Yanjun QIU

Prof. Yanjun QIU

Civil Engineering, Southwest Jiaotong University, Chengdu, Sichuan, China
orcid

Research Focus & Metrics

Academic Career Length

16Years (2011-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 August 2018 in Journal of Materials in Civil Engineering
Verified
Journal Article
Closed access
SAShaoke An
Shaoke An
CAChangfa Ai
Changfa Ai
Dongya RenDongya Ren
Dongya Ren
ARAli Rahman
Ali Rahman
YQYanjun QIU
Yanjun QIU
The novel cement grout asphalt composite (CGAC) in this study is a new semiflexible composite consisting of open-graded hot mix asphalt (HMA) filled by injecting cement grout materials. The mechanical performance and engineering properties of the composite were evaluated through laboratory tests, including the Marshall stability test, rutting test, three-point bending test, split tensile test, and permeability test. Moreover, field test sections were constructed, and the laboratory test results and in situ results were compared. The results showed that, after grouting, the performance of composite materials was further enhanced, especially their high-temperature stability and moisture sensitivity. In fact, no permanent deformation (rutting) occurred, and the tensile strength ratio (TSR) was increased by 18.7%. In situ test applications revealed that compared with manual grouting, mechanized grouting technology had positive influences on field constructability and performance of CGAC regarding Marshall stability and splitting tensile strength. Findings of this study are beneficial to design, construction technology, and pavement maintenance.

11 March 2023 in Expert Systems with Applications
Verified
Journal Article
Open access
MBMouhamed Bayane Bouraima
Mouhamed Bayane Bouraima
YQYanjun QIU
Yanjun QIU
Željko StevićŽeljko Stević
Željko Stević
DMDragan Marinkovic
Dragan Marinkovic
MDMuhammet Deveci
Muhammet Deveci

11 November 2023 in Computers and Geotechnics
Verified
Journal Article
Closed access
LZLei Zhang
Lei Zhang
XJXin Jiang
Xin Jiang
RSRong Sun
Rong Sun
HGHanyan Gu
Hanyan Gu
YFYongguo Fu
Yongguo Fu
YQYanjun QIU
Yanjun QIU

3 August 2023 in Construction and Building Materials
Verified
Journal Article
Closed access
YZYou Zhan
You Zhan
ZLZhiwei Luo
Zhiwei Luo
XLXiuquan Lin
Xiuquan Lin
ZNZilong Nie
Zilong Nie
QDQiangsheng Deng
Qiangsheng Deng
Tengfei WangTengfei Wang
Tengfei Wang

11 April 2022 in Mathematical Problems in Engineering
Verified
Journal Article
Open access
PDF file
Željko StevićŽeljko Stević
Željko Stević
MBMouhamed Bayane Bouraima
Mouhamed Bayane Bouraima
Marko Miladin SubotićMarko Miladin Subotić
Marko Miladin Subotić
YQYanjun QIU
Yanjun QIU
PBpeter Antwi Buah
peter Antwi Buah
CNChristian Magloire Ndjegwes
Christian Magloire Ndjegwes
Purpose. The purpose of this study is to examine the causes of delays in road construction projects in the Benin Republic from the consultant, client, and contractor perspectives. Design/Methodology/Approach. Through construction project reports, 20 factors that could cause delays in road construction projects were identified. The factors were arranged into a questionnaire, which was distributed to three separate experts. The fuzzy PIPRECIA (PIvot Pairwise RElative Criteria Relevance Assessment) method was used to calculate the independent importance of each delay factor. The Spearman and Pearson correlation coefficients were used to test the methods consistency. Findings. The top five road construction project delays in the Benin Republic, according to the analysis of the 20 factors considered, are project funding, slowness during the client-endorsed payment process, scarcity of professional personnel, delay in indemnifying reimbursement (land-owners), and price escalation. This shows that of the various types of delays, the financial delay group is the most crucial. Originality/value. This study evaluates the causes of delays in road construction projects in the Benin Republic for the first time in literature. This study also examined the top 5 delay factors in road construction projects. This study is based on reports from road construction projects and a performed questionnaire survey. Based on the findings, measures have been formulated to aid project managers to alleviate the road construction delays in the Benin Republic. In addition, this study is practical for both scholars and road construction parties and provides a complete and verifiable analysis of the progress of a road construction project to make it easier and attain a competitive level of time, cost, and quality for successful road construction.

20 June 2013 in Journal of Modern Transportation
Verified
Journal Article
Open access
PDF file
Mingjing FangMingjing Fang
Mingjing Fang
SCSergio Fernández Cerdas
Sergio Fernández Cerdas
YQYanjun QIU
Yanjun QIU
Well-graded asphalt mix with the merits of high sound absorption, low water permeability, excellent strength, and easy construction is an important option for high-speed railway substructures. On the basis of finite element method, a model with conventional ballasted trackbed (T0) and four ballasted trackbeds models with different positions of asphalt layer were analyzed, in which 15 cm thick asphalt layer was used to replace the different sub-track layers, the bottom and the top of upper subgrade and of ballasted trackbed, named as T1, T2, T3, and T4, respectively. The results showed that the range of peak vertical accelerations on the top of subgrade surface of T2 and T4 were smaller than T1 and T3; T1 and T2 perform better in decreasing the maximum vertical deformation of subgrade than T3 and T4; the maximum transversal tensile strain of T4 is almost twice than the other three. The trackbed bears more stress when the asphalt layer is located at the lower part of railway trackbed.