14 February 2023 in IEEE Transactions on Power Systems
With the increasing penetration of primarily inertia-less distributed energy resources, allowable delay in the fast frequency reserve provision to ensure marginal stability condition can become comparable with the requisite dead-time for fast-switching in a radial power distribution system (PDS) connected to the transmission system. Consequently, the prevailing short-duration load-generation imbalance might propagate as system-wide frequency excursion in the future power system, which traditionally has not been observed. Furthermore, during the fast-switching, some of the fast-acting reserve (FAR) providing local generators remain inaccessible to the bulk power system (BPS). This work has answered the questions of requisite reserve requirements to cater to such events through efficient energy and FAR provision joint-scheduling. Stochasticity of fast-switching, with temporary faults as a use-case, requires modeling of load-generation imbalance and local resource unavailability, vis-á-vis FAR requirement problem, as a chance-constraint. Due to the limited visibility at the BPS level, PDS operators must ensure sufficient FAR availability for a given confidence level of the chance-constraint. Individual chance-constraints are used to ensure mathematical simplicity. Here, the PDS is operated as a virtual power plant (VPP), where the operator can procure resources locally or from the wholesale market with the aim of profit maximization before the contingency occurs. Results show that FAR requirements can influence the local energy schedule and raise energy costs. Furthermore, the confidence level of the chance-constraint can impact overall profitability, and FAR should be scheduled carefully. Comparative analysis with a modified benchmark IEEE 33-node radial test system and a 98-node test system shows the superior performance of the proposed approach. The impact of the limited available FAR is also demonstrated.
29 December 2020 in IEEE Transactions on Power Delivery
Voltage sag mitigation utilizing dynamic voltage restorers (DVRs) can be classified as a common-pool resource (CPR) good. However, the ability of DVRs in improving voltage sag performance of only downstream customers provides the ability to exclude the non-contributors selectively. Therefore, unlike traditional CPR goods, the DVR allocation problem can give rise to partial excludability. Here, the non-collocated customers have been divided into feasible clusters through suitable positioning of DVRs using the proposed graph-partitioning principle. In the absence of trustworthiness, especially with the participation of electricity supply companies, the participants may ask an external agent and share their willingness-to-pay information to design the optimal set of clusters. Alternatively, the customers, including electricity supply companies, can also share internal information as an open system. Strategies for sharing internal information to avoid free-riding are also discussed. The utility distribution would ensure the viability of contribution group formation. Here, the results from three different utility-distributing solution concepts, such as an alternative definition of the core, the nucleous, and Shapley value, are compared. The simulation results are numerically verified for a small scale system and validated utilizing a large scale system. The proposed methodology can be used for any real-world system that follows similar properties.
1 June 2007 in 2007 IEEE Power Engineering Society General Meeting
Sympathetic inrush current phenomenon occurs when a transformer is switched on in a power system network containing other transformers which are already energized. In this paper, the phenomenon of sympathetic inrush current is investigated using nonlinear-transient field-circuit coupled finite element formulation. The cases of the transformers connected in parallel and in series have been considered. The results obtained for a 31.5 MVA, three-phase transformer are presented and discussed in detail. This work also includes the investigation of parameters affecting the magnitude and duration of sympathetic inrush phenomenon, such as series resistance, switching-on angle, residual flux density and load conditions. These analyses provide a sound theoretical basis for a thorough understanding of the phenomenon.
11 March 2024 in e-Prime - Advances in Electrical Engineering, Electronics and Energy
1 January 2013 in IET Electric Power Applications
Mechanical deformations of transformer windings are identified through variations observed in their frequency response (FR). This study proposes a new way of determining a transfer function (TF) from measured FR data using factorisation principles as against established ways of finding it through rational fitting algorithms or least‐square estimation. It is observed that some characteristics of FR of a transformer winding are similar to FR of first‐ and second‐order systems, and this has been the basic motivation for the reported work. In the proposed method, TF is expressed as a combination of first‐ and second‐order polynomials. The algorithm is applicable over a wide‐frequency range and for high‐order systems. Initial guesstimates for locations of poles/zeros, orders of TFs, and enforcement of poles to the left half of the s‐plane are not required. The algorithm is validated through three case studies and its accuracy is checked through commonly used statistical indicators. The application of the algorithm is also demonstrated on a 500 kVA distribution transformer. The method is simple and accurate in estimating TFs for their further use in the deformation diagnostics of transformer windings.
26 July 2021 in IEEE Transactions on Instrumentation and Measurement
Energy losses during the magnetization process of soft magnetic laminations depend on the excitation waveform. Manufacturers of magnetic materials may not provide losses for different excitation waveforms. This may affect the accuracy of the predicted losses which are used to estimate the performance of electrical equipment during the predesign stage. Thus, a characterization tool which is capable of measuring hysteresis loops under controlled magnetization is required. Digital characterization systems available in literature use expensive commercial power amplifiers. In this work, a cost-effective power amplifier circuit is developed and interfaced with a LabVIEW program to characterize soft magnetic materials. The measurements for a sinusoidal excitation from the proposed setup are validated with those from a standard commercial measuring setup. The system is also used to measure hysteresis loops for arbitrary magnetization conditions (magnetic flux density ( B) with harmonics). The proposed setup can operate over a frequency range 35-500 Hz. A small Epstein frame is also designed for measurements at higher frequencies (>200 and <; 500 Hz). A provision is also made to predict three components of dynamic hysteresis losses at any frequency in the above range using the loss separation approach. This capability of the setup enables the user to predict the losses at frequencies beyond the capability of the tool. The predicted losses using this algorithm are validated with measured losses. The proposed setup is cost-effective and can be developed easily using basic electronic components.