Rene Prenc

Dr. Rene Prenc

Faculty of Engineering, University of Rijeka, Vukovarska 58, 51000 Rijeka, Croatia
orcid

Research Focus & Metrics

Academic Career Length

14Years (2013-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 December 2013 in International Journal of Electrical Power & Energy Systems
Verified
Journal Article
Closed access
Rene PrencRene Prenc
Rene Prenc
DŠDavor Škrlec
Davor Škrlec
VKVitomir Komen
Vitomir Komen

9 February 2022 in Energies
Verified
Journal Article
Open access
PDF file
Michele RojnićMichele Rojnić
Michele Rojnić
Rene PrencRene Prenc
Rene Prenc
HBHrvoje Bulat
Hrvoje Bulat
Dubravko FrankovićDubravko Franković
Dubravko Franković
The optimization of overcurrent relays’ operation is a topic associated with protection coordination of distribution networks. Usually, this refers to medium-voltage networks, since they are protected by numerical relay devices, as opposed to low-voltage networks, where utility operators allocate fuses. Correct setting of relays and optimal coordination is becoming a serious challenge to Distribution Network Operators around the world, since their networks’ passive operation has been greatly altered in the past two decades. Distributed generation units, a growing liberalized electricity market and more stringent legislation for distribution network planning and operation by state regulatory bodies have all indirectly affected the evolving of protection philosophy for distribution networks. In this paper the traditional optimization problem of overcurrent relay operation will be addressed and critically examined from both a theoretical and practical point of view. Optimization function, constraints and relay parameters will all be observed and compared with solutions used in distribution networks, and their modifications and improvements will be proposed and elaborated in detail.

16 September 2017 in Electrical Engineering
Verified
Journal Article
Closed access
PDF file
ISIvan Strnad
Ivan Strnad
Rene PrencRene Prenc
Rene Prenc

1 April 2018 in Electric Power Systems Research
Verified
Journal Article
Closed access
Rene PrencRene Prenc
Rene Prenc
DVDubravko Vučetić
Dubravko Vučetić
ACAleksandar Cuculić
Aleksandar Cuculić

7 September 2022 in Energies
Verified
Journal Article
Open access
PDF file
Rene PrencRene Prenc
Rene Prenc
Michele RojnićMichele Rojnić
Michele Rojnić
Dubravko FrankovićDubravko Franković
Dubravko Franković
Saša VlahinićSaša Vlahinić
Saša Vlahinić
The goal of this review paper will be to address complex optimization functions in the area of overcurrent relay optimization, to inspect and valorize their objectives and to critically examine their application in real distribution networks. Special emphasis will be put on observing the optimization of discrimination time between primary and backup relay pairs, and methods which prevent the latter becoming penalty functions will be shown. Furthermore, the impact of distributed generation units on the overcurrent relay optimization problem will be elaborated in detail. Protection settings of all the existing and new relays must be thoroughly inspected before the connection of new production units, because contributing fault currents may have a significant effect on the solution of the overcurrent optimization problem. This is because the relays being used are of an inverse-type. Next, meshed network operation will be critically assessed in comparison with the actual practice of radial operation, and some topologies will be highlighted for future research, while others will be discarded. The distribution network in mesh operation implicitly suggests using numerical relays on both sides of protected elements (usually lines), so their total number will be much higher than in radial operation. Finally, a relatively new concept of adaptive distribution network protection will be reviewed, and its potential application to the overcurrent relay optimization problem will be examined. The purpose of this review paper will be to lay a groundwork for future research papers by inspecting the overall development of the overcurrent relay optimization problem for contemporary and future active distribution networks.

1 July 2013
Verified
Conference Paper
Closed access
Rene PrencRene Prenc
Rene Prenc
DŠDavor Škrlec
Davor Škrlec
VKVitomir Komen
Vitomir Komen
For the last five years the Croatian power system has been witnessing a sudden increase in penetration of renewable electrical energy sources. Over the last few decades a combination of some requests has given rise to a greater interest in renewable electrical energy sources worldwide. Some of the afore-mentioned requests are reduction in CO 2 emission, energy efficiency programs, deregulation and opening of electricity sector and markets, diversification of energy sources and increased demands for self-sustainability of national power systems. By acquiring experience with practical examples of renewable sources' integration in distribution networks around the world, a set of new problems have arisen which further complicates distribution network planning and operation. The main problem is the mass integration of non-regulated renewable energy sources in passive designed distribution networks. In this paper the optimal placement of a photovoltaic (PV) power plant in distribution network is discussed with a goal of minimizing active and reactive power losses. PV system and loads are modeled with a characteristic daily electric production/consumption curves with discrete hour intervals, which expands the solution space, but in the same time presents solutions more precisely in accordance to the daily power fluctuations. The source code of the program is realized in Matlab programming environment.