In this study, the amount of calcite precipitate resulting from microbially induced calcite precipitation (MICP) was estimated in order to determine the optimal conditions for precipitation. Two microbial species (Staphylococcus saprophyticus and Sporosarcina pasteurii) were tested by varying certain parameters such as (1) initial potential of hydrogen (pH) of urea-CaCl2 medium, (2) temperature during precipitation, and (3) the reaction duration. The pH values used for testing were 6, 7, 8, 9, and 10, the temperatures were 20, 30, 40, and 50 °C, and the reaction durations were 2, 3, and 4 days. Maximum calcite precipitation was observed at a pH of 7 and temperature of 30 °C. Most of the precipitation occurred within a reaction duration of 3 days. Under similar conditions, the amount of calcite precipitated by S. saprophyticus was estimated to be five times more than that by S. pasteurii. Both the species were sensitive to temperature; however, S. saprophyticus was less sensitive to pH and required a shorter reaction duration than S. pasteurii.
Electrical contractors encounter problems such as limited construction sites, schedule interference, and inefficient communication with other contractors when they typically subcontract with general contractors. Electrical projects require effective and systematic project management strategies to overcome these problems and achieve the desired goal. In an electrical construction project, individual tasks are interconnected at different stages, including pre-construction planning (PCP) and project execution (PE). Therefore, analyzing the effect of task strings on the project success in terms of schedule and cost performance is necessary. The main objective of this study is to perform a static analysis to compare successful and failed projects with a focus on the cost and schedule performances, using the PCP and PE task strings in electrical construction projects. To achieve this, a continuous PCP-PE task strings implementation score was calculated for each PE group in terms of cost and schedule, and successful and failed projects on unweighted and weighted values were compared and analyzed by performing an independent sample t-test. Consequently, it was confirmed that the use of most task strings had a positive effect on the cost success at a confidence level of 95%, and that only the subcontractor management group had a positive effect on the schedule success. Hence, it was derived that the usage of task strings for these groups is recommended for cost success in electrical construction, and continuous PCP-PE task strings do not have a positive effect on schedule success; therefore, it is recommended to use the PCP-PE task strings only for specific groups for schedule success in electrical construction. Demonstrating the relationship between the PCP and PE tasks, the findings of this study are expected to help electrical contractors achieve a better performance using effective project management strategies.
This study discusses the seismic behavior of a geometrically asymmetric three-storey reinforced concrete (RC) building, considering torsional effect and material nonlinearity. The building is a test structure that was used for seismic performance evaluation in the SMART 2013 (Seismic design and best-estimate Methods Assessment for Reinforced concrete buildings subjected to Torsion and nonlinear effects) international benchmark. To begin with, nonlinear stress–strain relationships that were set up for concrete and reinforcing steel are validated by finite element local tests with a representative volume element. A modal analysis shows that the first three calculated natural frequencies are close to the ones that are obtained by modal experiments. The finite element modeling is further validated by comparing the calculated displacement and acceleration due to a low-intensity ground motion with the responses from the corresponding shaking table test. Using the validated model, a blind nonlinear seismic analysis is performed for a series of Northridge earthquakes in order to estimate the behavior of the asymmetric RC structure to high-intensity ground motions. The calculated displacement and acceleration, as well as their response spectra at various sampling points, agree well with the results of a three-dimensional benchmark shaking table test. By investigating the seismic torsional behavior of the asymmetric RC structure, it is shown that the seismic response of an asymmetric structure is larger than that of a hypothetical symmetric structure. The result indicates that a larger seismic response should be considered in the seismic design of an asymmetric structure compared to a symmetric structure with similar design conditions.
In recent years, the increasing gap between available funding and preservation needs has influenced district pavement engineers to select and prioritize projects to effectively use funding. However, currently, projects are often selected after an informal assessment, based on local conditions and local district engineers’ experience, in the absence of a statewide systematic process. The primary objective of this study is to determine network-level project sections for effective sustainable pavement management using logistic regression analysis. A large volume of inventory data, documented using pavement-management information systems (PMIS), was used to develop the logistic regression (LR) model for selecting candidate sections. The LR model was subsequently validated using a single 50/50 split sample method. The findings of this study will assist the Austin, Texas, USA district to select and evaluate candidate projects. Furthermore, the study will eventually contribute to improved efficiency in project selection and prioritization by reducing not only the amount of time necessary to review the district PMIS data to identify project candidates, but also the potential for human error.
Composite bridges are typically exposed to temperature variations due to heat radiation, conduction, and convection. Temperature affects the modal parameters of bridges, hindering the application of damage detection methods based on the dynamic properties of bridges. In this study, the effects of temperature on the natural frequencies of composite bridges were investigated experimentally and numerically to derive a basis for separating temperature effects from the natural frequencies. A temperature-controllable girder specimen was developed for modal testing. Additionally, finite element (FE) analysis was conducted to analyze the effects of temperature. The FE analysis results were validated by comparing them to the static response results of the test specimen. The results of the experiments and FE simulations verified that temperature variation can affect the material properties, particularly the modulus of elasticity, of a composite girder, consequently influencing its natural frequency. Based on the tests and simulations, a linear relationship between the temperature and the natural frequency was proposed to remove the temperature effects from the natural frequency.
Preventing rebar corrosion in reinforced concrete (RC) structures has been actively researched worldwide. One of the most powerful solutions is the use of fiber-reinforced polymer (FRP) rebars. However, there are limitations in the mechanical design and construction of FRP rebars because their tensile characteristics are extremely different from those of conventional rebars and they have a different modulus of elasticity. FRP rebars are relatively cost-efficient when fabricated with glass fibers, but they are still costly compared to conventional rebars. Therefore, hybrid rebars fabricated by covering conventional rebars with glass FRP (GFRP) materials were developed in this study. GFRP hybrid rebars have increased durability in marine environments while maintaining the same mechanical properties as conventional rebars. As the difference in rebar diameter of the bonded area decreased, the tensile strength of the concrete increased. As a result, pull-out failure or tensile failure caused by the yielding of the rebars occurred in small-diameter rebars. The experimental results showed that the maximum load for the D13 deformed steel bar was 52.2 kN at a bond length of 50 mm and 76.1 kN at 100 mm, while for the D19 deformed steel bar, it was 65.3 kN at 50 mm and 103.7 kN at 100 mm. The bond properties of hybrid GFRB rebars were found to be lower than those of deformed steel bars. These properties were improved greatly by increasing the thickness of the GFRP materials on the surface of the deformed steel bars, highlighting a path toward high-performance, corrosion-resistant concrete.
About Me
Janghwan Kim is a professor at the Department of Civil Engineering, Kangwon National University, in South Korea.
Janghwan Kim is a professor at the Department of Civil Engineering, Kangwon National University, in South Korea.