Jorge Ferreira

Dr. Jorge Ferreira


Research Focus & Metrics

Academic Career Length

35Years (1992-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 February 2020 in Applied Energy
Verified
Journal Article
Closed access
PCPedro Carneiro
Pedro Carneiro
Marco P. Soares dos SantosMarco P. Soares dos Santos
Marco P. Soares dos Santos
ARAndré Rodrigues
André Rodrigues
JFJorge Ferreira
Jorge Ferreira
JSJosé A.O. Simões
José A.O. Simões
Andrei KholkinAndrei Kholkin
Andrei Kholkin

4 January 2016 in Scientific Reports
Verified
Journal Article
Open access
PDF file
Marco P. Soares dos SantosMarco P. Soares dos Santos
Marco P. Soares dos Santos
JFJorge Ferreira
Jorge Ferreira
JSJosé A. O. Simões
José A. O. Simões
RPRicardo Pascoal
Ricardo Pascoal
JTJoão Torrão
João Torrão
EFEdward P. Furlani
Edward P. Furlani
Magnetic levitation has been used to implement low-cost and maintenance-free electromagnetic energy harvesting. The ability of levitation-based harvesting systems to operate autonomously for long periods of time makes them well-suited for self-powering a broad range of technologies. In this paper, a combined theoretical and experimental study is presented of a harvester configuration that utilizes the motion of a levitated hard-magnetic element to generate electrical power. A semi-analytical, non-linear model is introduced that enables accurate and efficient analysis of energy transduction. The model predicts the transient and steady-state response of the harvester a function of its motion (amplitude and frequency) and load impedance. Very good agreement is obtained between simulation and experiment with energy errors lower than 14.15% (mean absolute percentage error of 6.02%) and cross-correlations higher than 86%. The model provides unique insight into fundamental mechanisms of energy transduction and enables the geometric optimization of harvesters prior to fabrication and the rational design of intelligent energy harvesters.

1 December 2018 in Materials Today
Verified
Journal Article
Closed access
JTJoão P.G. Tarelho
João P.G. Tarelho
Marco P. Soares dos SantosMarco P. Soares dos Santos
Marco P. Soares dos Santos
JFJorge Ferreira
Jorge Ferreira
António Manuel de Amaral RamosAntónio Manuel de Amaral Ramos
António Manuel de Amaral Ramos
SKSvitlana Kopyl
Svitlana Kopyl
Andrei KholkinAndrei Kholkin
Andrei Kholkin

1 December 2011 in Sensors and Actuators A: Physical
Verified
Journal Article
Closed access
Raul MoraisRaul Morais
Raul Morais
NSNuno Miguel dos Santos Pinto da Silva
Nuno Miguel dos Santos Pinto da Silva
PSPaulo M. Santos
Paulo M. Santos
CFClara M. Frias
Clara M. Frias
JFJorge Ferreira
Jorge Ferreira
Manuel José Cabral dos Santos ReisManuel José Cabral dos Santos Reis
Manuel José Cabral dos Santos Reis

1 December 2011
Verified
Conference Paper
Closed access
SPSubodh Paudel
Subodh Paudel
JSJ. N. Shrestha
J. N. Shrestha
FSFernando José Neto Silva
Fernando José Neto Silva
JFJorge Ferreira
Jorge Ferreira
MAMuna Adhikari
Muna Adhikari
The rapid depletion of fossil fuel resources and environmental concerns has given awareness on generation of renewable energy resources. Among the various renewable resources, hybrid solar and wind energy seems to be promising solutions to provide reliable power supply with improved system efficiency and reduced storage requirements for stand-alone applications. This paper presents a feasibility assessment and optimum size of photovoltaic (PV) array, wind turbine and battery bank for a standalone hybrid Solar/Wind Power system (HSWPS) at remote telecom station of Nepal at Latitude (27°23'50") and Longitude (86°44'23") consisting a telecommunication load of Very Small Aperture Terminal (VSAT), Repeater station and Code Division Multiple Access Base Transceiver Station (CDMA 2C10 BTS). In any RES based system, the feasibility assessment is considered as the first step analysis. In this work, feasibility analysis is carried through hybrid optimization model for electric renewables (HOMER) and mathematical models were implemented in the MATLAB environment to perform the optimal configuration for a given load and a desired loss of power supply probability (LPSP) from a set of systems components with the lowest value of cost function defined in terms of reliability and levelized unit electricity cost (LUCE). The simulation results for the existing and the proposed models are compared. The simulation results shows that existing architecture consisting of 6.12 kW KC85T photovoltaic modules, 1kW H3.1 wind turbine and 1600 Ah GFM-800 battery bank have a 36.6% of unmet load during a year. On the other hand, the proposed system includes 1kW *2 H3.1 Wind turbine, 8.05 kW TSM-175DA01 photovoltaic modules and 1125 Ah T-105 battery bank with system reliability of 99.99% with a significant cost reduction as well as reliable energy production.

1 October 2013 in Journal of Biomechanics
Verified
Journal Article
Closed access
Marco P. Soares dos SantosMarco P. Soares dos Santos
Marco P. Soares dos Santos
JFJorge Ferreira
Jorge Ferreira
António Manuel de Amaral RamosAntónio Manuel de Amaral Ramos
António Manuel de Amaral Ramos
JSJosé A.O. Simões
José A.O. Simões
Raul MoraisRaul Morais
Raul Morais
TOT. Oliveira
T. Oliveira