This paper describes recent results of the MedFasee-Eletrosul project aiming at the development and performance testing of a Wide Area Measurement System (WAMS) prototype and its applications for monitoring of power system operation. The prototype consists of a Phasor Data Concentrator (PDC) and four Phasor Measurement Units (PMUs) installed in the Eletrosul transmission system. The PMU, the PDC and the communication system are described as well as the main requirements and operational capability. The installation characteristics and the prototype performance are described. Applications for power flow and transmission line parameters calculations, frequency, phase angle and voltage monitoring and identification of eletromechanical oscillation modes, are presented.
In this paper, a methodology for validating and calibrating dynamic models in large interconnected power systems using synchronized measurements, is presented. The approach combines topological cuts at several hierarchical levels with Hybrid Dynamic Simulation (HDS), allowing the systematic validation of network partitions or indication of partitions with model inaccuracies. Discrepancy indicators computed from Phasor Measurement Units (PMU) data are employed for both, validation and detection of modeling inaccuracies. Once discrepancies are located, a calibration procedure is applied, which is formulated as an optimization problem and solved using Genetic Algorithms. The methodology is assessed on a test system using synthetic measurements and on the Brazilian Interconnected Power System (BIPS) using real disturbance records. The results indicate the effectiveness of the proposed methodology for model validation, the identification of inaccuracy sources, and model calibration.