Felix Wald

Felix Wald

Auto-generated profile, based on publicly available information

Felix Wald

Karlsruhe Institute of Technology, Institute for Technical Physics, Eggenstein-Leopoldshafen, Germany

Research Focus & Metrics

Academic Career Length

4Years (2023-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
17 January 2023 in IEEE Transactions on Power Delivery
Verified
Journal Article
Open access
FWFelix Wald
Felix Wald
QTQiucen Tao
Qiucen Tao
GCGiovanni De Carne
Giovanni De Carne
The reduced amount of large synchronous generators results in the need for fast, flexible, and intelligent power distribution devices to enhance the inertia in the modern power system. This paper proposes a new approach to control an asynchronous low-voltage grid connection, employing a virtual synchronous machine with frequency-based power control. The grid-forming converter, receiving the primary side frequency measurement, varies the fed grid frequency on the secondary side artificially, to interact with frequency-dependent resources. This enables the adjustment of the consumed or generated power in the fed grid without the need for additional communication infrastructure, and thus supports the frequency control of the mains. The performance of the proposed frequency control has been validated through simulation and using a newly developed double Power Hardware-in-the-Loop experimental test setup.

28 May 2025 in IEEE Transactions on Smart Grid
Verified
Journal Article
Open access
FWFelix Wald
Felix Wald
VHV. M. Hrishikesan
V. M. Hrishikesan
Oriol Gomis-BellmuntOriol Gomis-Bellmunt
Oriol Gomis-Bellmunt
HAORAN JIHAORAN JI
HAORAN JI
MDMasoud Davoudi
Masoud Davoudi
GCGiovanni De Carne
Giovanni De Carne
Distribution systems have traditionally received the least attention in the bulk picture of power systems; they are yet the most "critical component" as they directly impact customers’ perception and utilities’ reputation. While transmission systems have seen abundant literature, innovations, and applications of power electronic-based devices to optimize their performance, distribution systems still require more attention toward a flexible and dynamic scheme to cope with volatile energy consumption and production. As a replacement or enhancement of the traditional ones, Solid-State Transformers can play a central role in the energy management of distribution systems towards this goal, in addition to the mere voltage conversion. This manuscript, developed within the IEEE Task Force on Solid-State Transformer integration in distribution grids, offers a critical review of the Solid-State Transformer potential, services, and technical challenges for its integration in distribution systems. Particular attention is given to scientific trends and open points in the current research that must be addressed before utilities extensively integrate the Solid-State Transformer in distribution systems.

20 February 2026 in IEEE Open Journal of Power Electronics
Verified
Journal Article
Open access
GCGiovanni De Carne
Giovanni De Carne
Georg LaussGeorg Lauss
Georg Lauss
SDSalvatore D'arco
Salvatore D'arco
SSSrdjan Srdic
Srdjan Srdic
FWFriedrich Wiegel
Friedrich Wiegel
Johan EnslinJohan Enslin
Johan Enslin
Power Hardware-In-the-Loop (PHIL) testing is a powerful approach that combines the flexibility of numerical simulations with the high fidelity of hardware tests to allow experimental validation of electrical equipment in a close-to-reality laboratory environment. This is enabled by using specially designed software and hardware that serve as an interface between the modeled environment and the equipment under test. Using PHIL for testing and validation can help significantly reduce time-to-market for novel energy solutions by both reducing the number of design/prototyping iterations, which in turn reduces the development costs, and the need for timely and costly field tests later during the system validation stage. The PHIL as a technology has been studied over the last 20 years, focusing mostly on the software/hardware interfaces and on system stability challenges. However, there has not been a consensus yet on how a PHIL system should be designed, validated and operated to maximize its benefits. The present work provides answers to these questions. Starting from the existing research experience and use cases, the present paper introduces practical guidelines for PHIL modeling, design, laboratory implementation and validation, and it identifies a few remaining open topics that need to be addressed to enable wider adoption of PHIL for testing and validation of electrical equipment in industrial environments.

26 January 2026 in IEEE Transactions on Power Delivery
Verified
Journal Article
Open access
FWFelix Wald
Felix Wald
ASAmir Sajadi
Amir Sajadi
BMBarry Mather
Barry Mather
GCGiovanni De Carne
Giovanni De Carne
This paper presents an integration study for the recent power electronic-based fast-frequency response technology, “asynchronous grid connection” which operates as an aggregator for behind-the-meter resources and distributed generators. Both technical feasibility and techno-economic viability studies are presented. The fast-frequency response characteristics, validated against Power Hardware-in-the-Loop experiments, are integrated into an IEEE 9-bus system in DigSilent PowerFactory for system-level dynamic analysis. It demonstrates that droop-based control enhancements to local distributed generators allow their aggregation to provide grid-supporting functionalities and participate in the ancillary service markets. To this end, a long-term simulation embedding the system within the ancillary service market framework of PJM has been performed. The fast-frequency response regulation is subsequently used to calculate the potential revenue and project the results on a 15-year investment horizon. Finally, the techno-economic analysis provides recommendations for enhancements to access the full potential of distributed generators on a technical and regulatory level.

25 June 2023
Verified
Conference Paper
Closed access
FWFelix Wald
Felix Wald
QTQiucen Tao
Qiucen Tao
GCGiovanni De Carne
Giovanni De Carne
The reduced amount of large synchronous generators results in the need for fast, flexible, and intelligent power distribution devices to enhance the inertia in the modern power system. This paper proposes a new approach to control an asynchronous low-voltage grid connection, employing a virtual synchronous machine with frequency-based power control. The grid-forming converter, receiving the primary side frequency measurement, varies the fed grid frequency on the secondary side artificially, to interact with frequency-dependent resources. This enables the adjustment of the consumed or generated power in the fed grid without the need for additional communication infrastructure, and thus supports the frequency control of the mains. The performance of the proposed frequency control has been validated through simulation and using a newly developed double Power Hardware-in-the-Loop experimental test setup.