Paulo Roberto Duailibe Duailibe Duailibe Monteiro

Prof. Dr. Paulo Roberto Duailibe Duailibe Duailibe Monteiro

orcid

Research Focus & Metrics

Academic Career Length

17Years (2010-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
17 October 2024 in Energies
Verified
Journal Article
Open access
PDF file
ASAndré Fernando Schiochet
André Fernando Schiochet
PMPaulo Roberto Duailibe Duailibe Duailibe Monteiro
Paulo Roberto Duailibe Duailibe Duailibe Monteiro
TBThiago Trezza Borges
Thiago Trezza Borges
JFJoão Alberto Passos Filho
João Alberto Passos Filho
JOJanaina Goncalves de Oliveira
Janaina Goncalves de Oliveira
The growing integration of renewable energy sources, such as photovoltaic and wind systems, into energy grids has underscored the need for reliable control mechanisms to mitigate the inherent intermittency of these sources. According to the Brazilian grid operator (ONS), there have been cascading disconnections in renewable energy distributed systems (REDs) in recent years, highlighting the need for robust control models. This article addresses this issue by presenting the validation of an active power ramp rate control (PRRC) function for a PV plant coupled with a Battery Energy Storage System (BESS) using WECC generic models. The proposed model underwent rigorous validation over an extended analysis period, demonstrating good accuracy using the Root Mean Squared Error (RMSE) and an R-squared (R2) metrics for the active power injected at the Point of Connection (POI), PV active power, and BESS State of Charge (SOC), providing valuable insights for medium and long-term analyses. The ramp rate control module was implemented within the plant power controller (PPC), leveraging second-generation Renewable Energy Systems (RES) models developed by the Western Electricity Coordination Council (WECC) as a foundational framework. We conducted simulations using the Anatem software, comparing the results with real-world data collected at 100 ms to 1000 ms intervals from a PV plant equipped with a BESS in Brazil. The proposed model underwent rigorous validation over an extended analysis period, with the presented results based on two days of measurements. The positive sequence model used to represent this control demonstrated good accuracy, as confirmed by metrics such as the Root Mean Squared Error (RMSE) and R-squared (R2). Furthermore, the article underscores the critical role of accurately accounting for the power sampling rate when calculating the ramp rate.

3 February 2021 in Electrical Engineering
Verified
Journal Article
Closed access
PDF file
MSMarcelo F. de Souza
Marcelo F. de Souza
AQAndré T. Queiroz
André T. Queiroz
GSGuilherme Goncalves Sotelo
Guilherme Goncalves Sotelo
PMPaulo Roberto Duailibe Duailibe Duailibe Monteiro
Paulo Roberto Duailibe Duailibe Duailibe Monteiro
MFmarcio Fortes
marcio Fortes
APAlexander Polasek
Alexander Polasek

7 February 2024 in Electrical Engineering
Verified
Journal Article
Closed access
PDF file
PMPaulo Roberto Duailibe Duailibe Duailibe Monteiro
Paulo Roberto Duailibe Duailibe Duailibe Monteiro
LGLeandro Pereira Gama
Leandro Pereira Gama
TBThiago Trezza Borges
Thiago Trezza Borges
MFmarcio Fortes
marcio Fortes
LHLeticia Fritz Henrique
Leticia Fritz Henrique

1 October 2020 in IEEE Latin America Transactions
Verified
Journal Article
Closed access
TRTiago Ribeiro
Tiago Ribeiro
MAMunique Araújo
Munique Araújo
APAleksandro Pereira
Aleksandro Pereira
PMPaulo Roberto Duailibe Duailibe Duailibe Monteiro
Paulo Roberto Duailibe Duailibe Duailibe Monteiro
This paper presents a comparative analysis for two alternatives of industrial substation arrangement with selective secondary radial type: first with one main transformer and one reserve and the second one with two main transformers and one reserve. The analysis are based on the power flow calculation, short circuit and reliability indices using the Electrical Power System Analysis Software (ETAP) and on the acquisition costs of equipment and materials. The analysis' methodology application in both alternatives is presented and the results are analyzed and compared as well.

1 July 2016 in Ingeniare. Revista chilena de ingeniería
Verified
Journal Article
Open access
PDF file
PMPaulo Roberto Duailibe Duailibe Duailibe Monteiro
Paulo Roberto Duailibe Duailibe Duailibe Monteiro
Carlos Alberto Pereira SoaresCarlos Alberto Pereira Soares
Carlos Alberto Pereira Soares
LRLeonardo de C. Rocha
Leonardo de C. Rocha
WSWainer S Silva
Wainer S Silva
The analyses for overcoming problems arising in basic grid substation buses and equipment are of essential importance to the Brazilian electric sector in view of the constant expansion of this system. These analyses are not simple tasks because they involve an evaluation of the impacts caused by installations arising from new connections and because they always include various studies. This paper presents examples of necessary investigations into the causes of the rated characteristic violations of basic grid installation components. An overview of the proposed electrical system that will be evaluated in conjunction with a new thermal generator plant connection to an existing system substation system is presented.

30 October 2023 in Caderno Pedagógico
Verified
Journal Article
Open access
PDF file
ASAndré Fernando Schiochet
André Fernando Schiochet
PMPaulo Roberto Duailibe Duailibe Duailibe Monteiro
Paulo Roberto Duailibe Duailibe Duailibe Monteiro
TBThiago Trezza Borges
Thiago Trezza Borges
JOJanaina Goncalves de Oliveira
Janaina Goncalves de Oliveira
PCPaulo Fernando Santos Dias De Carvalho
Paulo Fernando Santos Dias De Carvalho
Para avaliar os efeitos dos recursos energéticos distribuídos (DER) na rede, são necessários modelos robustos para os inversores de frequência, com a capacidade de representar adequadamente os impactos e as respostas aos modos de controlo. A fim de utilizar modelos menos complexos e atualizados, além de ser representativo em estudos de estabilidade, um modelo genérico de sequência positiva foi desenvolvido no programa CEPEL ANATEM baseado no modelo EPRI. O modelo foi simulado nas mesmas condições de operação que os testes do EPRI. Um sistema com uma fonte emulando as curvas de tensão e frequência (tensão de play-in e frequência de play-in) foi considerado. Os resultados demonstram a validação do modelo, obtendo resultados semelhantes aos testes do EPRI. O modelo apresentado é recomendado para avaliar o impacto de DERs conectados no sistema de granel, verificando o desempenho de proteções e desconexões e o respectivo efeito no sistema de transmissão.