Bartłomiej Sroka

Dr. Bartłomiej Sroka


Research Focus & Metrics

Academic Career Length

11Years (2016-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
25 March 2020 in Energies
Verified
Journal Article
Open access
PDF file
Małgorzata Fedorczak-CisakMałgorzata Fedorczak-Cisak
Małgorzata Fedorczak-Cisak
AKAnna Kotowicz
Anna Kotowicz
Elżbieta Radziszewska-ZielinaElżbieta Radziszewska-Zielina
Elżbieta Radziszewska-Zielina
BSBartłomiej Sroka
Bartłomiej Sroka
TTTadeusz Tatara
Tadeusz Tatara
KBKrzysztof Barnaś
Krzysztof Barnaś
The Directive 2010/31/EU on the energy performance of buildings has introduced the standard of “nearly zero-energy buildings” (NZEBs). European requirements place the obligation to reduce energy consumption on all European Union Member States, particularly in sectors with significant energy consumption indicators. Construction is one such sector, as it is responsible for around 40% of overall energy consumption. Apart from a building’s mass and its material and installation solutions, its energy consumption is also affected by its placement relative to other buildings. A proper urban layout can also lead to a reduction in project development and occupancy costs. The goal of this article is to present a method of optimising single-family house complexes that takes elements such as direct construction costs, construction site organisation, urban layout and occupancy costs into consideration in the context of sustainability. Its authors have analysed different proposals of the placement of 40 NZEBs relative to each other and have carried out a multi-criteria analysis of the complex, determining optimal solutions that are compliant with the precepts of sustainability. The results indicated that the layout composed of semi-detached houses scored the highest among the proposed layouts under the parameter weights set by the developer. This layout also scored the highest when parameter weights were uniformly distributed during a test simulation.

7 April 2021 in Archives of Civil and Mechanical Engineering
Verified
Journal Article
Open access
PDF file
BSBartłomiej Sroka
Bartłomiej Sroka
Jerzy RosłonJerzy Rosłon
Jerzy Rosłon
MPMichał Podolski
Michał Podolski
WBWojciech Bożejko
Wojciech Bożejko
Anna BurdukAnna Burduk
Anna Burduk
MWMieczysław Wodecki
Mieczysław Wodecki
The article presents the profit optimization model for multi-unit construction projects. Such projects constitute a special case of repetitive projects and are common in residential, commercial, and industrial construction projects. Due to the specific character of construction works, schedules of such projects should take into account many different aspects, including durations and costs of construction works, the possibility of selecting alternative execution modes, and specific restrictions (e.g., deadlines for the completion of units imposed by the investor). To solve the NP-hard problem of choosing the order of units’ construction and the best variants of works, the authors used metaheuristic algorithms (simulated annealing and genetic search). The objective function in the presented optimization model was the total profit of the contractor determined on the basis of the mathematical programming model. This model takes into account monthly cash flows subject to direct and indirect costs, penalties for missing deadlines, costs of work group discontinuities, and borrowing losses. The presented problem is very important for maintaining a good financial condition of the enterprise carrying out construction projects. In the article, an experimental analysis of the proposed method of solving the optimization task was carried out in a model that showed high efficiency in obtaining suboptimal solutions. In addition, the operation of the proposed model has been presented on a calculation example. The results obtained in it are fully satisfying.

16 September 2019 in JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT
Verified
Journal Article
Open access
MPMichał Podolski
Michał Podolski
BSBartłomiej Sroka
Bartłomiej Sroka
The article presents the cost optimization model for multiunit construction projects. Multiunit projects constitute a special case of repetitive projects. They consist in the realization of many different, when it comes to size, types of residential, commercial, industrial buildings or engineering structures. Due to the specific character of construction works, actual schedules of such projects should not only take into account real costs of construction, but also be subject to specific restrictions, e.g. deadlines for the completion of units imposed by the investor. To solve the NP-hard problem of choosing the order of units’ construction there was metaheuristic algorithm of simulated annealing used. The objective function in the presented optimization model was the total value of the project cost determined on the basis of the mathematical programming model, taking into account direct and indirect costs, costs of missing deadlines and costs of work group discontinuities. In the article, an experimental analysis of the proposed method of solving the optimization task was carried out in a model that showed high efficiency in obtaining suboptimal solutions. In addition, the operation of the proposed model has been presented on a calculation example. The results obtained in it are fully satisfying.

