Đorđe Lekić

Đorđe Lekić

Auto-generated profile, based on publicly available information

Đorđe Lekić

Faculty of Electrical Engineering, University of Belgrade, Belgrade, Serbia

Research Focus & Metrics

Academic Career Length

11Years (2016-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 March 2022 in Energy
Verified
Journal Article
Closed access
Čedomir ZeljkovićČedomir Zeljković
Čedomir Zeljković
PMPredrag Mršić
Predrag Mršić
BEBojan Erceg
Bojan Erceg
ĐLĐorđe Lekić
Đorđe Lekić
NKNemanja Kitić
Nemanja Kitić
PMPetar Matić
Petar Matić

15 August 2019 in IEEE Transactions on Power Delivery
Verified
Journal Article
Closed access
DLDorde M. Lekic
Dorde M. Lekic
PMPredrag D. Mrsic
Predrag D. Mrsic
BEBojan B. Erceg
Bojan B. Erceg
Čedomir ZeljkovićČedomir Zeljković
Čedomir Zeljković
NKNemanja S. Kitic
Nemanja S. Kitic
PMPetar R. Matic
Petar R. Matic
Noninvasive contactless methods for electric power line monitoring based on magnetic field measurement have become an interesting topic for researchers and the electric power industry since introduction of the Smart Grid concept. By measuring and analyzing magnetic field originating from currents in power line conductors, it is possible to detect faults in the network. In medium voltage distribution networks, where a variety of different pole geometries are present, different criteria for fault detection have to be employed for each geometry, which complicates detection and influences accuracy. This paper proposes a novel approach for fault detection in medium voltage distribution networks which is based on processing of signals measured by low cost contactless magnetic field sensors. In order to create a generalized method for fault detection, a sequence of mathematical transformations of the measured magnetic field components is applied. A novel geometric transformation which eliminates influence of pole geometry is introduced, providing signals from which steady-state symmetrical components of the rotating magnetic field are computed. Those components are used as general fault detection criteria. The proposed approach is confirmed to be applicable for different fault types by a set of experiments on three-phase overhead power line model scaled to laboratory conditions.

1 September 2018 in International Journal of Electrical Power & Energy Systems
Verified
Journal Article
Closed access
ĐLĐorđe Lekić
Đorđe Lekić
SVSlobodan Vukosavić
Slobodan Vukosavić

1 November 2018
Verified
Conference Paper
Closed access
PMPredrag Mrsic
Predrag Mrsic
Čedomir ZeljkovićČedomir Zeljković
Čedomir Zeljković
DLDorde Lekic
Dorde Lekic
BEBojan Erceg
Bojan Erceg
PMPetar Matic
Petar Matic
PBPrzemyslaw Balcerek
Przemyslaw Balcerek
In this paper a methodology for determining proper number and positions of fault passage indicators (FPIs) in medium voltage distribution networks with installed fault locators (FLs) is proposed and discussed. The main goal is to achieve the techno-economic balance, by obtaining maximum improvement of the reliability indices while using the minimum number of FPIs. The method is verified by Monte Carlo simulation on a real combined urban/rural distribution network in Bosnia and Herzegovina. The purpose of the simulation tests is to assess performance of the proposed methodology, as well as to discuss the results and propose potential actions required to improve their reliability for several possible scenarios: the use of FLs only, the use of FPIs only and the combined use of FLs and FPIs.

3 June 2020 in IET Electric Power Applications
Verified
Journal Article
Open access
PDF file
ĐLĐorđe M. Lekić
Đorđe M. Lekić
SVSlobodan N. Vukosavić
Slobodan N. Vukosavić
In this study the authors propose a generalised procedure for computationally efficient steady‐state finite element (FE) simulation of symmetrical multiphase permanent magnet (PM) AC machines with an arbitrary number of phases. The procedure is based on newly derived general equations for phase waveform reconstruction that fully exploit the phase symmetry of multiphase electrical machines. This result can be used to reconstruct the full electrical period of any phase waveform from the smallest possible number of magnetostatic FE simulations executed within the minimum angular displacement of the rotor. Reconstruction of phase waveforms is done during post‐processing and does not contribute to the execution time of FE simulations. The applicability of the proposed method is demonstrated by deriving specific equations for two‐phase, three‐phase, five‐phase and six‐phase machines. Results of classical time‐stepping and newly proposed computationally efficient FE simulation are presented for four rotor PM flux switching machines with the different number of phases. Obtained results show that the relative reduction of simulation time increases with the number of machine phases.

9 February 2022 in Electrical Engineering
Verified
Journal Article
Closed access
PDF file
ĐLĐorđe M. Lekić
Đorđe M. Lekić
SVSlobodan N. Vukosavić
Slobodan N. Vukosavić