 and its value meets the requirements of no more than 1.1 provided by the vehicle manufacturer. Aimed at no tensile stress in the midspan section, the optimized geometry of 40 m box girder is obtained with less concrete and longitudinal prestressed tendons. These results demonstrate the plausibility and validity of the proposed research methods and optimization schemes for large‐tonnage box girder transport.

26 March 2026 in Buildings
Verified
Journal Article
Open access
PDF file
TZTao Zhang
Tao Zhang
WYWeitao Ye
Weitao Ye
WYWei Yang
Wei Yang
ZZZuqing Zhao
Zuqing Zhao
LWLei Wang
Lei Wang
YCYuliang Cai
Yuliang Cai
Early-age cracking is a common issue in the prefabrication of large-scale box girders, and the application of pre-tensioning techniques to introduce pre-compressive stress is an effective measure to mitigate such cracking. To determine an optimal pre-tensioning scheme for the 60 m large-scale box girder used in the Ningbo–Xiangshan intercity railway, friction coefficient tests and field stress monitoring were conducted. A numerical model simulating the pre-tensioning process of the box girder, accounting for the constraint of the steel formwork, was developed using Abaqus 2021. Based on the validated finite element model, a parametric study was performed to investigate the effects of friction coefficient, internal formwork roof, and prestressing tendon arrangement on the pre-compressive stress. The results indicate that the bond force between cast-in-place concrete and steel formwork is approximately 2.1 times the sliding friction force. As the friction coefficient increases, the pre-compressive stress in the box girder exhibits a notable decreasing trend. For the critical midspan section S40, the inclusion of frictional effects results in a more uniform distribution of pre-compressive stress. Compared to the case without the internal formwork roof, its inclusion leads to a 9.2% to 10.4% reduction in pre-compressive stress at section S40. To mitigate prestress losses transmitted from the ends to the midspan section, it is recommended that the internal formwork be completely removed prior to prestressing tensioning. The pre-compressive stress in the box girder varies considerably with different prestressing combinations. The comparative analysis of different prestressing combinations reveals substantial variations in pre-compressive stress distribution. After evaluating multiple schemes, the optimal pre-tensioning sequence for the 60-m railway box girder is determined as follows: sequentially tensioning tendon groups F1-2, F1-4, F1-5, F1-6, and B2-3, with an anchorage stress controlled at 558 MPa. This scheme ensures that all critical sections of the box girder remain in a pre-compressive state. In particular, the pre-compressive stress at the key midspan section S40 ranges from 1.12 to 1.26 MPa, achieving the desired effect and effectively suppressing early-age cracking in the large-scale box girder concrete.

23 October 2025 in Buildings
Verified
Journal Article
Open access
PDF file
XFXu Feng
Xu Feng
YCYuliang Cai
Yuliang Cai
FWFei Wang
Fei Wang
ZLZhongda Lv
Zhongda Lv
WYWei Yang
Wei Yang
LWLei Wang
Lei Wang
Large precast concrete box girders are susceptible to cracking due to excessive temperature differentials induced by early-age hydration heat, compromising structural reliability and durability. Investigating the early-age hydration heat in large precast box girders and proposing corresponding temperature control measures based on influencing factor analysis is therefore essential. The present research employs field testing and numerical simulation of a 60 m precast railway box girder to develop a UMATHT subroutine and establish a refined finite element model incorporating temperature-dependent material properties and hydration degree. Results demonstrate that the early-age temperature field exhibits an initial rise followed by a decline. Pouring temperature exhibits a positive correlation with both peak temperature and maximum temperature differential; a 5 °C increase in pouring temperature elevates the temperature differential by nearly 1.8 °C. Cement content significantly affects peak temperature, with an average increase of approximately 5.4 °C per additional 50 kg/m3 of cement. Ambient wind speed exerts a greater influence on temperature evolution during the cooling phase than the heating phase. Increased ambient wind speed reduces the peak sectional temperature while concurrently increasing the surface temperature gradient on the windward side of the girder.