Xinyan Guo

Dr. Xinyan Guo

orcid

Research Focus & Metrics

Academic Career Length

8Years (2019-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
25 October 2019 in Water
Verified
Journal Article
Open access
PDF file
Wei GeWei Ge
Wei Ge
YJYutie Jiao
Yutie Jiao
HSHeqiang Sun
Heqiang Sun
ZLZongkun Li
Zongkun Li
HZHexiang Zhang
Hexiang Zhang
Pieter Van GelderPieter Van Gelder
Pieter Van Gelder
Dam breach has catastrophic consequences for human lives and economy. In previous studies, empirical models are often, to a limited extent, due to the inadequacy of historical dam breach events. Physical models, which focus on simulating human behavior during floods, are not suitable for fast analysis of a large number of dams due to the complexities of many key parameters. Therefore, this paper proposes a method for fast evaluation of potential consequences of dam breach. Eight main indices, i.e., capacity of reservoir (CR), dam height (HD), population at risk (PR), economy at risk (ER), understanding of dam breach (UB), industry type (TI), warning time (TW), and building vulnerability (VB), are selected to establish an evaluation index system. A catastrophe evaluation method is introduced to establish an evaluation model for potential consequences of dam breach based on the indices which are divided into five grades according to the relevant standards and guidelines. Validation of the method by twelve historical dam breach events shows a good accuracy. The method is applied to evaluate potential consequences of dam breach of Jiangang Reservoir in Henan Province, China. It is estimated that loss of life in the worst scenario is between that of Hengjiang Reservoir and that of Shimantan Reservoir dam breach, of which fatalities are 941 and 2717, respectively, showing that risk management measures should be taken to reduce the risk of potential loss of life.

27 June 2025 in Applied Sciences
Verified
Journal Article
Open access
PDF file
XGXinyan Guo
Xinyan Guo
ZLZongkun Li
Zongkun Li
Wei GeWei Ge
Wei Ge
FMFuheng Ma
Fuheng Ma
Yadong ZhangYadong Zhang
Yadong Zhang
JWJian-you Wang
Jian-you Wang
Probabilistic analysis of overtopping is an important aspect of dam construction, and the uncertainty in the construction progress complicates the calculation of overtopping probabilities. Construction progress is significantly influenced by human factors, making it difficult to assign an accurate probability distribution. Although the interval non-probabilistic reliability (INPR) method can estimate the likelihood of events with unknown probability distributions, its calculation results for the overtopping probability have significant errors. To improve the rationality of the results, we developed a method that adopted flood frequency of the upstream flood level to correct the traditional INPR calculations, developing an improved model. Taking the Qianping Reservoir as an example, the overtopping probabilities for three construction schedules were calculated, and the results were compared with a flood routing calculation. The results indicated that the improved approach significantly improves the rationality of the calculations, and the results effectively reflected the impact of construction progress uncertainty on overtopping probabilities.