Ertao Lei

Ertao Lei

Auto-generated profile, based on publicly available information

Ertao Lei

Electric Power Research Institute of Guangdong Power Grid Corporation, Guangzhou, China

Research Focus & Metrics

Academic Career Length

11Years (2016-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
26 April 2017 in IEEE Transactions on Power Electronics
Verified
Journal Article
Closed access
ELErtao Lei
Ertao Lei
XYXianggen Yin
Xianggen Yin
ZZZhe Zhang
Zhe Zhang
YCYu Chen
Yu Chen
This paper describes an improved transformer winding tap injection distribution static synchronous compensator (WTI-DSTATCOM) for medium-voltage reactive power compensation. The cascaded multilevel converter based DSTATCOM is connected to the special-designed winding taps on the primary windings of the transformer instead of the conventional point of common coupling. The voltage stress for DSTATCOM to handle is reduced. The winding tap injection (WTI) method can make full use of the spare capacity of the transformer and obtain a flexible connection voltage for DSTATCOM. The compensation mechanism and winding current distribution after currents injection are analyzed by phasor diagrams under steady state. A nonlinear passivity-based control (PBC) algorithm is designed for inner-loop current control and a three-layer voltage balancing control strategy is applied to balance the dc capacitor voltage. The results obtained from the MATLAB/Simulink simulations and a down-scaled laboratory prototype experiment of 800 V verify the feasibility and effectiveness of the proposed WTI-DSTATCOM system with PBC algorithm in reactive power compensation.

18 January 2021 in IEEE Access
Verified
Journal Article
Open access
WZWei Zhao
Wei Zhao
HDHanbin Diao
Hanbin Diao
PLPeiqiang Li
Peiqiang Li
XLXiaoxiu Lv
Xiaoxiu Lv
ELErtao Lei
Ertao Lei
WXWenqi Xue
Wenqi Xue
Implementing integrated electric-heat systems (IEHSs) with coupled power distribution networks and district heating networks is an essential means to solve current energy problems. However, prosumers with multiple energy forms coupled and renewable energy sources with natural uncertainties pose challenges to the operation of IEHSs. This paper proposes a joint energy and reserve dispatch model for IEHSs based on transactive energy, which is a coordinated combination of a bi-level Stackelberg game and two-stage robust optimization. The bi-level Stackelberg game is used to realize the equilibrium of interests among three transacting parties, namely, integrated energy service provider (IESP), multi-carrier prosumer (MCP), and load aggregator (LA). The two-stage robust optimization is employed to ensure the reliability of the system operation under renewable energy uncertainty. In the upper level of the Stackelberg game, the IESP perform pricing and reserve dispatch, while the MCP and LA maximize their benefits via energy management in the lower level. Linearization techniques are utilized to approximate the bi-level Stackelberg game model into a single-level mixed-integer linear programming problem. The converted single-level game model is subsequently regarded as the first stage, while the real-time feasibility check is regarded as the second stage to form a two-stage robust optimization model, which is solved by a modified C&CG algorithm. Case studies demonstrate that the proposed joint energy and reserve dispatch method effectively achieves economic and reliable operation.

1 March 2023 in IEEE Transactions on Industry Applications
Verified
Journal Article
Closed access
JZJunkun Zhang
Junkun Zhang
KMKai Ma
Kai Ma
ELErtao Lei
Ertao Lei
RHRong Han
Rong Han
YLYang Liu
Yang Liu
YMYanjun Ma
Yanjun Ma
Modular input-parallel output-serial (IPOS) DC-DC converter is becoming a crucial solution for high-voltage applications due to its flexible combination form without switching device pressure limitation. It requires high efficiency, fast response, and wide-range output for broader applications. However, the existing solutions cannot simultaneously meet all these requirements. This paper proposes a new hybrid structure with interleaved LLC converters and a DAB converter. The interleaved LLC converters provide the most output voltage with fixed switching frequency and duty cycle, while the DAB converter regulates the output voltage. The wide range output is achieved by switching the LLC converter module and continuously adjusting the output voltage of the DAB converter. Furthermore, a switching control method based on the sliding-mode variable structure is proposed to achieve a smooth and fast output voltage response during the switching process. Finally, a 0.3/0.9-1.8kV, 2kW experimental platform is established to verify the proposed converter's effectiveness and advantages.

