Localization in indoor built environments has considerable importance for the architecture, engineering, and construction industry. It has various use cases, including building occupancy detection, automated asset tracking in construction sites, supporting facility maintenance and operations, and guiding people in building emergency response operations. Although some initial studies examining the usability of Bluetooth Low Energy (BLE) for indoor localization exist in the literature, there is still a gap for a comprehensive analysis that will lead to the establishment of a widely accepted BLE-based localization framework. Whereas existing studies mainly focus on radio signal properties and use only spatial accuracy and precision as their evaluation criteria, this study determines the technological viability of BLE through predetermined guidance parameters such as human body orientation, number of data collection points, number of real-time received signal strength index (RSSI) data samples, and fingerprinting creation approaches. In order to determine the viability of BLE-based localization, multiple field experiments are carried out in the building of a research center. Location fingerprinting method is used as the wireless localization technique and the -nearest neighbor algorithm is used to assess the feasibility of BLE technology for indoor localization. The results of the field experiments show that BLE technology can be used as a reliable solution for indoor localization because it gives better accuracy and precision results than existing approaches in the industry.
The promotion of uptake of building information modelling (BIM) and circular economy (CE) in the UK and Turkiye construction sectors can be enhanced with the addition of AI. Thus, AI-enabled BIM and CE must be addressed from the viewpoint of current practices and capabilities. This study conducted a comparative study of capability maturity modelling (CMM) backed by a state-of-the-art (SOTA) review of 24 peer-reviewed publications via a validatory approach using a focus group webinar of eight experts in the UK and Turkiye. The findings, as extracted through a validated CMM framework of seven dimensions, were used to identify the position of the UK and Turkiye in terms of AI in BIM and CE. It was discovered that the UK is in a position regarding adoption, government policies and incentives at a defined level. AI growth is required in terms of technological advancement, education and training, industry readiness, cultural attitudes and resistance because they are in a managed phase. It was confirmed that Turkiye is at the initial stage of AI adoption, education, training, incentives, policies, technology and cultural attitudes. The originality of this study lies in the recommendations for a 10-year CMM adoption timeframe towards an optimised level. The conclusions of this manuscript will influence government, education, research and technological policies in the UK and Turkiye.
22 June 2021 in Intelligent Buildings International
In the last two decades, automation systems have shown advanced developments and are widely adopted for various purposes in many fields. However, automation in buildings has not gained popularity and has a low acceptance level amongst the occupants. Decreased perceived control, ever-changing dynamic human needs, and standardized, one-size-fits-all approach in current automation systems lead to disharmony in human-machine coexistence. Although well-established continuous interaction between building control systems and occupants is acknowledged as one of the core elements of intelligent buildings, defined borderlines of the prevailing automation modalities fail to satisfy this primary feature. This research proposes a conceptual mixed-initiative building control framework enhancing collaboration and communication between building occupants and the automation. Through benefiting from both the control capacity of computer-powered methods and flexibility granted by incorporating occupants in the loop, demonstrated framework components may enact concurrent assessment of occupant comfort and energy efficiency while making automated applications more favorable for building inhabitants.
29 July 2025 in Gazi University Journal of Science
Building Information Modelling (BIM) is a technology that allows data generated by different disciplines using different software to be shared and used in a digital environment. By promising bi-directional data integration between all stakeholders, BIM encourages interoperability in the industry. This study aims to assess the operability and reliability of bidirectional data exchange methods within BIM technology, specifically Industry Foundation Classes (IFC) and Application Programming Interface (API). The study tests these methods between the architecture and structural engineering disciplines using Autodesk Revit along with the structural software packages: ETABS, Robot Structural Analysis, SAP2000, and Tekla Structures. The results show that the IFC file extension causes data losses in information sharing between software, while the API method can provide reliable data integration between different tools. However, the API only works smoothly between the tools developed by the same company. Nevertheless, API may be a promising way to achieve the interoperability goal of BIM technology.
The briefing is a process to ensure that the project stakeholders work together from inception to completion of construction by implementing knowledge management. Effective and continuous involvement of project stakeholders in the briefing is vital for the success of the process and the project. The level and method of participation differ due to the project delivery method; however, the importance of managing project stakeholders' knowledge and experience always remains the place. This study presents the definition and importance of construction briefing and the place of project stakeholders in the process. Then, the participation of project stakeholders is discussed through an example of an existing construction management process. The main objective is to evaluate the relationship of the decision-making process between the involvement of project stakeholders for different stages of construction projects. Thus, Anka Bilim College Building, in which the involvement of project stakeholders was ensured from start to completion, was utilized as a case study. Session examples from the briefing records, kept by the architect from the design phase to the completion of construction, are presented and evaluated as sessions in time order. The evaluation and discussion were made by exploring the sessions' descriptive information. For an important finding, it can be said that the continuous participation of project stakeholders in briefing processes provides a basis for making the right decision with the help of their knowledge, and experience. Examples of situations where issues and problems can be addressed and decisions made more realistically and accurately when contractual and working relationships and project stakeholders are involved in all processes. However, for construction projects, the participation of all project stakeholders in the briefing processes may not be ensured due to the implementation method of the project.