The embedded through-section (ETS) technique is a promising method for fiber-reinforced polymer (FRP)-strengthening reinforced concrete (RC) structures, offering higher bond resistance and reduced surface preparation compared to externally bonded or near-surface mounted FRP systems. A common failure in ETS applications is debonding at the FRP bar-to-concrete interface. However, current design standards often assume uniform bond stress and lack predictive models that account for debonding propagation and its effect on load capacity. Furthermore, a detailed analysis of interfacial stress development, including debonding initiation and progression along varying bond lengths, remains limited. To address these gaps, this study introduces an analytical model that describes the complete debonding process in ETS FRP bar-to-concrete joints, incorporating both long and short bond lengths and frictional effects. Based on a trilinear cohesive material law (CML), closed-form expressions are deduced for the load–slip response, maximum load, interfacial shear stress and strain distribution along the FRP bar. The proposed model is validated experimentally through pull-out tests on glass FRP (GFRP) bars adhesively bonded to concrete with different strength grades. The results show that the analytical predictions agree well with both the self-conducted experimental data for short joints and existing test results for long joints given in the literature. Therefore, the developed design-oriented solution enables accurate evaluation of the actual contribution of ETS FRP reinforcement to RC members by explicitly modeling debonding behavior. This provides a rigorous and mechanics-based tool for performance-based design of ETS FRP-to-concrete joints, addressing a critical gap in the future refinement of current design standards.
The conventional double-sidewall pilot tunnelling method (CDWM) has been widely applied in the construction of large-span tunnels. However, when applied to shallow-buried tunnels in weak surrounding rock, the method often suffers from excessive deformation and complex support conversion. To address these limitations, this study proposes an optimized excavation scheme, namely the double-sidewall pilot tunnelling method with reserved rock walls (DRWM). The Yangjiashan Tunnel in Zhejiang Province, China, was selected as the engineering case for investigation. Field monitoring data and numerical simulations were integrated to evaluate the deformation behaviour and structural response of the tunnel during excavation. The results indicate that DRWM significantly improves deformation control compared with the conventional CDWM. The maximum crown settlement and horizontal convergence were effectively reduced, and stress concentration in the initial support structure was mitigated. Furthermore, a sensitivity analysis was conducted to investigate the influence of the lateral distance between the temporary support and the reserved rock wall. Within the investigated single-parameter analysis, a spacing of 0.4–0.5 m showed a relatively balanced response in terms of crown settlement, horizontal convergence, support stress, and construction operability. The findings demonstrate that, under the investigated Grade V weak rock conditions, the DRWM showed improved deformation control compared with the CDWM in the numerical comparison, highlighting its potential applicability for optimization in comparable engineering settings.
Ancient town tourism has become an important component of cultural tourism in China. However, rapid tourism growth has intensified differences in the use of public spaces between residents and tourists, leading to increasing spatial tensions in historic urban areas. This study evaluates public building spaces in ancient towns from the perspectives of residents and tourists and identifies their differentiated needs. Three representative ancient towns in Fujian Province, China, with different tourism resource types and development characteristics, were selected as case studies. The IPA–KANO approach was used to examine differences in user perceptions and priority needs. Based on a literature review, an evaluation system was developed with three dimensions: traditional style, sensory experience, and supporting facilities. The results reveal clear resident–tourist differences in public space priorities and show that these differences vary across ancient towns with different tourism development contexts. Residents place greater emphasis on the maintenance of the environment and facilities and on everyday usability, whereas tourists are more sensitive to public toilet settings and sun and rain shelter facilities. These findings indicate that resident–tourist divergence is context dependent rather than fixed and provide a basis for differentiated spatial optimization and sustainable management.
The building sector accounts for approximately 37% of global energy-related carbon emissions, and as operational efficiency improves, the share attributable to embodied carbon continues to grow. Mass timber has emerged as a promising structural alternative because of its lower embodied carbon, biogenic carbon storage, and potential to accelerate construction schedules. However, construction-stage energy use (A5) is often oversimplified in building life-cycle assessment, with previous studies frequently approximating it as a fixed percentage (~3%) of total embodied energy rather than explicitly inventorying on-site activities. To address this gap, this study develops a dual-track framework for quantifying A5 energy use, combining a theoretical lower bound with a schedule-based upper bound and Monte Carlo uncertainty analysis. The framework is applied to two completed large-scale mass timber projects in the U.S. Midwest and extended to functionally equivalent reinforced concrete (RC) and structural steel alternatives. Results show that temporary heating dominates A5 energy use (52–60%), while mechanical fastener installation contributes less than 0.2%. Compared with functionally equivalent alternatives, mass timber achieves 30–50% lower A5 energy use than RC and approximately 12% lower A5 energy use than structural steel. In addition, a 44% learning-curve productivity improvement in cross-laminated timber (CLT) installation suggests further potential for reducing construction-stage carbon emissions. External validation using Baker Place, another completed mass timber project, confirms the transferability of the methodology, with prediction errors below 10% for the steel and timber systems. These findings indicate that A5 energy use has been substantially oversimplified in previous studies and that the proposed framework provides a systematic method for evaluating construction-stage energy impacts.