11 July 2023 in Energies
Verified
Journal Article
Open access
PDF file
JZJunkun Zhang
Junkun Zhang
ELErtao Lei
Ertao Lei
LJLi Jin
Li Jin
KMKai Ma
Kai Ma
YLYing Li
Ying Li
XWXirui Wang
Xirui Wang
The problem of current sharing imbalance in the parallel connection of IGBT multi-modules affects the wide-scale application of parallel IGBT. The current imbalance problem in the dynamic process is mainly caused by the difference in control loop parameters. In parallel IGBT applications, current sharing is a critical concern. Objective differences in IGBT module and driver circuit parameters, as well as incomplete symmetry in the power circuit, lead to inconsistent parasitic parameters, resulting in both static and dynamic current-sharing issues. Static current sharing refers to the uneven distribution of load current under static operating conditions, while dynamic current sharing refers to the imbalance in current distribution among parallel IGBT modules during turn-on and turn-off processes. This is mainly influenced by the synchronization of turn-on and turn-off timings and the consistency of collector current change rates during these processes. The difference in characteristic parameters of IGBT modules is an important factor leading to the difference in control loop parameters, which has a profound impact on the dynamic current-sharing characteristics of IGBT parallel applications. In the case where the device parameters cannot be changed, some drive compensation controls can compensate for the influence of device differences on dynamic current sharing. Accurate identification of the characteristic parameters of the IGBT module is the key to this method. This paper mainly studies a synchronous variable-amplitude drive scheme and studies the influence of parameters such as synthetic gate resistance, gate-emitter capacitance, and on-off gate threshold voltage on the dynamic current-sharing characteristics. The correlation characteristics of the characteristic parameters of the IGBT device body are studied, and the characteristic model of each parameter and the influencing variable is constructed. The parallel working model of PSpice devices is established, and the influence of different characteristic parameters on the current-sharing characteristics is evaluated, and its sensitivity is summarized through simulation analysis. Through the 1700 V/300 A IGBT parallel switch characteristic experiment, the current sharing effectiveness of the synchronous variable amplitude driving method is verified. Finally, the effects of different gate control voltages and different action times on the dynamic current-sharing characteristics are summarized.

15 October 2025 in International Journal of Electrochemical Science
Verified
Journal Article
Open access
JZJunkun Zhang
Junkun Zhang
LJLi Jin
Li Jin
ZWZhongao Wang
Zhongao Wang
QLQuanhui Li
Quanhui Li
XYXiaoxue Yan
Xiaoxue Yan
CLChao Lyu
Chao Lyu

4 February 2021 in IEEE Access
Verified
Journal Article
Open access
WZWei Zhao
Wei Zhao
WXWenqi Xue
Wenqi Xue
PLPeiqiang Li
Peiqiang Li
XTXuexian Tang
Xuexian Tang
ELErtao Lei
Ertao Lei
XLXiaoxiu Lv
Xiaoxiu Lv
A Real-time electricity market transaction is an important method that is used to realize the interactive balance of source-network-load in a new generation power system. Based on the multi-camp economic choice and the needs of national conditions, the emergence of cluster operators is inevitable. Due to stability and development of photovoltaic users, it is important to evaluate the importance of users in a photovoltaic user group. In the existing model, users are too sensitive to the electricity price, which will lead to too high electricity adjustment rate. In order to make up for the lack of importance ranking research and the high adjustment rate of electricity consumption, this paper will introduce the electric power consumption satisfaction function and propose an optimal pricing model that is based on the master-slave game. The study analyzes the nature of operators’ revenue, and presents a method to calculate the contribution value using the cooperative game theory. The TOPSIS method is proposed to evaluate the ranking of the producers and sellers in the group. The developed illustration verifies the superiority of the cluster economic operation model.