1 June 2019 in Archives of Civil Engineering
Verified
Journal Article
Open access
PDF file
Elżbieta Radziszewska-ZielinaElżbieta Radziszewska-Zielina
Elżbieta Radziszewska-Zielina
GŚGrzegorz Śladowski
Grzegorz Śladowski
EKE. Kania
E. Kania
BSBartłomiej Sroka
Bartłomiej Sroka
BSBartłomiej Szewczyk
Bartłomiej Szewczyk
Construction projects are characterised by complexity in the technical, organisational and environmental sphere. The organisational complexity of such projects makes it necessary to manage relationships between actors who fulfil various functions. Formal organisational structures that have been developed for this purpose do not always reflect the actual relationships between construction project participants. In literature, scholars more and more often point to the need to identify and monitor such informal relationships and attempt to manage them in order to effectively carry out projects. Structural analysis of so-called self-organising networks of relationships between project participants is carried out on the basis of established structural measures by performing Social Network Analysis (SNA). In a situation when inappropriate communication between project participants relative to management staff expectations is detected, interventions meant to improve communication in such networks are possible. The goal of the article is proposing an optimisation-oriented approach to planning such interventions while taking various constraints, such as communication costs, into consideration. As a part of this optimisation, the authors proposed a method from the heuristic methods group. This solution will support decision-making in terms of intervening within an informal relationship structure. The method was presented on the example of an actual construction project involving the construction of a complex of housing buildings. the self-organising network structure was defined on the basis of a survey carried out among the project’s participants and concerned communication between them over a four-week period. As a result of the structural network analysis, abnormalities in communication between project participants were detected. The optimisation method developed by the authors pointed to possibilities of improving communication effectiveness within this network. The effects of the analysis confirmed the application potential of the method that was presented.

24 June 2021 in Archives of Civil Engineering
Verified
Journal Article
Open access
PDF file
EKEwelina Kania
Ewelina Kania
GŚGrzegorz Śladowski
Grzegorz Śladowski
Elżbieta Radziszewska-ZielinaElżbieta Radziszewska-Zielina
Elżbieta Radziszewska-Zielina
BSBartłomiej Sroka
Bartłomiej Sroka
BSBartłomiej Szewczyk
Bartłomiej Szewczyk
In the literature, researchers present construction projects as temporary self-organising coalition networks, composed of specialist entities that work towards set goals. The number of parties involved in the various processes during construction causes communications relations to be exceedingly complex and to change. The environment of a construction project is dynamic and complex, and self-organising communication networks are sensitive to institutional and social change. It becomes necessary to identify situations rooted in both insufficient communication during the carrying out of a project and its excess, which generates unnecessary cost. Effective control of information flow within self-organising communication networks through its planning and monitoring by project management can contribute to achieving project goals. This paper presents a proposal of an optimisation approach (in terms of minimising communication costs) to information flow planning that accounts for various constraints, on the example of a real-world case of building a housing complex in Poland.

26 December 2018 in Open Engineering
Verified
Journal Article
Open access
PDF file
ERElżbieta Radziszewska-Zielina
Elżbieta Radziszewska-Zielina
BSBartłomiej Sroka
Bartłomiej Sroka
Recently, there has been a growing number of construction projects that require more than one structure to be built - repetitive construction projects. These repetitive construction projects are characterized by a high degree of complexity both in terms of organisational and technological dependencies. A method is needed that will flexibly take into account the technological constraints that occur during the carrying out of repetitive construction projects. The article presents a method of priority scheduling that takes into account technological pauses that can prove useful in the planning of repetitive construction projects. The planner (usually a construction site manager) will be able to model the technological constraints occurring on the construction site in a more flexible way. The article also presents a calculation example in which the application of the developed model has been presented. The developed model proved to be effective in scheduling repetitive construction projects, taking into account technological constraints.