Mohammad Ichsan

Dr. Mohammad Ichsan

orcid

Research Focus & Metrics

Academic Career Length

17Years (2010-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
24 February 2023 in Cogent Business & Management
Verified
Journal Article
Open access
ASAgung Sudjatmoko
Agung Sudjatmoko
Mohammad IchsanMohammad Ichsan
Mohammad Ichsan
MAMarcella Astriani
Marcella Astriani
MAMariani
Mariani
ACAngeline Clairine
Angeline Clairine
This paper investigates how the impact of the COVID-19 pandemic crisis affects the innovation of Micro, small and medium enterprises (MSME) in Indonesia and how innovation, namely product, process, marketing, and organizational innovation, acts as a mediator for MSME performance. An integrated conceptual framework is developed and empirically tested using cross-sectional survey design data from 300 MSME owners in Indonesia. Structural Equation Modelling (SEM) software Smart PLS examines the hypotheses testing. Descriptive analysis is also used to provide demographic data of the owners of MSMEs in Indonesia. This study reveals that the COVID-19 pandemic crisis significantly and positively impacts four dimensions of innovation. The results indicate that the pandemic triggered the MSME owners to innovate or adapt. This study also found that four dimensions of innovation partially mediate the COVID-19 pandemic crisis and MSME performance relationship. The results show that product, marketing, and organizational innovation significantly impact MSME performance. With marketing innovation as the lowest innovation dimension that affects performance, and organizational innovation as a major contributor that significantly impacts MSME performance. However, the results also demonstrate that among the four dimensions of innovation, process innovation does not significantly impact MSME performance which is highlighted by an indicator such as reducing production cost. This shows that reducing production costs is optional and does not mean that the performance of MSME will increase significantly. Therefore, the findings of this study are set to advance theories in MSME innovation and performance. It also presents important implications for the MSME owners to develop a successful and sustainable MSME industry.

4 March 2024 in Cogent Business & Management
Verified
Journal Article
Open access
DGDyah Gandasari
Dyah Gandasari
DTDavid Tjahjana
David Tjahjana
DTDiena Dwidienawati Tjiptadi
Diena Dwidienawati Tjiptadi
Mohammad IchsanMohammad Ichsan
Mohammad Ichsan

13 October 2022 in Sustainability
Verified
Journal Article
Open access
PDF file
Mohammad HamsalMohammad Hamsal
Mohammad Hamsal
DTDiena Dwidienawati Tjiptadi
Diena Dwidienawati Tjiptadi
Mohammad IchsanMohammad Ichsan
Mohammad Ichsan
ASAhmad Syamil
Ahmad Syamil
BTBambang Trigunarsyah
Bambang Trigunarsyah
Project management teams have to deal with risks and uncertainties from the project portfolio level to the individual level. Furthermore, project complexity adds to the challenges faced by the project management team. Moreover, projects are performed by project management teams comprising various individuals from different backgrounds. While they perform their project tasks, they have to face dynamics in the projects that lead to major challenges or stress and bounce back from negative experiences to be less likely to experience the detrimental effects of intimidating, uncertain situations. This study aims to show the influence of multi-perspective factors on team resilience and to confirm how team resilience influences team performance. A descriptive, quantitative study was conducted to test the six hypotheses of the study. Data collected through purposive sampling and snowball techniques were analyzed using a structural equation model with SmartPLS software version 3.2.9. The finding shows that individual resilience from the individual perspective, team resources, team interactions from the team perspective and organizational practice all have a positive and significant influence on team resilience, but transformational leadership does not. Team resilience has a positive, significant relationship with team performance. Team resilience appears to have had a strong and significant effect on team performance in multiple industries in Indonesia during the COVID-19 pandemic. Research implications and suggestions for future research are also given.

1 January 2019 in Procedia Computer Science
Verified
Journal Article
Open access
MBMohammed Ali Berawi
Mohammed Ali Berawi
ASAdinugroho Sunardi
Adinugroho Sunardi
Mohammad IchsanMohammad Ichsan
Mohammad Ichsan

12 August 2023 in Heliyon
Verified
Journal Article
Open access
RMRossy Armyn Machfudiyanto
Rossy Armyn Machfudiyanto
FMFadhilah Muslim
Fadhilah Muslim
Windra Priatna HumangWindra Priatna Humang
Windra Priatna Humang
NWNurul Wahjuningsih
Nurul Wahjuningsih
IKInsannul Kamil
Insannul Kamil
YPyanuar yudha adi putra
yanuar yudha adi putra
The electricity supply in Indonesia is considered inefficient, as indicated by the increase in the Cost of Generation Provision (CGP) in the 2016–2021 period. Indications of high supply chain risks are not commensurate with the low demand for LNG. Nevertheless, every power plant on small islands must be served by minimizing costs. This study aims to develop a risk-based small-scale supply chain model to distribute LNG in archipelagic areas by minimizing infrastructure costs, including investment and operations. This paper formulates a risk-based small-scale LNG (SS-LNG) model with milk runs, which are rarely applied in LNG supply chains, thus impacting cost efficiency and the sustainability of LNG supply in Indonesia. The simulation was carried out using the vehicle routing problem with milk run (VRPMR) method. The optimization results show that the 2-vessel scheme is an optimal and efficient risk-based SS-LNG supply chain model. However, it appears that changing the scheme from 1 to 2 vessels generally increases the infrastructure tariff by 3%, or USD 0.11 per MMBTU. This risk-based supply chain model is able to ensure a fuel cost efficiency of 27% for power plants.

3 July 2025 in Applied Sciences
Verified
Journal Article
Open access
PDF file
Mohammad IchsanMohammad Ichsan
Mohammad Ichsan
WIWisnu Isvara
Wisnu Isvara
SKSyaeful Karim
Syaeful Karim
Some construction projects in Indonesia have been experiencing frequent major delays, and there is an urgent need to perform a comprehensive schedule forecast to anticipate them. This study aims to enhance the forecast of the project-completion schedule of a major railway construction project in Indonesia, with considerations of the identified project risks. Using structured interviews of practitioners and experts, this study has identified key risks in the Phase II Construction project. The @RISK V8.5.1 software was used to run Monte Carlo Simulation to calculate the scheduling forecast more accurately with the PERT method. The results of the scheduling simulation on the inherent key risks that affect key activities in the critical path show that there are additional days due to pre-mitigation during the construction of the project, ranging from 130.81% to 136.25% of the initial contract completion duration to approximately 95.82% to 102.23% of the original contract completion duration. This research provides a way not only to identify and prioritize the risks but also to quantify them to estimate the project completion schedule more up to 95% accuracy using Monte Carlo Simulation, where the model can be used to plan and monitor the risks of future projects.