Janaina Goncalves de Oliveira

Dr. Janaina Goncalves de Oliveira

Senior Lecturer, Department of Electrical Engineering, Uppsala University, Uppsala, Sweden
orcid

Research Focus & Metrics

Academic Career Length

17Years (2010-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
29 July 2022 in Energies
Verified
Journal Article
Open access
PDF file
SASara Anttila
Sara Anttila
JDJessica Santos Dohler
Jessica Santos Dohler
JOJanaina Goncalves de Oliveira
Janaina Goncalves de Oliveira
CBCecilia Boström
Cecilia Boström
In the past decade, inverter-integrated energy sources have experienced rapid growth, which leads to operating challenges associated with reduced system inertia and intermittent power generation, which can cause instability and performance issues of the power system. Improved control schemes for inverters are necessary to ensure the stability and resilience of the power system. Grid-forming inverters dampen frequency fluctuations in the power system, while grid-following inverters can aggravate frequency problems with increased penetration. This paper aims at reviewing the role of grid-forming inverters in the power system, including their topology, control strategies, challenges, sizing, and location. In order to facilitate continued research in this field, a comprehensive literature review and classification of the studies are conducted, followed by research gaps and suggestions for future studies.

1 April 2015 in Renewable Energy
Verified
Journal Article
Closed access
AAAndrei Oliveira Almeida
Andrei Oliveira Almeida
PBPedro Gomes Barbosa
Pedro Gomes Barbosa
JOJanaina Goncalves de Oliveira
Janaina Goncalves de Oliveira
JDJorge L. Duarte
Jorge L. Duarte
Paulo F. RibeiroPaulo F. Ribeiro
Paulo F. Ribeiro

21 February 2020 in Energies
Verified
Journal Article
Open access
PDF file
SMSérgio Mayrink
Sérgio Mayrink
JOJanaina Goncalves de Oliveira
Janaina Goncalves de Oliveira
Bruno DiasBruno Dias
Bruno Dias
LOLeonardo Willer De Oliveira
Leonardo Willer De Oliveira
JSJuan De Santiago
Juan De Santiago
GRGustavo S. Rosseti
Gustavo S. Rosseti
The present work evaluates the application of regenerative braking for energy recovery in diesel-electric freight trains to increase efficiency and to improve decarbonization. The energy from regenerative braking has to be stored onboard when the track is not electrified. Different technologies of energy recovery are presented and discussed. The energy balance of an existing route is presented and simulated for different battery sizes. The analysis is illustrated with experimental data from an important Brazilian railway. Results show that the energy recovery from regenerative brake is a feasible investment and may be recommended to increase the efficiency in transportation and also to improve the low carbon mobility in railway systems.

1 June 2012 in IET Electrical Systems in Transportation
Verified
Journal Article
Closed access
JOJanaina Goncalves de Oliveira
Janaina Goncalves de Oliveira
HSH. Schettino
H. Schettino
VGV. Gama
V. Gama
RCR. Carvalho
R. Carvalho
HBH. Bernhoff
H. Bernhoff
The combination of a flywheel device with a battery source has several advantages, such as high-peak power capacity, high energy density and reduction in the number of charging/discharging cycles in the battery. The flywheel system investigated here uses a double-wound flywheel motor/generator to divide the system into two different voltage/power levels. An AC/DC/AC converter is used to connect the high-power windings of the flywheel machine to the traction motor. The control strategy of the AC/DC/AC converter is discussed. The simulations of the complete system are carried out using Simulink and are compared with the experimental results, obtained from a scaled experimental test set-up. Simulations and experimental results show good agreement, where the designed controllers have managed to keep the different controlled signals almost equal to their reference values. Unity power factor and low distortion has been obtained in the flywheel voltage and current. The average efficiency of the driveline during a simple drive cycle has been obtained, being approximately 87%. A theoretical calculation, based on the real parameters of the system, was made, and it showed good agreement with the simulation and experimental results.

2 August 2012 in Energies
Verified
Journal Article
Open access
PDF file
JAJohan Abrahamsson
Johan Abrahamsson
JOJanaina Goncalves de Oliveira
Janaina Goncalves de Oliveira
JSJuan De Santiago
Juan De Santiago
JLJohan Lundin
Johan Lundin
HBHans Bernhoff
Hans Bernhoff
This paper presents experimental results on an innovative electric driveline employing a kinetic energy storage device as energy buffer. A conceptual division of losses in the system was created, separating the complete system into three parts according to their function. This conceptualization of the system yielded a meaningful definition of the concept of efficiency. Additionally, a thorough theoretical framework for the prediction of losses associated with energy storage and transfer in the system was developed. A large number of spin-down tests at varying pressure levels were performed. A separation of the measured data into the different physical processes responsible for power loss was achieved from the corresponding dependence on rotational velocity. This comparison yielded an estimate of the perpendicular resistivity of the stranded copper conductor of 2.5 × 10−8 ± 3.5 × 10−9. Further, power and energy were measured system-wide during operation, and an analysis of the losses was performed. The analytical solution was able to reproduce the measured distribution of losses in the system to an accuracy of 4.7% (95% CI). It was found that the losses attributed to the function of kinetic energy storage in the system amounted to between 45% and 65%, depending on usage.

17 October 2024 in Energies
Verified
Journal Article
Open access
PDF file
ASAndré Fernando Schiochet
André Fernando Schiochet
PMPaulo Roberto Duailibe Duailibe Duailibe Monteiro
Paulo Roberto Duailibe Duailibe Duailibe Monteiro
TBThiago Trezza Borges
Thiago Trezza Borges
JFJoão Alberto Passos Filho
João Alberto Passos Filho
JOJanaina Goncalves de Oliveira
Janaina Goncalves de Oliveira
The growing integration of renewable energy sources, such as photovoltaic and wind systems, into energy grids has underscored the need for reliable control mechanisms to mitigate the inherent intermittency of these sources. According to the Brazilian grid operator (ONS), there have been cascading disconnections in renewable energy distributed systems (REDs) in recent years, highlighting the need for robust control models. This article addresses this issue by presenting the validation of an active power ramp rate control (PRRC) function for a PV plant coupled with a Battery Energy Storage System (BESS) using WECC generic models. The proposed model underwent rigorous validation over an extended analysis period, demonstrating good accuracy using the Root Mean Squared Error (RMSE) and an R-squared (R2) metrics for the active power injected at the Point of Connection (POI), PV active power, and BESS State of Charge (SOC), providing valuable insights for medium and long-term analyses. The ramp rate control module was implemented within the plant power controller (PPC), leveraging second-generation Renewable Energy Systems (RES) models developed by the Western Electricity Coordination Council (WECC) as a foundational framework. We conducted simulations using the Anatem software, comparing the results with real-world data collected at 100 ms to 1000 ms intervals from a PV plant equipped with a BESS in Brazil. The proposed model underwent rigorous validation over an extended analysis period, with the presented results based on two days of measurements. The positive sequence model used to represent this control demonstrated good accuracy, as confirmed by metrics such as the Root Mean Squared Error (RMSE) and R-squared (R2). Furthermore, the article underscores the critical role of accurately accounting for the power sampling rate when calculating the ramp rate.