Lei Meng

Lei Meng

Auto-generated profile, based on publicly available information

Lei Meng

Department of Electrical and Electronics Engineering, The Hong Kong Polytechnic University, Hong Kong

Research Focus & Metrics

Academic Career Length

15Years (2012-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
30 March 2023 in Electric Power Systems Research
Verified
Journal Article
Closed access
KJKeijo Jacobs
Keijo Jacobs
Younes Younes SeyediYounes Younes Seyedi
Younes Younes Seyedi
LMLei Meng
Lei Meng
UKUlas Karaagac
Ulas Karaagac
JMJean Mahseredjian
Jean Mahseredjian

20 March 2023 in Electric Power Systems Research
Verified
Journal Article
Closed access
LMLei Meng
Lei Meng
UKUlas Karaagac
Ulas Karaagac
KJKeijo Jacobs
Keijo Jacobs

1 January 2012 in Energy Procedia
Verified
Journal Article
Open access
YGYan Gangui
Yan Gangui
YLYu Liu
Yu Liu
MGMu Gang
Mu Gang
CYCui Yang
Cui Yang
JLJunhui Li
Junhui Li
MLMeng Lei
Meng Lei
In this paper, we propose a method to predict ultra-short term wind power production with chaotic time series. Through analysis of the data measured from real wind farm, the ultra-short term prediction model of wind power is established based on the space theory of chaotic time series phase. The wind power of a real wind farm in northeast China in some future time including 15 m, 30 m and 1h are predicted by the prediction model finally. Test results are presented in the paper

11 April 2025 in IEEE Transactions on Power Delivery
Verified
Journal Article
Closed access
LMLei Meng
Lei Meng
UKUlas Karaagac
Ulas Karaagac
APAhda Pavani
Ahda Pavani
JMJean Mahseredjian
Jean Mahseredjian
KJKeijo Jacobs
Keijo Jacobs
Modern power grids that incorporate inverter-based resources (IBRs) may be vulnerable to persistent oscillations and instability incidents, which jeopardize the reliable operation of the system. Unstable operation conditions can be identified via impedance-based stability assessment (IBSA) methods, provided that accurate frequency-dependent impedance models of the system are available. A promising approach for obtaining such impedance models is to use time-domain simulation scanning techniques based on electromagnetic transient (EMT)-type software. This paper studies and compares five EMT-type impedance scanning methods in terms of their application procedures, analytical relationship between obtained impedances, IBSA accuracies, and computational burdens. Critical technical notifications and guidelines for the selection and application of these scanning methods, considering different types of instabilities, are provided. For accuracy assessment, the IBSA results are compared with EMT simulations on a practical test system.

16 November 2023 in IEEE Access
Verified
Journal Article
Open access
LMLei Meng
Lei Meng
UKUlas Karaagac
Ulas Karaagac
MGMohsen Ghafouri
Mohsen Ghafouri
ASAnton Stepanov
Anton Stepanov
JMJean Mahseredjian
Jean Mahseredjian
Ilhan KocarIlhan Kocar
Ilhan Kocar
This paper demonstrates the risk of a new control interaction phenomenon between a large-scale type-4 wind park (WP) and a 500 kV transmission grid at super-synchronous frequency range. This study aims at (i) using the impedance-based stability assessment (IBSA) method to investigate this new interaction phenomenon; and (ii) analyzing the impact of various transmission grid topologies, WP operating conditions as well as wind turbine (WT) converter control parameters on the severity of the interaction. For ultimate accuracy, the frequency-dependent impedance characteristics of the WP are extracted using the electromagnetic transient (EMT)-type impedance scanning instead of simplified analytical model. The performed analyses demonstrate that the WP generation capacity, length of the transmission lines, applied series and shunt compensation levels, presence of parallel lines, and grid side converter (GSC) control parameters of the WT, can significantly affect the identified control interaction risk. The obtained results are validated through detailed EMT simulations. Although the type-4 WP is considered in this paper, the presented results can be generalized to any inverter-based resource (IBR) with full-size converter (FSC), such as photovoltaic (PV) power stations.

8 December 2023 in Energy Reports
Verified
Journal Article
Open access
LMLei Meng
Lei Meng
TXTao Xue
Tao Xue
UKUlas Karaagac
Ulas Karaagac
LCLijun Cai
Lijun Cai