4 December 2017 in IEEE Transactions on Applied Superconductivity
A next step of energy increase of hadron colliders beyond the LHC requires high-field superconducting magnets capable of providing a dipolar field in the range of 16 T in a 50-mm aperture with accelerator quality. These characteristics could meet the requirements for an upgrade of the LHC to twice the present beam energy or for a 100-TeV center of mass energy future circular collider. This paper summarizes the activities and plans for the development of these magnets, in particular within the 16 T Magnet Technology Program, the WP5 of the EuroCirCol, and the U.S. Magnet Development Program.
8 February 2017 in IEEE Transactions on Applied Superconductivity
The High Luminosity LHC Project at CERN entered into the production phase in October 2015 after the completion of the design study phase. In the meantime, the development of the 11 T dipole needed for the upgrade of the collimation system of the machine made significant progress with very good performance of the first two-in-one magnet model of 2-m length made at CERN. The 11 T dipole, which is more powerful than the current main dipoles of LHC, can be made shorter with an equivalent integrated field. This will allow creating space for the installation of additional collimators in specific locations of the dispersion suppressor regions. Following tests carried out during heavy ions runs of LHC in the end of 2015, and a more recent review of the project budget, the installation plan for the 11 T dipole was revised. Consequently, one 11 T dipole full assembly containing two 11 T dipoles of 5.5-m length will be installed on either side of interaction point 7. These two units shall be installed during the long shutdown 2 in years 2019-2020. After a brief reminder on the design features of the magnet, this paper describes the current status of the development activities, in particular the short model programme and the construction of the first full scale prototype at CERN. Critical operations like the reaction treatment and the coil impregnation are discussed, the quench performance tests results of the two-in-one model are reviewed and finally, the plan towards the production for the long shut down 2 is described.
30 April 2018 in IEEE Transactions on Applied Superconductivity
The high-luminosity Large Hadron Collider (HL-LHC) project aims at allowing to increase the collisions in the LHC by a factor of ten in the decade 2025-2035. One essential element is the superconducting magnet around the interaction region points, where the large aperture magnets will be installed to allow to further reduce the beam size in the interaction point. The core of this upgrade is the Nb3Sn triplet, made up of 150-mm aperture quadrupoles in the range of 7-8 m. The project is being shared between the European Organization for Nuclear Research and the US Accelerator Upgrade Program, based on the same design, and on the two strand technologies. The project is ending the short model phase, and entering the prototype construction. We will report on the main results of the short model program, including the quench performance and field quality. A second important element is the 11 T dipole that replaces a standard dipole making space for additional collimators. The magnet is also ending the model development and entering the prototype phase. A critical point in the design of this magnet is the large current density, allowing increase of the field from 8 to 11 T with the same coil cross section as in the LHC dipoles. This is also the first two-in-one Nb3Sn magnet developed so far. We will report the main results on the test and the critical aspects.
11 December 2013 in Nuclear Fusion
Construction of the ITER magnet systems has been started at the end of 2007 following the signature of the first procurement arrangements (PA) for the toroidal field (TF) conductors. Six ITER members are involved in the share of the ITER magnet components and, to date, eighteen PA between the ITER Organization and six domestic agencies have been signed. Substantial progress towards full-scale construction has been achieved with the placement of the first large manufacturing contracts, the production of several tens of tons of advanced Nb3Sn and NbTi strand, and the set-up of large cabling and jacketing facilities. The detailed design of the coils and support structures has also been finalized. The qualification of the fabrication processes for the TF coils and poloidal field (PF) coils has been initiated. The detailed design of the central solenoid (CS) coils is being developed. The design of the correction coils (CCs) with their support structures has been finalized, as well as for the TF gravity supports and clamps of the PF coils. The manufacture of prototypes of the feeder lines and current leads has been started, while ITER is in charge of the procurement of the required magnet instrumentation. This paper provides a progress report on the ITER magnet construction as per December 2010.
23 March 2016 in IEEE Transactions on Applied Superconductivity
The High-Luminosity upgrade of the Large Hadron Collider at CERN comprises the implementation of a new generation of high-field superconducting quadrupole and dipole magnets. The dipole fields of up to 12.1 T at nominal current require the use of high-critical-current Nb 3 Sn strand for the fabrication of the coils. These coils will be up to 8 m long and represent the longest Nb 3 Sn coils so far fabricated for operation accelerator magnets. This brittle A15 phase material requires coil winding prior formation of the superconducting material. The development program at CERN includes the construction of 2-m-long models and full-length prototypes by the wind-and-react technique. The process time and temperature uniformity are stringent during heat treatment and performed inside an EN 1.4841 (AISI Type 314) stainless-steel retort furnace with turbulent flow of Ar atmosphere. During the process, the coil is supported inside a reaction fixture made from 316LN. This paper presents temperature uniformity measurements and results from numerical simulations. The goal is to further improve the heat transfer in combination with turbulent flow generated by a ventilation system. This allows optimizing control parameters for improved heat performance during both the ramping and the dwell time.
22 December 2017 in IEEE Transactions on Applied Superconductivity
The production of superconducting magnets for par-ticle accelerators involves high precision assemblies and tight toler-ances, in order to achieve the requirements for their appropriate performance. It is therefore essential to have a strict control and traceability over the geometry of each component of the system, and also to be able to compensate possible inherent deviations com-ing from the production process.