Purpose is to determine a function of the reduced expenditures connected with drilling-and-blasting operations, loading and hauling operations, and rock fragmentation depending upon the cost of machine-shift of the applied facility, its operation modes, hardness of rock being blasted, cost of the used explosive, and rock fragmentation quality based upon the developed optimization mathematical model. Methods. Method of statistical evaluation of natural blockiness structure of the rock as well as quality of its fragmentation by means of explosive energy has been applied. Statistical studies have been carried out concerning the basic indices of rock fragmentation depending upon its largeness and block hardness. Purposely-designed experimental equipment has been applied for sampling analysis of the rock fracturing in the process of its drilling by means of rotary drilling rig. The abovementioned supported representativeness of the sampling. Findings. Statistical distributions of the rock blockiness structure in terms of each bar length involving its place within the drilling assembly as well as in terms of the well depth have been compiled. Visual comparison of experimental data and theoretical data has helped determine that the statistical distributions of natural blockiness structure of the rock have the closest correlation with gamma distribution which differential function has two positive parameters. Statistical dependence has been defined between drilling-and-blasting results and the total expenditures connected with hard rock mining. Originality. A concept of oversize crushing coefficient has been introduced; its statistical dependence upon the mined rock hardness and specific consumption of the applied explosive has been derived. An alternative has been proposed concerning changes in parameters of the differential function of the assumed gamma distribution relative to the predicted granulometric composition of rock mass. Practical implications. Economic and mathematical model has been developed involving a target function of the total expenditures connected with the listed operations as well as a set of constraints avoiding incorrect decisions. The optimization method makes it possible to control drilling-and-blasting parameters at each stage of hard rock mining.
25 December 2022 in Naukovyi Visnyk Natsionalnoho Hirnychoho Universytetu
Purpose. To establish the feasibility of refining deep open-pit mines below the boundary of the use of combined motor-conveyor transport with an increased slope angles of the pit walls using the developed transport unit for reloading rocks to overlying horizons during the reactivation of pillars under transport berms. Methodology. Preparation of a digital block model of the deposit, the elaboration of 3D geomechanical models for the dynamics of mining, 2D and 3D numerical simulation of the rock stress-strain state of the outcrops of opencast workings, mathematical modeling of stepwise ore reserves and mining schedule, patent research and feasibility study. Findings. It is advisable to carry out mining in terms of the marginal rock state with an increase in the slope of the pit sides below the limit of application of the cyclic and continuous method in ultra-deep open pits. Such design of pit sides is achieved when benches are mined from top to bottom within the boundaries of steeply inclined layers with the use of inter-bench loaders of the developed designed in the completion zone. Provisions for the selection and feasibility of using the loader in the deep zone are formulated based on demarcation of application zones of cyclic (road transport) and cyclic-flow (combined road-conveyor transport) technologies. Originality. Schematization of the mining operation was performed based on the calculated values of safety factor of sides, which allows increasing the slope angles of the pit walls of even ultra-deep open pits in the completion zone. It was found that with deepening of mining, the zones of potential sliding move away from the loose overburden to lower ore benches closer to the final depth of the Kacharsky open pit (760 m), but the safety factor corresponds to the required value according to the design standards. Practical value. An increase in the slope of the pit walls in the completion zone can be achieved using the developed loading installation, the main difference of which is that it can be moved without dismantling under conditions of reactivation of transport pillars (with an increase in lifting height by 1.54.5 times compared to the known equipment).
It is advisable to conduct mining operations in the conditions of the ultimate state of the opened massif with an increase in the pit wall slope angles below the limit of effective use of combined motor-conveyor transport in the cleaning-up zone of deep and ultradeep open pit mines to the final depth. Such a design of the pit walls is achieved when mining benches from top to bottom within the boundaries of steep-slope layers with the use of in-bench loaders in the cleaning-up zone. The conditions for the occurrence of irreversible shear deformations in rock layers and the position of the potential sliding surface with an increase in the pit walls slope angle of steeply inclined layers in the conditions of the ultra-deep Kachar iron ore open pit mine to critical values are established. It is advisable to use skips as the load-carrying body of the in-bench loader, the design of the supports of which allows it to be built with a lifting height of more than 30 m with the possibility of moving along the pit wall with variable berm elevations. The main provisions on the selection and justification of the expediency of using a loading device for operation in the deep zone are formulated based on the differentiation of the application zones of cyclic (motor transport) and cyclic and continuous method (combined motor-conveyor transport). In particular, the total costs of transporting rock mass according to the new scheme of combined in-pit transport with the use of a loading device for operation in the deep zone should be less than the costs of transportation according to existing or traditional schemes.
30 August 2024 in Naukovyi Visnyk Natsionalnoho Hirnychoho Universytetu
Purpose. To create a device for weighing mining rock loaded into the body of a dump truck after each cycle of its excavation. To develop a mathematical block for calculating the net mass of the rock without taking into account extraneous factors affecting the accuracy of the obtained result. To provide operational control of the nominal load of the dump truck by the driver and excavator operator. Methodology. The methodological basis for solving the task is a comprehensive approach which includes electronic modeling of technical processes, methods of mathematical statistics, analysis of results in a mathematical package and their applied application. Findings. A functional and principled electrical diagram of the device for weighing the mining rock loaded into the body of a dump truck and transferring the final information to this excavator has been compiled. A mathematical block of the device was created, capable of memorizing the signals received from the primary information sensors before weighing, and subtracting them from the signals received from these sensors after each weighing cycle. As sensors of primary information, it is proposed to use selsyns, which are part of the transformer mode, which are mass-produced by the industry, reliable in operation and easy to maintain. Originality. The proposed device is made at the level of the invention; its priority is determined by the constructive development and technical solution. Namely, the device is equipped with a multistable memory transformer, to the erasing winding of which a tachogenerator (or tachometer generator) is connected through an amplifier, a chain of series-connected trigger, multivibrator waiting and key, whose output is connected to the recording winding of the multistable memory transformer, as well as the transformer connected to the input winding of the multistable memory transformer. Moreover, the storage capacitor is connected to one of the key inputs, and the input windings of the transformer are connected to the weight sensor. Practical value. The use of the presented device allows for operational control of the nominal load of the dump truck, objective accounting of transported cargo and realized labor costs, as well as for applying optimal maintenance of cargo and transport works in quarries. In the future, this device will form the basis of a radio telemetry system for dispatching the operation of dump trucks.
Designing interlevel pillars for deep, structurally complex vein deposits requires balancing rock mass stability against ore recovery. This study evaluates the geomechanical response of the Kenzhem area of the Akbakay gold deposit using a three-dimensional finite-element model that reproduces the lithological structure, irregular ore-body geometry, underground workings, and mined-out stopes. Four extraction scenarios were analyzed: complete extraction without pillars and mining with 10, 15, and 20 m inter-stope pillars. Stability was assessed using maximum total displacement, the extent and connectivity of yielded zones predicted by the generalized Hoek–Brown criterion, and numerical convergence. Pillarless extraction produced displacements of 2.6–3.0 m, a continuous yielded zone extending toward the surface, and loss of numerical convergence. A 10 m pillar reduced displacements to 0.50–0.66 m but did not provide a stable equilibrium state. Increasing the pillar thickness to 15 m reduced the maximum displacement to approximately 0.08 m, localized the yielded zones near excavation boundaries, and ensured convergence. A 20 m pillar produced only a minor additional reduction to 0.065–0.070 m without materially changing the failure pattern. Therefore, a 15 m inter-stope pillar provides the most rational balance between geomechanical safety and ore recovery under the investigated conditions.
Designing interlevel pillars for deep, structurally complex vein deposits requires balancing rock mass stability against ore recovery. This study evaluates the geomechanical response of the Kenzhem area of the Akbakay gold deposit using a three-dimensional finite-element model that reproduces the lithological structure, irregular ore-body geometry, underground workings, and mined-out stopes. Four extraction scenarios were analyzed: complete extraction without pillars and mining with 10, 15, and 20 m inter-stope pillars. Stability was assessed using maximum total displacement, the extent and connectivity of yielded zones predicted by the generalized Hoek–Brown criterion, and numerical convergence. Pillarless extraction produced displacements of 2.6–3.0 m, a continuous yielded zone extending toward the surface, and loss of numerical convergence. A 10 m pillar reduced displacements to 0.50–0.66 m but did not provide a stable equilibrium state. Increasing the pillar thickness to 15 m reduced the maximum displacement to approximately 0.08 m, localized the yielded zones near excavation boundaries, and ensured convergence. A 20 m pillar produced only a minor additional reduction to 0.065–0.070 m without materially changing the failure pattern. Therefore, a 15 m inter-stope pillar provides the most rational balance between geomechanical safety and ore recovery under the investigated conditions.